Collective agreements (CLA, CN) and social charges in the canton of Nidwalden
On sites in the canton of Nidwalden, the National Collective Agreement for the main construction industry in Switzerland (CN) governs structural work. By contrast, the CCT-SOR does not in principle concern this canton, as its territorial scope covers French-speaking Switzerland. For the finishing trades, building services and the decorating trades, working and wage conditions depend on sector collective labour agreements, often negotiated at cantonal or regional level in Central Switzerland. You should therefore check the provisions in force with the competent joint committee before drawing up your bids. The reference profiles built into the calculations make it possible to adjust the wage bases to the cantonal context, providing an indicative benchmark that must be compared with the contractual realities of your company.
In the Studio, the regional coefficient applied to the base daywork rate is +3%, with Vaud as the reference at 0%. Among the 26 cantons of the reference scale, Nidwalden ranks 8th, on a scale running from −7% to +15%. The employer contributions used are 33% for structural work and 24% for the finishing trades, including cantonal family allowances (1.65%, compared with 3.4% in Vaud). The other contributions (old-age insurance AVS, unemployment insurance, SUVA, occupational pension LPP, early retirement, daily sickness benefit, joint funds) are the same in every canton. In this canton the Studio applies reference profiles: the result is indicative until you have checked the collective agreement of your sector.
| Item | Value |
|---|---|
| Regional coefficient on the daywork rate | +3% |
| Family allowances (CAF) of the canton | 1.65% |
| Employer contributions, structural work (CN) | 33% |
| Employer contributions, finishing trades | 24% |
| Rank among the 26 cantons (coefficient) | 8 /26 |
| Profile | Average gross monthly pay | Reference base (VD) | Nidwalden |
|---|---|---|---|
| Foreman / site supervisor (class V) | 7'250 CHF | 122.00 | 125.65 |
| Experienced qualified bricklayer (class Q) | 6'350 CHF | 108.00 | 111.25 |
| Qualified bricklayer / recent graduate (class A) | 6'000 CHF | 102.00 | 105.05 |
| Skilled worker / federal certificate holder (class B) | 5'650 CHF | 96.00 | 98.90 |
| Labourer / site assistant (class C) | 5'100 CHF | 88.00 | 90.65 |
| Profile | Average gross monthly pay | Reference base (VD) | Nidwalden |
|---|---|---|---|
| Finishing trades foreman (CCT-SOR) | 6'750 CHF | 106.00 | 109.20 |
| Experienced qualified tradesperson (class A) | 6'050 CHF | 96.00 | 98.90 |
| Recently qualified tradesperson (1st to 3rd year after diploma) | 5'500 CHF | 88.00 | 90.65 |
| Skilled worker / federal certificate holder (class B) | 5'300 CHF | 85.00 | 87.55 |
| Finishing trades assistant (class C) | 4'850 CHF | 79.00 | 81.35 |
How to read this table. The “Reference base (VD)” column is the Studio’s reference rate. The “Nidwalden” column multiplies it by 1.03 and rounds to 5 centimes, exactly as the Studio does when you choose this canton. Gross monthly pay is the average wage for the profile.
Site realities in the canton of Nidwalden
Carrying out work in the canton of Nidwalden is best done by taking the geographical constraints carefully into account. The Alpine relief brings marked variations in altitude, involving access routes that are sometimes narrow in the mountains, working windows reduced by snow and a shortened site season on the heights. At the same time, the immediate proximity of Lake Lucerne creates increased exposure to humid air, lingering fog and gusts of wind, particularly during episodes of foehn. These climatic and topographical factors directly influence installation rates, the drying times of screeds or plasters, and the sizing of site installations and scaffolding, which must be analysed rigorously when you prepare your quote.
Indicative calculation for the “Experienced qualified tradesperson (class A)” profile (finishing trades): CHF 6'050 gross, plus 24% of charges and CHF 595 of monthly expenses, divided by 135 productive hours, give a cost price of CHF 59.98 per hour, before overheads and margin. The daywork rate of CHF 98.90/h therefore leaves CHF 38.92 per hour for overheads and profit.
Main towns and municipalities: construction quotes in Stans, Hergiswil, Buochs and in the canton of Nidwalden
To price a construction quote in Stans or anywhere in the canton, the precise location of your work is a decisive parameter. Whether your work takes place in Stans, Hergiswil, Buochs, Stansstad or Ennetbürgen, the practical conditions of execution differ appreciably between the lake shore, the valley floor and the Alpine slopes. Altitude, the layout of the access roads, the slope of the ground and the facilities for storing materials directly change transport costs and overall logistics. Studio Devis Suisse sets its indicative parameters at cantonal level, leaving it to you to adapt the amount of your services to the local topographical particularities.
- Stans
- Hergiswil
- Buochs
- Stansstad
- Ennetbürgen
| Town | Difference from the base | Experienced qualified tradesperson (finishing trades) | Experienced qualified bricklayer (structural work) |
|---|---|---|---|
| Stans | +3% | 98.90 | 111.25 |
How to read this table. The difference for a town is given relative to the reference base (Vaud = 0%), like the canton’s coefficient. When your site is in one of these towns, this line applies, not the cantonal average. The other municipalities follow the canton’s coefficient.
ERP Art Construction and Soumissions Pro also apply the difference for the town of the site to the full price list.
