Collective agreements (CLA, CN) and social charges in the canton of Appenzell Ausserrhoden
For your sites in the canton of Appenzell Ausserrhoden, the collective-agreement framework depends directly on the nature of your work. The structural work sector is governed at national level by the National Collective Agreement for the main construction industry in Switzerland (CN). By contrast, the CCT-SOR does not apply in this territory, as it is reserved for French-speaking Switzerland. For all the finishing trades and the technical trades, working conditions and minimum wages fall under sector agreements, often regional or cantonal. You should therefore enquire with the competent joint committee to make sure you comply with the scales in force. Studio Devis Suisse includes reference profiles for structural work and the finishing trades, adapted to the canton’s data, to guide you on an indicative basis in your calculations.
In the Studio, the regional coefficient applied to the base daywork rate is −1%, with Vaud as the reference at 0%. Among the 26 cantons of the reference scale, Appenzell Ausserrhoden ranks 19th, on a scale running from −7% to +15%. The employer contributions used are 33.2% for structural work and 24.2% for the finishing trades, including cantonal family allowances (1.85%, compared with 3.4% in Vaud). The other contributions (old-age insurance AVS, unemployment insurance, SUVA, occupational pension LPP, early retirement, daily sickness benefit, joint funds) are the same in every canton. In this canton the Studio applies reference profiles: the result is indicative until you have checked the collective agreement of your sector.
| Item | Value |
|---|---|
| Regional coefficient on the daywork rate | −1% |
| Family allowances (CAF) of the canton | 1.85% |
| Employer contributions, structural work (CN) | 33.2% |
| Employer contributions, finishing trades | 24.2% |
| Rank among the 26 cantons (coefficient) | 19 /26 |
| Profile | Average gross monthly pay | Reference base (VD) | Appenzell Ausserrhoden |
|---|---|---|---|
| Foreman / site supervisor (class V) | 7'250 CHF | 122.00 | 120.80 |
| Experienced qualified bricklayer (class Q) | 6'350 CHF | 108.00 | 106.90 |
| Qualified bricklayer / recent graduate (class A) | 6'000 CHF | 102.00 | 101.00 |
| Skilled worker / federal certificate holder (class B) | 5'650 CHF | 96.00 | 95.05 |
| Labourer / site assistant (class C) | 5'100 CHF | 88.00 | 87.10 |
| Profile | Average gross monthly pay | Reference base (VD) | Appenzell Ausserrhoden |
|---|---|---|---|
| Finishing trades foreman (CCT-SOR) | 6'750 CHF | 106.00 | 104.95 |
| Experienced qualified tradesperson (class A) | 6'050 CHF | 96.00 | 95.05 |
| Recently qualified tradesperson (1st to 3rd year after diploma) | 5'500 CHF | 88.00 | 87.10 |
| Skilled worker / federal certificate holder (class B) | 5'300 CHF | 85.00 | 84.15 |
| Finishing trades assistant (class C) | 4'850 CHF | 79.00 | 78.20 |
How to read this table. The “Reference base (VD)” column is the Studio’s reference rate. The “Appenzell Ausserrhoden” column multiplies it by 0.99 and rounds to 5 centimes, exactly as the Studio does when you choose this canton. Gross monthly pay is the average wage for the profile.
Site realities in the canton of Appenzell Ausserrhoden
Pricing work in Appenzell Ausserrhoden is best done by taking into account the constraints specific to pronounced Alpine relief. The average altitude and the harshness of the winters often shorten the season suitable for outdoor operations, which calls for careful planning with site management and the client. Regular snowfall may make it necessary to plan ahead for the protection of the works, sheeting and the clearing of work areas in accordance with the applicable rules. In addition, access to certain isolated plots or plots on steep slopes sometimes requires vehicles with enhanced traction or specific transhipments of materials. The supply logistics for concrete or prefabricated elements must therefore be assessed carefully from the preparation of your quote in order to protect your margin.
Indicative calculation for the “Experienced qualified tradesperson (class A)” profile (finishing trades): CHF 6'050 gross, plus 24.2% of charges and CHF 595 of monthly expenses, divided by 135 productive hours, give a cost price of CHF 60.07 per hour, before overheads and margin. The daywork rate of CHF 95.05/h therefore leaves CHF 34.98 per hour for overheads and profit.
Main towns and municipalities: construction quotes in Herisau, Teufen, Heiden and in the canton of Appenzell Ausserrhoden
To draw up a construction quote in Herisau, the precise place of your work has a notable effect on the sizing of transport, labour and logistics costs. Whether your site is located in Herisau, Teufen, Heiden, Speicher or Urnäsch, the altitude, the weather conditions and the layout of the access routes vary appreciably from one project to another. Work on a valley floor or on the heights of Appenzell does not generate the same approach costs for your teams and your suppliers. Studio Devis Suisse applies the canton’s parameter framework to secure your bases of calculation, then lets you fine-tune your items according to the real particularities of the terrain and of the municipality where you are working.
- Herisau
- Teufen
- Heiden
- Speicher
- Urnäsch
| Town | Difference from the base | Experienced qualified tradesperson (finishing trades) | Experienced qualified bricklayer (structural work) |
|---|---|---|---|
| Herisau | −1% | 95.05 | 106.90 |
How to read this table. The difference for a town is given relative to the reference base (Vaud = 0%), like the canton’s coefficient. When your site is in one of these towns, this line applies, not the cantonal average. The other municipalities follow the canton’s coefficient.
ERP Art Construction and Soumissions Pro also apply the difference for the town of the site to the full price list.
