Collective agreements (CLA, CN) and social charges in the canton of Graubünden
In the canton of Graubünden, structural work falls under the National Collective Agreement for the main construction industry in Switzerland (CN). By contrast, the CCT-SOR concerns only French-speaking Switzerland and therefore does not apply here. For the finishing trades and building services, working conditions depend on sector agreements, sometimes negotiated at cantonal or regional level. Companies active on a site in Graubünden are advised to enquire directly with the competent joint committee to find out the wage and professional rules in force. The tool applies indicative reference hourly profiles, distinguishing structural work under the CN from the finishing trades, and incorporating the regional coefficient and the family-allowance parameters specific to the canton.
In the Studio, the regional coefficient applied to the base daywork rate is 0%, with Vaud as the reference at 0%. Among the 26 cantons of the reference scale, Graubünden ranks 15th, on a scale running from −7% to +15%. The employer contributions used are 33.3% for structural work and 24.3% for the finishing trades, including cantonal family allowances (1.95%, compared with 3.4% in Vaud). The other contributions (old-age insurance AVS, unemployment insurance, SUVA, occupational pension LPP, early retirement, daily sickness benefit, joint funds) are the same in every canton. In this canton the Studio applies reference profiles: the result is indicative until you have checked the collective agreement of your sector.
| Item | Value |
|---|---|
| Regional coefficient on the daywork rate | 0% |
| Family allowances (CAF) of the canton | 1.95% |
| Employer contributions, structural work (CN) | 33.3% |
| Employer contributions, finishing trades | 24.3% |
| Rank among the 26 cantons (coefficient) | 15 /26 |
| Profile | Average gross monthly pay | Reference base (VD) | Graubünden |
|---|---|---|---|
| Foreman / site supervisor (class V) | 7'250 CHF | 122.00 | 122.00 |
| Experienced qualified bricklayer (class Q) | 6'350 CHF | 108.00 | 108.00 |
| Qualified bricklayer / recent graduate (class A) | 6'000 CHF | 102.00 | 102.00 |
| Skilled worker / federal certificate holder (class B) | 5'650 CHF | 96.00 | 96.00 |
| Labourer / site assistant (class C) | 5'100 CHF | 88.00 | 88.00 |
| Profile | Average gross monthly pay | Reference base (VD) | Graubünden |
|---|---|---|---|
| Finishing trades foreman (CCT-SOR) | 6'750 CHF | 106.00 | 106.00 |
| Experienced qualified tradesperson (class A) | 6'050 CHF | 96.00 | 96.00 |
| Recently qualified tradesperson (1st to 3rd year after diploma) | 5'500 CHF | 88.00 | 88.00 |
| Skilled worker / federal certificate holder (class B) | 5'300 CHF | 85.00 | 85.00 |
| Finishing trades assistant (class C) | 4'850 CHF | 79.00 | 79.00 |
How to read this table. The “Reference base (VD)” column is the Studio’s reference rate. The “Graubünden” column multiplies it by 1 and rounds to 5 centimes, exactly as the Studio does when you choose this canton. Gross monthly pay is the average wage for the profile.
Site realities in the canton of Graubünden
Running a site in Graubünden means taking pronounced Alpine constraints into account. High altitude, prolonged snow cover and access via passes or mountain roads often shorten the season suitable for outdoor work. Transport runs for materials and the removal of excavated material call for rigorous planning according to the weather conditions. In addition, the proximity of the borders with Italy and Austria leads to a frequent presence of cross-border or posted workers. This situation gives rise to regular joint-committee inspections on sites to check compliance with the customary practices and wages of the sector. The contractor often does well to adapt work rates, bad-weather protection measures and the accommodation of the teams to the real constraints of the terrain.
Indicative calculation for the “Experienced qualified tradesperson (class A)” profile (finishing trades): CHF 6'050 gross, plus 24.3% of charges and CHF 595 of monthly expenses, divided by 135 productive hours, give a cost price of CHF 60.11 per hour, before overheads and margin. The daywork rate of CHF 96.00/h therefore leaves CHF 35.89 per hour for overheads and profit.
Main towns and municipalities: construction quotes in Chur, Davos, St. Moritz and in the canton of Graubünden
To draw up a construction quote in Chur or in other places such as Davos, St. Moritz, Landquart, Arosa and Ilanz/Glion, the exact geographical location directly influences the costing. The constraints of altitude, the complexity of the access routes or the distance from concrete plants change transport costs, logistics and staff travelling times. Work on the valley floor does not generally present the same operational constraints as a structure located in a high-altitude resort. The tool sets its bases of calculation at the level of the canton of Graubünden, but it is up to the project manager to adjust the items for transport, site installations and access according to the municipality chosen.
- Chur
- Davos
- St. Moritz
- Landquart
- Arosa
- Ilanz/Glion
| Town | Difference from the base | Experienced qualified tradesperson (finishing trades) | Experienced qualified bricklayer (structural work) |
|---|---|---|---|
| Chur | 0% | 96.00 | 108.00 |
| St. Moritz | +25% | 120.00 | 135.00 |
| Davos/Arosa | +16% | 111.35 | 125.30 |
How to read this table. The difference for a town is given relative to the reference base (Vaud = 0%), like the canton’s coefficient. When your site is in one of these towns, this line applies, not the cantonal average. The other municipalities follow the canton’s coefficient.
ERP Art Construction and Soumissions Pro also apply the difference for the town of the site to the full price list.
