Collective agreements (CLA, CN) and social charges in the canton of Bern
For your sites in the canton of Bern, the collective framework varies according to the sector and the language region. Structural work comes under the National Collective Agreement for the main construction industry in Switzerland (CN), which applies throughout the canton. For the finishing trades the situation is different: the CCT-SOR applies only to the French-speaking part, namely the Bernese Jura, and must be checked trade by trade. In the German-speaking part of the canton, companies refer to local or regional sector agreements. You should examine carefully, with the competent joint committee, which agreement you are subject to before drawing up your labour forecasts, so as to reflect faithfully the working and wage conditions laid down for your sector.
In the Studio, the regional coefficient applied to the base daywork rate is +2%, with Vaud as the reference at 0%. Among the 26 cantons of the reference scale, Bern ranks 10th, on a scale running from −7% to +15%. The employer contributions used are 33.3% for structural work and 24.3% for the finishing trades, including cantonal family allowances (1.9%, compared with 3.4% in Vaud). The other contributions (old-age insurance AVS, unemployment insurance, SUVA, occupational pension LPP, early retirement, daily sickness benefit, joint funds) are the same in every canton.
| Item | Value |
|---|---|
| Regional coefficient on the daywork rate | +2% |
| Family allowances (CAF) of the canton | 1.9% |
| Employer contributions, structural work (CN) | 33.3% |
| Employer contributions, finishing trades | 24.3% |
| Rank among the 26 cantons (coefficient) | 10 /26 |
| Profile | Average gross monthly pay | Reference base (VD) | Bern |
|---|---|---|---|
| Foreman / site supervisor (class V) | 7'250 CHF | 122.00 | 124.45 |
| Experienced qualified bricklayer (class Q) | 6'350 CHF | 108.00 | 110.15 |
| Qualified bricklayer / recent graduate (class A) | 6'000 CHF | 102.00 | 104.05 |
| Skilled worker / federal certificate holder (class B) | 5'650 CHF | 96.00 | 97.90 |
| Labourer / site assistant (class C) | 5'100 CHF | 88.00 | 89.75 |
| Profile | Average gross monthly pay | Reference base (VD) | Bern |
|---|---|---|---|
| Finishing trades foreman (CCT-SOR) | 6'750 CHF | 106.00 | 108.10 |
| Experienced qualified tradesperson (class A) | 6'050 CHF | 96.00 | 97.90 |
| Recently qualified tradesperson (1st to 3rd year after diploma) | 5'500 CHF | 88.00 | 89.75 |
| Skilled worker / federal certificate holder (class B) | 5'300 CHF | 85.00 | 86.70 |
| Finishing trades assistant (class C) | 4'850 CHF | 79.00 | 80.60 |
How to read this table. The “Reference base (VD)” column is the Studio’s reference rate. The “Bern” column multiplies it by 1.02 and rounds to 5 centimes, exactly as the Studio does when you choose this canton. Gross monthly pay is the average wage for the profile.
Site realities in the canton of Bern
Pricing work in the canton of Bern often means dealing with great geographical diversity. In Alpine areas or at altitude, the building season can be shortened by snow and cold, bringing logistical constraints for the delivery of materials and the removal of site installations. In dense town centres, the occupation of public land means planning ahead for the erection of scaffolding, the management of access and municipal road-use permits. In the immediate vicinity of the large lakes, sustained wind and recurrent humidity affect the drying of renders, the treatment of concrete and the choice of temporary protection measures. The organisation of the site must therefore take these weather and accessibility risks into account from the moment the quote is drafted.
Indicative calculation for the “Experienced qualified tradesperson (class A)” profile (finishing trades): CHF 6'050 gross, plus 24.3% of charges and CHF 595 of monthly expenses, divided by 135 productive hours, give a cost price of CHF 60.11 per hour, before overheads and margin. The daywork rate of CHF 97.90/h therefore leaves CHF 37.79 per hour for overheads and profit.
Main towns and municipalities: construction quotes in Bern, Biel/Bienne, Thun and in the canton of Bern
The precise location of your work has a direct effect on your cost prices. Whether your bid concerns Bern, Biel/Bienne, Thun, Burgdorf, Köniz, Langenthal, Interlaken, Gstaad or Saint-Imier, the transport parameters, the altitude, access to the site and the requirements of the municipality often change the actual installation time and the logistics costs. A site in the heart of a built-up area does not carry the same charges as a project in a resort at altitude or in a remote valley. In Studio Devis Suisse you set your project to the canton of Bern to obtain a consistent basis, which it is up to you to refine according to the access conditions specific to the municipality chosen.
- Bern
- Biel/Bienne
- Thun
- Burgdorf
- Köniz
- Langenthal
- Interlaken
- Gstaad
- Saint-Imier
| Town | Difference from the base | Experienced qualified tradesperson (finishing trades) | Experienced qualified bricklayer (structural work) |
|---|---|---|---|
| City of Bern | +5% | 100.80 | 113.40 |
| Biel/Bienne | 0% | 96.00 | 108.00 |
| Interlaken | +6% | 101.75 | 114.50 |
| Gstaad | +20% | 115.20 | 129.60 |
How to read this table. The difference for a town is given relative to the reference base (Vaud = 0%), like the canton’s coefficient. When your site is in one of these towns, this line applies, not the cantonal average. The other municipalities follow the canton’s coefficient.
ERP Art Construction and Soumissions Pro also apply the difference for the town of the site to the full price list.