Cascade of deductions for a quote in the canton of Appenzell Ausserrhoden
Between the subtotal of the items and the amount to collect, the Studio follows the same steps for every quote. The order matters: each deduction is calculated on the amount left by the previous one. Example with CHF 10'000 of fixed-price items and the Studio’s default settings (discount 0%, pro-rata account 1.5%, deposit 30%):
| Step | Amount |
|---|---|
| Gross subtotal excl. VAT | 10'000.00 |
| Discount (0%) | 0.00 |
| Pro-rata account (1.5% after discount) | − 150.00 |
| Net total excl. VAT | 9'850.00 |
| VAT 8.1% | + 797.85 |
| Total incl. VAT (rounded to 5 centimes) | 10'647.85 |
| Deposit on order (30% of the total incl. VAT) | 3'194.35 |
How to read this table. You start from the total of the fixed-price items, take away the discount granted, then the pro-rata account (the contribution to the shared costs of the site), calculated on what remains. VAT of 8.1% applies to the net amount, and the total including VAT is rounded to 5 centimes. Discount, pro-rata account, VAT and deposit percentage are set in the Studio; the deposit is printed with its QR-bill at the bottom of the last page.
The deposit is a percentage of the total including VAT, not of the net amount: the client pays the VAT with the first payment, which finances the first weeks of materials and labour without any advance on your part. The Studio rounds the deposit to 5 centimes, like the amount on the QR-bill, so that it matches the expected payment exactly.
SIA standards and QR-bill deposit in the canton of Appenzell Ausserrhoden
A quote that mentions SIA 118, a clear pricing method and a deposit payable by SIX QR-bill avoids the three most common disputes: over the conditions, over the price and over payment. The Studio prints each of these elements as sentences to tick, in the language of the quote (French, German, Italian, Romansh or English).
SIA 118 as contractual basis
Tick box (unticked by default).
SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.
Asbestos and pollutants
Ticked by default.
Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).
Rise in material prices
Ticked by default.
Reservation for increases in material prices according to the KBOB indices in force.
Pricing method
Your choice, when printing.
Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).
The QR-bill replaces the old payment slips: it carries your IBAN, the amount of the deposit and the reference of the quote, and the client pays it from their banking app without retyping anything. The Studio draws it from the same figures as the total, so the amount paid cannot differ from the quote. To go further than a one-off quote:
Frequently asked questions about quotes in the canton of Appenzell Ausserrhoden
How do I adapt a structural work quote to the conditions of Appenzell Ausserrhoden?
It is important to calibrate your output by taking account of the Alpine topography and the favourable weather window. For labour, apply the guidelines of the CN while including additional time for making the site safe for winter, clearing access routes or sheeting the formwork. Also allow for transport costs suited to winding roads or steep gradients, which are often essential to bring plant and materials onto the client’s plot.
Which collective agreement should be used for the finishing trades in this canton?
As the CCT-SOR does not apply here, you must refer to the sector agreements applicable in Eastern Switzerland or at cantonal level, depending on your trade. It is useful to consult the competent joint committee to find out the declaration procedures and the reference wages. In the tool, use the indicative finishing-trades profile, adjusted to the regional parameters, to establish your labour accounts for daywork or your unit prices.
Must SIA standard 118 be applied on a site in Appenzell?
SIA standard 118 applies only if the parties expressly agree to it in the contract for work binding the contractor to the client. In the absence of a specific clause adopting it, it is generally the rules of Swiss contract law that apply, in particular Articles 373 and 374 of the CO. If the contract incorporates SIA 118, the standard specifies the measurement procedures, the periods for notifying defects and the handling of a retention.
How do I build the standard item catalogue (CAN) into tenders?
The standard item catalogue published by the CRB frequently serves as the basis for calls for tenders drawn up by architects’ offices and site management. To respond to them effectively, take care to reproduce the text of each CAN item faithfully without altering its heading, while checking that your supplies, installation times and costs of access on slopes are correctly distributed in your unit prices excluding VAT.
Price another trade in the canton of Appenzell Ausserrhoden
Each trade has its own units and its own collective agreement: choose the trade to see the reservations and rates that go with it.
- CFC 112 Demolition & deconstruction
- CFC 201 Earthworks & excavation
- CFC 211 Masonry & structural work
- CFC 213 Structural steelwork
- CFC 214 Carpentry & timber structures
- CFC 221 Joinery & windows
- CFC 222 Sheet-metal work
- CFC 224 Roofing & waterproofing
- CFC 226 Rendering & façade insulation
- CFC 228 Shutters & blinds
- CFC 232 Electrical installations
- CFC 242 Heating & heat generation
- CFC 251 Sanitary installations
- CFC 271 Plastering & drywall
- CFC 272 Metal construction & locksmith work
- CFC 273 Interior joinery
- CFC 281 Floor coverings (tiling, parquet)
- CFC 282 Wall coverings & wall tiling
- CFC 285 Painting & wallpapering
- CFC 287 Final site cleaning
The 26 cantons
The regional coefficient ranges from −7% to +15% depending on the canton: compare before reusing a rate from a neighbouring site.
- Vaud (VD)
- Geneva (GE)
- Valais (VS)
- Fribourg (FR)
- Neuchâtel (NE)
- Jura (JU)
- Bern (BE)
- Zurich (ZH)
- Zug (ZG)
- Basel-Stadt (BS)
- Basel-Landschaft (BL)
- Aargau (AG)
- Solothurn (SO)
- Lucerne (LU)
- Schwyz (SZ)
- Nidwalden (NW)
- Obwalden (OW)
- Uri (UR)
- St. Gallen (SG)
- Thurgau (TG)
- Schaffhausen (SH)
- Appenzell Ausserrhoden (AR)
- Appenzell Innerrhoden (AI)
- Glarus (GL)
- Graubünden (GR)
- Ticino (TI)