3D rendering of a contemporary detached house and its garden – construction quote template for the canton of Jura (JU)

Canton of Jura · Daywork −6% · CN and CCT-SOR

Construction quote in the canton of Jura: collective agreements, social charges and QR-bill deposit

Price a quote in the canton of Jura at the right hourly cost, apply discount, pro-rata account and VAT in sequence, then collect the deposit by SIX QR-bill.

In the canton of Jura, the Studio applies a regional coefficient of −6% to the reference daywork rate, and employer contributions of 34.5% for structural work and 25.5% for the finishing trades, of which 3.1% is family allowances. Before VAT of 8.1%, your quote still has to absorb the pro-rata account, the discount and the 135 productive hours (out of 176 paid): the Studio applies these deductions in sequence and generates the QR-bill for the deposit.

Studio Devis SuisseSIA & QR-bill editor · Construction companies
CHF 0 · No account
  • A4 PDF ready to sign
  • SIX QR-bill built in
  • 100% in the browser

Free manual entry · 14’045 ACIP prices & cantons in Soumissions Pro →

Collective agreements (CLA, CN) and social charges in the canton of Jura

On sites in the canton of Jura, the collective framework depends directly on the nature of your work. The National Collective Agreement for the main construction industry in Switzerland governs companies active in structural work. For finishing trades such as plastering, painting, joinery, tiling or floor coverings, it is the collective labour agreement for the finishing trades of French-speaking Switzerland that applies in the canton. The building-services sectors, in particular sanitary installations, heating, ventilation and electrical work, are governed by their own professional agreements. Given the variety of these texts and the specific features of each trade, you should check the precise provisions with the competent joint committee before settling your calculations.

In the Studio, the regional coefficient applied to the base daywork rate is −6%, with Vaud as the reference at 0%. Among the 26 cantons of the reference scale, Jura ranks 25th, on a scale running from −7% to +15%. The employer contributions used are 34.5% for structural work and 25.5% for the finishing trades, including cantonal family allowances (3.1%, compared with 3.4% in Vaud). The other contributions (old-age insurance AVS, unemployment insurance, SUVA, occupational pension LPP, early retirement, daily sickness benefit, joint funds) are the same in every canton.

Charges and coefficient for the canton of Jura
ItemValue
Regional coefficient on the daywork rate−6%
Family allowances (CAF) of the canton3.1%
Employer contributions, structural work (CN)34.5%
Employer contributions, finishing trades25.5%
Rank among the 26 cantons (coefficient)25 /26
Daywork rates in the canton of Jura, structural work (CHF/h excl. VAT)
ProfileAverage gross monthly payReference base (VD)Jura
Foreman / site supervisor (class V)7'250 CHF122.00114.70
Experienced qualified bricklayer (class Q)6'350 CHF108.00101.50
Qualified bricklayer / recent graduate (class A)6'000 CHF102.0095.90
Skilled worker / federal certificate holder (class B)5'650 CHF96.0090.25
Labourer / site assistant (class C)5'100 CHF88.0082.70
Daywork rates in the canton of Jura, finishing trades (CHF/h excl. VAT)
ProfileAverage gross monthly payReference base (VD)Jura
Finishing trades foreman (CCT-SOR)6'750 CHF106.0099.65
Experienced qualified tradesperson (class A)6'050 CHF96.0090.25
Recently qualified tradesperson (1st to 3rd year after diploma)5'500 CHF88.0082.70
Skilled worker / federal certificate holder (class B)5'300 CHF85.0079.90
Finishing trades assistant (class C)4'850 CHF79.0074.25

How to read this table. The “Reference base (VD)” column is the Studio’s reference rate. The “Jura” column multiplies it by 0.94 and rounds to 5 centimes, exactly as the Studio does when you choose this canton. Gross monthly pay is the average wage for the profile.

Site realities in the canton of Jura

Organising a site in the Jura often means allowing for very specific logistical and administrative constraints. As this is a border canton, managing your teams calls for sustained attention to the rules on cross-border or posted labour. Joint and official inspections prove frequent on local sites, to check that status and working conditions are compliant. In addition, depending on the altitude of the structure and its exposure to harsh winters, the planning of exterior construction stages must anticipate possible periods of bad weather. Access to the plots, the distances over which materials must be brought from the main routes and the options for setting down skips or for storage directly affect the day-to-day running of operations.

Indicative calculation for the “Experienced qualified tradesperson (class A)” profile (finishing trades): CHF 6'050 gross, plus 25.5% of charges and CHF 595 of monthly expenses, divided by 135 productive hours, give a cost price of CHF 60.65 per hour, before overheads and margin. The daywork rate of CHF 90.25/h therefore leaves CHF 29.60 per hour for overheads and profit.

Main towns and municipalities: construction quotes in Delémont, Porrentruy, Saignelégier and in the canton of Jura

When drawing up a construction quote in Delémont or elsewhere in the canton, the precise location of your work remains a decisive parameter. Whether your work takes place in the town centre, in Porrentruy, Saignelégier, Courroux or Haute-Sorne, each site has its own constraints. The higher altitude on the Jura plateaux, parking difficulties near the historic centres or the layout of the access roads weigh on output and logistics. Studio Devis Suisse adjusts its calculation bases to the canton of Jura, leaving you to build in the local features of each municipality so as to make your bid excluding VAT secure.

