3D rendering of a street lined with apartment buildings, from daytime to dusk – construction quote template for the canton of Appenzell Innerrhoden (AI)

Canton of Appenzell Innerrhoden · Daywork −2% · CN and sector agreements

Construction quote in the canton of Appenzell Innerrhoden: collective agreements, social charges and QR-bill deposit

Price a quote in the canton of Appenzell Innerrhoden at the right hourly cost, apply discount, pro-rata account and VAT in sequence, then collect the deposit by SIX QR-bill.

In the canton of Appenzell Innerrhoden, the Studio applies a regional coefficient of −2% to the reference daywork rate, and employer contributions of 33.2% for structural work and 24.2% for the finishing trades, of which 1.8% is family allowances. Before VAT of 8.1%, your quote still has to absorb the pro-rata account, the discount and the 135 productive hours (out of 176 paid): the Studio applies these deductions in sequence and generates the QR-bill for the deposit. Collective agreement for the finishing trades to be checked: the CCT-SOR covers only French-speaking Switzerland.

Studio Devis SuisseSIA & QR-bill editor · Construction companies
CHF 0 · No account
  • A4 PDF ready to sign
  • SIX QR-bill built in
  • 100% in the browser

Free manual entry · 14’045 ACIP prices & cantons in Soumissions Pro →

Collective agreements (CLA, CN) and social charges in the canton of Appenzell Innerrhoden

On sites in the canton of Appenzell Innerrhoden, the National Collective Agreement for the main construction industry (CN) governs structural work activities, as it does throughout Swiss territory. For the finishing trades and building services, the CCT-SOR does not apply, as it is reserved for French-speaking Switzerland. Companies must therefore refer to the collective labour agreements specific to their professional sector, whether national, regional or cantonal in scope. You should check the provisions in force directly with the competent joint committee. In our tool, the calculation relies on reference profiles for structural work and the finishing trades, weighted by the canton’s parameters, on a purely indicative basis.

In the Studio, the regional coefficient applied to the base daywork rate is −2%, with Vaud as the reference at 0%. Among the 26 cantons of the reference scale, Appenzell Innerrhoden ranks 21st, on a scale running from −7% to +15%. The employer contributions used are 33.2% for structural work and 24.2% for the finishing trades, including cantonal family allowances (1.8%, compared with 3.4% in Vaud). The other contributions (old-age insurance AVS, unemployment insurance, SUVA, occupational pension LPP, early retirement, daily sickness benefit, joint funds) are the same in every canton. In this canton the Studio applies reference profiles: the result is indicative until you have checked the collective agreement of your sector.

Charges and coefficient for the canton of Appenzell Innerrhoden
ItemValue
Regional coefficient on the daywork rate−2%
Family allowances (CAF) of the canton1.8%
Employer contributions, structural work (CN)33.2%
Employer contributions, finishing trades24.2%
Rank among the 26 cantons (coefficient)21 /26
Daywork rates in the canton of Appenzell Innerrhoden, structural work (CHF/h excl. VAT)
ProfileAverage gross monthly payReference base (VD)Appenzell Innerrhoden
Foreman / site supervisor (class V)7'250 CHF122.00119.55
Experienced qualified bricklayer (class Q)6'350 CHF108.00105.85
Qualified bricklayer / recent graduate (class A)6'000 CHF102.0099.95
Skilled worker / federal certificate holder (class B)5'650 CHF96.0094.10
Labourer / site assistant (class C)5'100 CHF88.0086.25
Daywork rates in the canton of Appenzell Innerrhoden, finishing trades (CHF/h excl. VAT)
ProfileAverage gross monthly payReference base (VD)Appenzell Innerrhoden
Finishing trades foreman (CCT-SOR)6'750 CHF106.00103.90
Experienced qualified tradesperson (class A)6'050 CHF96.0094.10
Recently qualified tradesperson (1st to 3rd year after diploma)5'500 CHF88.0086.25
Skilled worker / federal certificate holder (class B)5'300 CHF85.0083.30
Finishing trades assistant (class C)4'850 CHF79.0077.40

How to read this table. The “Reference base (VD)” column is the Studio’s reference rate. The “Appenzell Innerrhoden” column multiplies it by 0.98 and rounds to 5 centimes, exactly as the Studio does when you choose this canton. Gross monthly pay is the average wage for the profile.

Site realities in the canton of Appenzell Innerrhoden

Carrying out work in Appenzell Innerrhoden is strongly marked by the Alpine relief and variations in altitude. The severity of winter, prolonged snow cover and periods of frost shorten the season suitable for outdoor work and earthworks. Road access to certain plots that are isolated or located on a slope generally calls for suitable logistics for the delivery of heavy materials, lorry runs and the footprint of plant. The management of run-off water and the stabilisation of excavations on uneven ground call for methodical planning. It is useful to include measures to protect staff against sudden bad weather in the mountains in the preparation of the site, in accordance with the safety rules in force.

Indicative calculation for the “Experienced qualified tradesperson (class A)” profile (finishing trades): CHF 6'050 gross, plus 24.2% of charges and CHF 595 of monthly expenses, divided by 135 productive hours, give a cost price of CHF 60.07 per hour, before overheads and margin. The daywork rate of CHF 94.10/h therefore leaves CHF 34.03 per hour for overheads and profit.