Cascade of deductions for a quote in the canton of Graubünden
Between the subtotal of the items and the amount to collect, the Studio follows the same steps for every quote. The order matters: each deduction is calculated on the amount left by the previous one. Example with CHF 10'000 of fixed-price items and the Studio’s default settings (discount 0%, pro-rata account 1.5%, deposit 30%):
| Step | Amount |
|---|---|
| Gross subtotal excl. VAT | 10'000.00 |
| Discount (0%) | 0.00 |
| Pro-rata account (1.5% after discount) | − 150.00 |
| Net total excl. VAT | 9'850.00 |
| VAT 8.1% | + 797.85 |
| Total incl. VAT (rounded to 5 centimes) | 10'647.85 |
| Deposit on order (30% of the total incl. VAT) | 3'194.35 |
How to read this table. You start from the total of the fixed-price items, take away the discount granted, then the pro-rata account (the contribution to the shared costs of the site), calculated on what remains. VAT of 8.1% applies to the net amount, and the total including VAT is rounded to 5 centimes. Discount, pro-rata account, VAT and deposit percentage are set in the Studio; the deposit is printed with its QR-bill at the bottom of the last page.
The deposit is a percentage of the total including VAT, not of the net amount: the client pays the VAT with the first payment, which finances the first weeks of materials and labour without any advance on your part. The Studio rounds the deposit to 5 centimes, like the amount on the QR-bill, so that it matches the expected payment exactly.
SIA standards and QR-bill deposit in the canton of Graubünden
A quote that mentions SIA 118, a clear pricing method and a deposit payable by SIX QR-bill avoids the three most common disputes: over the conditions, over the price and over payment. The Studio prints each of these elements as sentences to tick, in the language of the quote (French, German, Italian, Romansh or English).
SIA 118 as contractual basis
Tick box (unticked by default).
SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.
Asbestos and pollutants
Ticked by default.
Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).
Rise in material prices
Ticked by default.
Reservation for increases in material prices according to the KBOB indices in force.
Pricing method
Your choice, when printing.
Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).
The QR-bill replaces the old payment slips: it carries your IBAN, the amount of the deposit and the reference of the quote, and the client pays it from their banking app without retyping anything. The Studio draws it from the same figures as the total, so the amount paid cannot differ from the quote. To go further than a one-off quote:
Frequently asked questions about quotes in the canton of Graubünden
How do I adjust my quote to the specifics of the canton of Graubünden?
You must consider the road access costs, the altitude of the site and the working period planned by site management. For wages, the tool offers reference profiles based on the CN for structural work or on averages for the finishing trades, adapted to the canton’s charges. It remains prudent to check the applicable provisions with the joint committees of your sector, then to adapt your items for transport and site installations.
Which collective agreement should be used for the finishing trades in Graubünden?
As the CCT-SOR does not apply in Graubünden, it is the professional sector agreements, often cantonal or regional, that set the legitimate framework. As each trade has its own agreements, you should consult the joint committee concerned before settling on your hourly costs. The tool provides an indicative basis for the finishing trades, which you can adjust in your price analyses according to your actual contracts and your wage data.
What logistical elements should be planned for a site in a high-altitude resort?
Transporting materials along winding roads or restricted routes generates extra costs compared with a site in the lowlands. You need to price unloading times, any intermediate storage, the adaptation of vehicles and the regular cleaning of access areas. The management of skips and the removal of waste also call for runs calculated as tightly as possible so as not to inflate the overall bill.
How should retention be worded under SIA standard 118?
Under the rules of SIA standard 118, a retention may be provided for to cover any defects at the acceptance of the works. The contract for work sets this percentage, generally adjustable between zero and ten per cent on the interim payments. This sum may be withheld from payments or replaced by an equivalent bank guarantee, thereby ensuring the financial security of both parties during the period for notifying defects.
Price another trade in the canton of Graubünden
Each trade has its own units and its own collective agreement: choose the trade to see the reservations and rates that go with it.
- CFC 112 Demolition & deconstruction
- CFC 201 Earthworks & excavation
- CFC 211 Masonry & structural work
- CFC 213 Structural steelwork
- CFC 214 Carpentry & timber structures
- CFC 221 Joinery & windows
- CFC 222 Sheet-metal work
- CFC 224 Roofing & waterproofing
- CFC 226 Rendering & façade insulation
- CFC 228 Shutters & blinds
- CFC 232 Electrical installations
- CFC 242 Heating & heat generation
- CFC 251 Sanitary installations
- CFC 271 Plastering & drywall
- CFC 272 Metal construction & locksmith work
- CFC 273 Interior joinery
- CFC 281 Floor coverings (tiling, parquet)
- CFC 282 Wall coverings & wall tiling
- CFC 285 Painting & wallpapering
- CFC 287 Final site cleaning
The 26 cantons
The regional coefficient ranges from −7% to +15% depending on the canton: compare before reusing a rate from a neighbouring site.
- Vaud (VD)
- Geneva (GE)
- Valais (VS)
- Fribourg (FR)
- Neuchâtel (NE)
- Jura (JU)
- Bern (BE)
- Zurich (ZH)
- Zug (ZG)
- Basel-Stadt (BS)
- Basel-Landschaft (BL)
- Aargau (AG)
- Solothurn (SO)
- Lucerne (LU)
- Schwyz (SZ)
- Nidwalden (NW)
- Obwalden (OW)
- Uri (UR)
- St. Gallen (SG)
- Thurgau (TG)
- Schaffhausen (SH)
- Appenzell Ausserrhoden (AR)
- Appenzell Innerrhoden (AI)
- Glarus (GL)
- Graubünden (GR)
- Ticino (TI)