3D rendering of a contemporary detached house and its garden – construction quote template for the canton of Uri (UR)

Canton of Uri · Daywork 0% · CN and sector agreements

Construction quote in the canton of Uri: collective agreements, social charges and QR-bill deposit

Price a quote in the canton of Uri at the right hourly cost, apply discount, pro-rata account and VAT in sequence, then collect the deposit by SIX QR-bill.

In the canton of Uri, the Studio applies a regional coefficient of 0% to the reference daywork rate, and employer contributions of 33.3% for structural work and 24.3% for the finishing trades, of which 1.95% is family allowances. Before VAT of 8.1%, your quote still has to absorb the pro-rata account, the discount and the 135 productive hours (out of 176 paid): the Studio applies these deductions in sequence and generates the QR-bill for the deposit. Collective agreement for the finishing trades to be checked: the CCT-SOR covers only French-speaking Switzerland.

Studio Devis SuisseSIA & QR-bill editor · Construction companies
CHF 0 · No account
  • A4 PDF ready to sign
  • SIX QR-bill built in
  • 100% in the browser

Free manual entry · 14’045 ACIP prices & cantons in Soumissions Pro →

Collective agreements (CLA, CN) and social charges in the canton of Uri

In the canton of Uri, structural work sites fall under the National Collective Agreement for the main construction industry in Switzerland (CN), applied throughout Swiss territory. For the finishing trades and building services, the CCT-SOR does not apply, as its scope is reserved for French-speaking Switzerland. Companies working in Uri therefore refer to the sector collective labour agreements, often negotiated at cantonal or regional level, or even declared generally applicable. It is useful to check the customary wages, the status of travel allowances and the provisions in force with the competent joint committee before settling on a cost price. The calculation profiles offered in the software provide an indicative basis, established for structural work or the finishing trades and weighted according to the cantonal context.

In the Studio, the regional coefficient applied to the base daywork rate is 0%, with Vaud as the reference at 0%. Among the 26 cantons of the reference scale, Uri ranks 15th, on a scale running from −7% to +15%. The employer contributions used are 33.3% for structural work and 24.3% for the finishing trades, including cantonal family allowances (1.95%, compared with 3.4% in Vaud). The other contributions (old-age insurance AVS, unemployment insurance, SUVA, occupational pension LPP, early retirement, daily sickness benefit, joint funds) are the same in every canton. In this canton the Studio applies reference profiles: the result is indicative until you have checked the collective agreement of your sector.

Charges and coefficient for the canton of Uri
ItemValue
Regional coefficient on the daywork rate0%
Family allowances (CAF) of the canton1.95%
Employer contributions, structural work (CN)33.3%
Employer contributions, finishing trades24.3%
Rank among the 26 cantons (coefficient)15 /26
Daywork rates in the canton of Uri, structural work (CHF/h excl. VAT)
ProfileAverage gross monthly payReference base (VD)Uri
Foreman / site supervisor (class V)7'250 CHF122.00122.00
Experienced qualified bricklayer (class Q)6'350 CHF108.00108.00
Qualified bricklayer / recent graduate (class A)6'000 CHF102.00102.00
Skilled worker / federal certificate holder (class B)5'650 CHF96.0096.00
Labourer / site assistant (class C)5'100 CHF88.0088.00
Daywork rates in the canton of Uri, finishing trades (CHF/h excl. VAT)
ProfileAverage gross monthly payReference base (VD)Uri
Finishing trades foreman (CCT-SOR)6'750 CHF106.00106.00
Experienced qualified tradesperson (class A)6'050 CHF96.0096.00
Recently qualified tradesperson (1st to 3rd year after diploma)5'500 CHF88.0088.00
Skilled worker / federal certificate holder (class B)5'300 CHF85.0085.00
Finishing trades assistant (class C)4'850 CHF79.0079.00

How to read this table. The “Reference base (VD)” column is the Studio’s reference rate. The “Uri” column multiplies it by 1 and rounds to 5 centimes, exactly as the Studio does when you choose this canton. Gross monthly pay is the average wage for the profile.

Site realities in the canton of Uri

Pricing work in this canton often means dealing with very pronounced Alpine relief and the proximity of bodies of water. Sites located at altitude have a working period reduced by snow and frost, which calls for a tighter organisation of the schedule and suitable winter protection. Access to plots on a slope or on the valley floor may require specific lifting equipment, adapted transport runs and good management of storage areas. Near the lakes and watercourses, exposure to wind and permanent humidity directly affects the drying times of screeds, concretes and external renders. These natural constraints justify detailed planning of the safety measures in line with the requirements of SUVA and of the Construction Work Ordinance (OTConst).

Indicative calculation for the “Experienced qualified tradesperson (class A)” profile (finishing trades): CHF 6'050 gross, plus 24.3% of charges and CHF 595 of monthly expenses, divided by 135 productive hours, give a cost price of CHF 60.11 per hour, before overheads and margin. The daywork rate of CHF 96.00/h therefore leaves CHF 35.89 per hour for overheads and profit.