Cost difference by town, canton of Jura (CHF/h excl. VAT)
TownDifference from the baseExperienced qualified tradesperson (finishing trades)Experienced qualified bricklayer (structural work)
Delémont−5%91.20102.60
Porrentruy−6%90.25101.50

How to read this table. The difference for a town is given relative to the reference base (Vaud = 0%), like the canton’s coefficient. When your site is in one of these towns, this line applies, not the cantonal average. The other municipalities follow the canton’s coefficient.

ERP Art Construction and Soumissions Pro also apply the difference for the town of the site to the full price list.

Cascade of deductions for a quote in the canton of Jura

Between the subtotal of the items and the amount to collect, the Studio follows the same steps for every quote. The order matters: each deduction is calculated on the amount left by the previous one. Example with CHF 10'000 of fixed-price items and the Studio’s default settings (discount 0%, pro-rata account 1.5%, deposit 30%):

From the gross subtotal to the deposit (CHF)
StepAmount
Gross subtotal excl. VAT10'000.00
Discount (0%)0.00
Pro-rata account (1.5% after discount)− 150.00
Net total excl. VAT9'850.00
VAT 8.1%+ 797.85
Total incl. VAT (rounded to 5 centimes)10'647.85
Deposit on order (30% of the total incl. VAT)3'194.35

How to read this table. You start from the total of the fixed-price items, take away the discount granted, then the pro-rata account (the contribution to the shared costs of the site), calculated on what remains. VAT of 8.1% applies to the net amount, and the total including VAT is rounded to 5 centimes. Discount, pro-rata account, VAT and deposit percentage are set in the Studio; the deposit is printed with its QR-bill at the bottom of the last page.

The deposit is a percentage of the total including VAT, not of the net amount: the client pays the VAT with the first payment, which finances the first weeks of materials and labour without any advance on your part. The Studio rounds the deposit to 5 centimes, like the amount on the QR-bill, so that it matches the expected payment exactly.

SIA standards and QR-bill deposit in the canton of Jura

A quote that mentions SIA 118, a clear pricing method and a deposit payable by SIX QR-bill avoids the three most common disputes: over the conditions, over the price and over payment. The Studio prints each of these elements as sentences to tick, in the language of the quote (French, German, Italian, Romansh or English).

SIA 118 as contractual basis

Tick box (unticked by default).

SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.

Asbestos and pollutants

Ticked by default.

Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).

Rise in material prices

Ticked by default.

Reservation for increases in material prices according to the KBOB indices in force.

Pricing method

Your choice, when printing.

Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).

The QR-bill replaces the old payment slips: it carries your IBAN, the amount of the deposit and the reference of the quote, and the client pays it from their banking app without retyping anything. The Studio draws it from the same figures as the total, so the amount paid cannot differ from the quote. To go further than a one-off quote:

Frequently asked questions about quotes in the canton of Jura

How can I adapt my quote in the Jura to the unpredictable climate of the Franches-Montagnes?

The differences in altitude between the Delémont valley and the Jura plateaux change the length of the periods suitable for structural work or exterior renders. Allow for realistic rates of progress in your bid and include the possible cost of temporary protection measures against frost or snow. An explicit clause under SIA standard 118 clarifies how weather-related interruptions are handled with site management.

Which VAT applies to a foreign client who owns property in the canton?

Swiss VAT applies according to the place where the property-related service is carried out. If the structure is built in the canton of Jura, the standard rate of 8.1% applies to all the work invoiced, whatever the nationality, tax residence or billing address of the client. The document sent must state separately the subtotal excluding VAT and the amount including VAT.

Why record safety requirements as early as the price bid?

Sites in the Jura are visited regularly by SUVA and by the joint inspection committees. The collective protection equipment, scaffolding or guard rails referred to in the Construction Work Ordinance (OTConst) are best detailed in specific items of your tender. If these elements do not appear in your unit prices, safety requirements raised during the work can cut into your profit margin.

How should retention be handled under SIA standard 118?

Retention allows the client to protect themselves against possible defects during the two-year defects notification period. As a general rule, it ranges from 0 to 10% of the interim payments, depending on the contractual arrangements. To avoid weakening your cash flow, you can propose replacing this retention with a joint and several guarantee issued by a bank or a recognised insurer.

Price another trade in the canton of Jura

Each trade has its own units and its own collective agreement: choose the trade to see the reservations and rates that go with it.

The 26 cantons

The regional coefficient ranges from −7% to +15% depending on the canton: compare before reusing a rate from a neighbouring site.

Sources and limits. Reference values of Studio Devis Suisse (as at 23.11.2026), CN and CCT-SOR collective agreements, weighted average contribution rates. Indicative only: check the rates of your compensation fund and the collective agreement that applies to your company.