Main towns and municipalities: construction quotes in Appenzell, Oberegg, Gonten and in the canton of Appenzell Innerrhoden

To draw up your quotes for construction or renovation, the exact geographical location of the structure directly influences your costs. Whether your assignments take place in Appenzell, in Oberegg, in Gonten or in Schwende-Rüte, access constraints, the slope of the ground and altitude change travelling times and overall logistics. A work area on the valley floor does not present the same constraints as a site located on the heights of the massif. Our Studio Devis Suisse tool calibrates your calculations to the parameters of the canton of Appenzell Innerrhoden, then lets you adapt your transport and set-up items to the reality of the municipality.

Cost difference by town, canton of Appenzell Innerrhoden (CHF/h excl. VAT)
TownDifference from the baseExperienced qualified tradesperson (finishing trades)Experienced qualified bricklayer (structural work)
Appenzell−2%94.10105.85

How to read this table. The difference for a town is given relative to the reference base (Vaud = 0%), like the canton’s coefficient. When your site is in one of these towns, this line applies, not the cantonal average. The other municipalities follow the canton’s coefficient.

ERP Art Construction and Soumissions Pro also apply the difference for the town of the site to the full price list.

Cascade of deductions for a quote in the canton of Appenzell Innerrhoden

Between the subtotal of the items and the amount to collect, the Studio follows the same steps for every quote. The order matters: each deduction is calculated on the amount left by the previous one. Example with CHF 10'000 of fixed-price items and the Studio’s default settings (discount 0%, pro-rata account 1.5%, deposit 30%):

From the gross subtotal to the deposit (CHF)
StepAmount
Gross subtotal excl. VAT10'000.00
Discount (0%)0.00
Pro-rata account (1.5% after discount)− 150.00
Net total excl. VAT9'850.00
VAT 8.1%+ 797.85
Total incl. VAT (rounded to 5 centimes)10'647.85
Deposit on order (30% of the total incl. VAT)3'194.35

How to read this table. You start from the total of the fixed-price items, take away the discount granted, then the pro-rata account (the contribution to the shared costs of the site), calculated on what remains. VAT of 8.1% applies to the net amount, and the total including VAT is rounded to 5 centimes. Discount, pro-rata account, VAT and deposit percentage are set in the Studio; the deposit is printed with its QR-bill at the bottom of the last page.

The deposit is a percentage of the total including VAT, not of the net amount: the client pays the VAT with the first payment, which finances the first weeks of materials and labour without any advance on your part. The Studio rounds the deposit to 5 centimes, like the amount on the QR-bill, so that it matches the expected payment exactly.

SIA standards and QR-bill deposit in the canton of Appenzell Innerrhoden

A quote that mentions SIA 118, a clear pricing method and a deposit payable by SIX QR-bill avoids the three most common disputes: over the conditions, over the price and over payment. The Studio prints each of these elements as sentences to tick, in the language of the quote (French, German, Italian, Romansh or English).

SIA 118 as contractual basis

Tick box (unticked by default).

SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.

Asbestos and pollutants

Ticked by default.

Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).

Rise in material prices

Ticked by default.

Reservation for increases in material prices according to the KBOB indices in force.

Pricing method

Your choice, when printing.

Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).

The QR-bill replaces the old payment slips: it carries your IBAN, the amount of the deposit and the reference of the quote, and the client pays it from their banking app without retyping anything. The Studio draws it from the same figures as the total, so the amount paid cannot differ from the quote. To go further than a one-off quote:

Frequently asked questions about quotes in the canton of Appenzell Innerrhoden

How do I take altitude into account in a quote in Appenzell Innerrhoden?

Altitude changes work rates, equipment wear and the transport time of materials. When drafting your quote, include specific items for access logistics, any snow clearance of the surroundings and the protection of fresh work against frost. In the special conditions of the contract, provide for the arrangements for temporary interruption in the event of unfavourable weather, in line with the usual recommendations of SIA standard 118.

Which collective agreement should be used for the finishing trades in this canton?

As the CCT-SOR does not apply in German-speaking Switzerland, finishing-trade work depends on national or intercantonal sector agreements specific to each trade, such as timber, plastering or building services. Contact the joint committee of your trade association in order to confirm the customary working conditions before settling on your hourly rates in your costings.

How should the invoicing of daywork be organised on an Alpine site?

Daywork must be agreed in advance with site management or the client, defining the hourly rates for each qualification and the prices of machines. The daily sheets must clearly state the actual hours, travelling times on difficult terrain and the materials used. After approval, invoicing is carried out by means of a QR-bill in accordance with good practice.

What precautions should be taken for site access to outlying areas?

Narrow or steeply sloping access tracks can often lead to the use of smaller vehicles and intermediate transhipments. Check the permissible loads on municipal bridges and stretches of road, provide for passing places or temporary storage areas, and detail these transport constraints in a separate item of the quote in order to avoid any dispute at the final account.

Price another trade in the canton of Appenzell Innerrhoden

Each trade has its own units and its own collective agreement: choose the trade to see the reservations and rates that go with it.

The 26 cantons

The regional coefficient ranges from −7% to +15% depending on the canton: compare before reusing a rate from a neighbouring site.

Sources and limits. Reference values of Studio Devis Suisse (as at 23.11.2026), CN and CCT-SOR collective agreements, weighted average contribution rates. Indicative only: check the rates of your compensation fund and the collective agreement that applies to your company.