Main towns and municipalities: construction quotes in Altdorf, Schattdorf, Erstfeld and in the canton of Uri

To draw up an accurate bid in Altdorf, the cantonal capital, or in the municipalities of Schattdorf, Erstfeld, Flüelen and Andermatt, the exact location of the structure strongly determines your execution costs. Differences in altitude, the winter condition of the passes and road access restrictions change the approach costs and the work rate of the teams depending on whether you are working at the water’s edge or in the high mountains. The Studio Devis Suisse tool calibrates its parameters on the reference values of the canton of Uri, while leaving you free to adjust your transport surcharges, your site installations and your labour output to the real topography of the plot.

Cost difference by town, canton of Uri (CHF/h excl. VAT)
TownDifference from the baseExperienced qualified tradesperson (finishing trades)Experienced qualified bricklayer (structural work)
Altdorf0%96.00108.00
Andermatt+18%113.30127.45

How to read this table. The difference for a town is given relative to the reference base (Vaud = 0%), like the canton’s coefficient. When your site is in one of these towns, this line applies, not the cantonal average. The other municipalities follow the canton’s coefficient.

ERP Art Construction and Soumissions Pro also apply the difference for the town of the site to the full price list.

Cascade of deductions for a quote in the canton of Uri

Between the subtotal of the items and the amount to collect, the Studio follows the same steps for every quote. The order matters: each deduction is calculated on the amount left by the previous one. Example with CHF 10'000 of fixed-price items and the Studio’s default settings (discount 0%, pro-rata account 1.5%, deposit 30%):

From the gross subtotal to the deposit (CHF)
StepAmount
Gross subtotal excl. VAT10'000.00
Discount (0%)0.00
Pro-rata account (1.5% after discount)− 150.00
Net total excl. VAT9'850.00
VAT 8.1%+ 797.85
Total incl. VAT (rounded to 5 centimes)10'647.85
Deposit on order (30% of the total incl. VAT)3'194.35

How to read this table. You start from the total of the fixed-price items, take away the discount granted, then the pro-rata account (the contribution to the shared costs of the site), calculated on what remains. VAT of 8.1% applies to the net amount, and the total including VAT is rounded to 5 centimes. Discount, pro-rata account, VAT and deposit percentage are set in the Studio; the deposit is printed with its QR-bill at the bottom of the last page.

The deposit is a percentage of the total including VAT, not of the net amount: the client pays the VAT with the first payment, which finances the first weeks of materials and labour without any advance on your part. The Studio rounds the deposit to 5 centimes, like the amount on the QR-bill, so that it matches the expected payment exactly.

SIA standards and QR-bill deposit in the canton of Uri

A quote that mentions SIA 118, a clear pricing method and a deposit payable by SIX QR-bill avoids the three most common disputes: over the conditions, over the price and over payment. The Studio prints each of these elements as sentences to tick, in the language of the quote (French, German, Italian, Romansh or English).

SIA 118 as contractual basis

Tick box (unticked by default).

SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.

Asbestos and pollutants

Ticked by default.

Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).

Rise in material prices

Ticked by default.

Reservation for increases in material prices according to the KBOB indices in force.

Pricing method

Your choice, when printing.

Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).

The QR-bill replaces the old payment slips: it carries your IBAN, the amount of the deposit and the reference of the quote, and the client pays it from their banking app without retyping anything. The Studio draws it from the same figures as the total, so the amount paid cannot differ from the quote. To go further than a one-off quote:

Frequently asked questions about quotes in the canton of Uri

How do I adapt my transport costs on a quote in the canton of Uri?

The geography of Uri generally makes it advisable to analyse the real journey between your depot and the plot. Depending on whether the site is in the lowlands or in a high valley, driving times, any tunnel tolls and vehicle wear vary appreciably. Provide a separate line for logistics or build a suitable transport coefficient into your unit prices, checking the delivery conditions laid down in the contract for work.

Which rules apply to retention under SIA standard 118?

When SIA standard 118 is incorporated into the contract concluded with the client, a retention adjustable from 0 to 10% may be agreed on the interim payments. It serves to cover the proper execution of the work until acceptance without major defects. The contractor is entitled to replace it with a bank guarantee or an equivalent insurance bond, thereby freeing up liquidity that is valuable for day-to-day cash flow.

Must Swiss VAT of 8.1% be applied to every item of the quote?

All construction, renovation and material supply services intended for a structure located in Switzerland are subject to the standard rate of 8.1%. On your commercial documents, it is advisable to present the subtotal excluding VAT, followed by the exact amount of the tax, to arrive at the total including VAT. At final invoicing, adding a QR-bill that complies with Swiss standards ensures rapid processing by site management.

Which collective agreement applies to a plasterer or an electrician?

As the CCT-SOR does not cover German-speaking Switzerland, companies in the finishing trades and building services must comply with the collective labour agreements of their respective sector, sometimes negotiated at regional or cantonal level. Contact the competent professional joint committee to find out the minimum wages, the applicable charges and any contributions to training funds before finalising your hourly daywork rates.

Price another trade in the canton of Uri

Each trade has its own units and its own collective agreement: choose the trade to see the reservations and rates that go with it.

The 26 cantons

The regional coefficient ranges from −7% to +15% depending on the canton: compare before reusing a rate from a neighbouring site.

Sources and limits. Reference values of Studio Devis Suisse (as at 23.11.2026), CN and CCT-SOR collective agreements, weighted average contribution rates. Indicative only: check the rates of your compensation fund and the collective agreement that applies to your company.