Cascade of deductions for a quote in the canton of Nidwalden
Between the subtotal of the items and the amount to collect, the Studio follows the same steps for every quote. The order matters: each deduction is calculated on the amount left by the previous one. Example with CHF 10'000 of fixed-price items and the Studio’s default settings (discount 0%, pro-rata account 1.5%, deposit 30%):
| Step | Amount |
|---|---|
| Gross subtotal excl. VAT | 10'000.00 |
| Discount (0%) | 0.00 |
| Pro-rata account (1.5% after discount) | − 150.00 |
| Net total excl. VAT | 9'850.00 |
| VAT 8.1% | + 797.85 |
| Total incl. VAT (rounded to 5 centimes) | 10'647.85 |
| Deposit on order (30% of the total incl. VAT) | 3'194.35 |
How to read this table. You start from the total of the fixed-price items, take away the discount granted, then the pro-rata account (the contribution to the shared costs of the site), calculated on what remains. VAT of 8.1% applies to the net amount, and the total including VAT is rounded to 5 centimes. Discount, pro-rata account, VAT and deposit percentage are set in the Studio; the deposit is printed with its QR-bill at the bottom of the last page.
The deposit is a percentage of the total including VAT, not of the net amount: the client pays the VAT with the first payment, which finances the first weeks of materials and labour without any advance on your part. The Studio rounds the deposit to 5 centimes, like the amount on the QR-bill, so that it matches the expected payment exactly.
SIA standards and QR-bill deposit in the canton of Nidwalden
A quote that mentions SIA 118, a clear pricing method and a deposit payable by SIX QR-bill avoids the three most common disputes: over the conditions, over the price and over payment. The Studio prints each of these elements as sentences to tick, in the language of the quote (French, German, Italian, Romansh or English).
SIA 118 as contractual basis
Tick box (unticked by default).
SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.
Asbestos and pollutants
Ticked by default.
Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).
Rise in material prices
Ticked by default.
Reservation for increases in material prices according to the KBOB indices in force.
Pricing method
Your choice, when printing.
Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).
The QR-bill replaces the old payment slips: it carries your IBAN, the amount of the deposit and the reference of the quote, and the client pays it from their banking app without retyping anything. The Studio draws it from the same figures as the total, so the amount paid cannot differ from the quote. To go further than a one-off quote:
Frequently asked questions about quotes in the canton of Nidwalden
How do I adapt the calculation of my travel costs in the canton of Nidwalden?
Journeys to high-altitude sites or along the shores call for particular logistical planning. You should assess the teams’ actual travelling time, any weight restrictions on municipal mountain roads and the specific delivery costs. By including these parameters as clear items in your quotes, or in line with the recommendations of the CAN standard item catalogue (NPK), you protect your margin without any dispute from site management.
What precautions should be taken for closing down the site before the winter period?
On sites subject to the Alpine climate, early snowfall can interrupt outdoor work. It is prudent to define in the contract, with reference to SIA standard 118, the conditions for temporary interruption, the securing of the works and any extension of the deadlines. Make explicit provision for who bears the cost of winter protection measures in order to avoid any dispute with the client.
How should retention be handled under SIA standard 118 on these sites?
The retention, frequently set at up to ten per cent under the terms of the agreement made with the client, serves to guarantee the proper execution of the work during the two-year period for notifying defects. You can propose replacing this retention with an equivalent bank or insurance guarantee, thereby preserving your company’s cash flow from the acceptance of the works.
Does the German language affect the drafting of my contractual documents?
As German is the official language of the canton, all contractual documents, tender specifications and correspondence with site management are drawn up in German. If you are pricing from another region, take care to use the exact technical terminology in line with the standard item catalogues, to avoid any misunderstanding about the nature or extent of the services agreed.
Price another trade in the canton of Nidwalden
Each trade has its own units and its own collective agreement: choose the trade to see the reservations and rates that go with it.
- CFC 112 Demolition & deconstruction
- CFC 201 Earthworks & excavation
- CFC 211 Masonry & structural work
- CFC 213 Structural steelwork
- CFC 214 Carpentry & timber structures
- CFC 221 Joinery & windows
- CFC 222 Sheet-metal work
- CFC 224 Roofing & waterproofing
- CFC 226 Rendering & façade insulation
- CFC 228 Shutters & blinds
- CFC 232 Electrical installations
- CFC 242 Heating & heat generation
- CFC 251 Sanitary installations
- CFC 271 Plastering & drywall
- CFC 272 Metal construction & locksmith work
- CFC 273 Interior joinery
- CFC 281 Floor coverings (tiling, parquet)
- CFC 282 Wall coverings & wall tiling
- CFC 285 Painting & wallpapering
- CFC 287 Final site cleaning
The 26 cantons
The regional coefficient ranges from −7% to +15% depending on the canton: compare before reusing a rate from a neighbouring site.
- Vaud (VD)
- Geneva (GE)
- Valais (VS)
- Fribourg (FR)
- Neuchâtel (NE)
- Jura (JU)
- Bern (BE)
- Zurich (ZH)
- Zug (ZG)
- Basel-Stadt (BS)
- Basel-Landschaft (BL)
- Aargau (AG)
- Solothurn (SO)
- Lucerne (LU)
- Schwyz (SZ)
- Nidwalden (NW)
- Obwalden (OW)
- Uri (UR)
- St. Gallen (SG)
- Thurgau (TG)
- Schaffhausen (SH)
- Appenzell Ausserrhoden (AR)
- Appenzell Innerrhoden (AI)
- Glarus (GL)
- Graubünden (GR)
- Ticino (TI)