Cascade of deductions for a quote in the canton of Bern
Between the subtotal of the items and the amount to collect, the Studio follows the same steps for every quote. The order matters: each deduction is calculated on the amount left by the previous one. Example with CHF 10'000 of fixed-price items and the Studio’s default settings (discount 0%, pro-rata account 1.5%, deposit 30%):
| Step | Amount |
|---|---|
| Gross subtotal excl. VAT | 10'000.00 |
| Discount (0%) | 0.00 |
| Pro-rata account (1.5% after discount) | − 150.00 |
| Net total excl. VAT | 9'850.00 |
| VAT 8.1% | + 797.85 |
| Total incl. VAT (rounded to 5 centimes) | 10'647.85 |
| Deposit on order (30% of the total incl. VAT) | 3'194.35 |
How to read this table. You start from the total of the fixed-price items, take away the discount granted, then the pro-rata account (the contribution to the shared costs of the site), calculated on what remains. VAT of 8.1% applies to the net amount, and the total including VAT is rounded to 5 centimes. Discount, pro-rata account, VAT and deposit percentage are set in the Studio; the deposit is printed with its QR-bill at the bottom of the last page.
The deposit is a percentage of the total including VAT, not of the net amount: the client pays the VAT with the first payment, which finances the first weeks of materials and labour without any advance on your part. The Studio rounds the deposit to 5 centimes, like the amount on the QR-bill, so that it matches the expected payment exactly.
SIA standards and QR-bill deposit in the canton of Bern
A quote that mentions SIA 118, a clear pricing method and a deposit payable by SIX QR-bill avoids the three most common disputes: over the conditions, over the price and over payment. The Studio prints each of these elements as sentences to tick, in the language of the quote (French, German, Italian, Romansh or English).
SIA 118 as contractual basis
Tick box (unticked by default).
SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.
Asbestos and pollutants
Ticked by default.
Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).
Rise in material prices
Ticked by default.
Reservation for increases in material prices according to the KBOB indices in force.
Pricing method
Your choice, when printing.
Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).
The QR-bill replaces the old payment slips: it carries your IBAN, the amount of the deposit and the reference of the quote, and the client pays it from their banking app without retyping anything. The Studio draws it from the same figures as the total, so the amount paid cannot differ from the quote. To go further than a one-off quote:
Frequently asked questions about quotes in the canton of Bern
How do I choose the right agreement for a quote in the Bernese Jura compared with the rest of the canton of Bern?
In the canton of Bern, the language divide determines the collective regime that applies to the finishing trades. If your site is in the Bernese Jura, check whether your trade comes under the CCT-SOR. In the German-speaking part, refer to the local sector agreements. Structural work, for its part, remains governed by the CN throughout the canton. If in doubt, consulting the joint committee avoids errors in calculating labour costs.
Which specific installation costs should be allowed for on an urban site?
In town, the footprint of the site often requires paid permits issued by the municipality to occupy the carriageway or the pavements. Your quote items must include the erection of scaffolding adapted to pedestrian passages, temporary signage and the delivery difficulties linked to restricted parking. Describe these services separately so that the client understands the justification for the costs caused by building density.
How do altitude and snow change the pricing of the work?
Altitude restricts the period suitable for outdoor work and complicates logistics. Your forecasts must take account of longer journey times for the teams, higher transport costs for heavy materials and frost-protection measures. It is sensible to state in the bid the seasonal limits for execution, in agreement with site management, to prevent penalties for delay.
Does the humidity around the Bernese lakes call for particular measures in the quote?
Sites beside the lakes are subject to frequent fog, stagnant humidity and gusts of wind. These factors slow the setting of mortars, the application of resins or façade paints. You should provide for reinforced sheeting, air-drying equipment and a realistic spread of the work phases, mentioning these protection measures in the conditions of your quote.
Price another trade in the canton of Bern
Each trade has its own units and its own collective agreement: choose the trade to see the reservations and rates that go with it.
- CFC 112 Demolition & deconstruction
- CFC 201 Earthworks & excavation
- CFC 211 Masonry & structural work
- CFC 213 Structural steelwork
- CFC 214 Carpentry & timber structures
- CFC 221 Joinery & windows
- CFC 222 Sheet-metal work
- CFC 224 Roofing & waterproofing
- CFC 226 Rendering & façade insulation
- CFC 228 Shutters & blinds
- CFC 232 Electrical installations
- CFC 242 Heating & heat generation
- CFC 251 Sanitary installations
- CFC 271 Plastering & drywall
- CFC 272 Metal construction & locksmith work
- CFC 273 Interior joinery
- CFC 281 Floor coverings (tiling, parquet)
- CFC 282 Wall coverings & wall tiling
- CFC 285 Painting & wallpapering
- CFC 287 Final site cleaning
The 26 cantons
The regional coefficient ranges from −7% to +15% depending on the canton: compare before reusing a rate from a neighbouring site.
- Vaud (VD)
- Geneva (GE)
- Valais (VS)
- Fribourg (FR)
- Neuchâtel (NE)
- Jura (JU)
- Bern (BE)
- Zurich (ZH)
- Zug (ZG)
- Basel-Stadt (BS)
- Basel-Landschaft (BL)
- Aargau (AG)
- Solothurn (SO)
- Lucerne (LU)
- Schwyz (SZ)
- Nidwalden (NW)
- Obwalden (OW)
- Uri (UR)
- St. Gallen (SG)
- Thurgau (TG)
- Schaffhausen (SH)
- Appenzell Ausserrhoden (AR)
- Appenzell Innerrhoden (AI)
- Glarus (GL)
- Graubünden (GR)
- Ticino (TI)