Collective agreements (CLA, CN) and social charges in the canton of Zurich
In the canton of Zurich, the National Collective Agreement for the main construction industry in Switzerland governs structural work. The CCT-SOR does not apply in this canton, as that agreement is restricted to French-speaking Switzerland. For the finishing trades, plastering and painting, electrical work or sanitary installations, employment relationships depend on sector collective agreements, often negotiated at regional or cantonal level. You must check the conditions in force directly with the competent joint committee for your trade. In Studio Devis Suisse, the calculations are based on reference profiles for structural work and the finishing trades, adjusted by the regional coefficient and the cantonal social charges, on a purely indicative basis.
The canton of Zurich is one of the cantons where construction labour costs the most: the regional coefficient applied to the base daywork rate is +14%, with Vaud as the reference at 0%. Among the 26 cantons of the reference scale, Zurich ranks 2nd, on a scale running from −7% to +15%. The employer contributions used are 33.1% for structural work and 24.1% for the finishing trades, including cantonal family allowances (1.7%, compared with 3.4% in Vaud). The other contributions (old-age insurance AVS, unemployment insurance, SUVA, occupational pension LPP, early retirement, daily sickness benefit, joint funds) are the same in every canton. In this canton the Studio applies reference profiles: the result is indicative until you have checked the collective agreement of your sector.
| Item | Value |
|---|---|
| Regional coefficient on the daywork rate | +14% |
| Family allowances (CAF) of the canton | 1.7% |
| Employer contributions, structural work (CN) | 33.1% |
| Employer contributions, finishing trades | 24.1% |
| Rank among the 26 cantons (coefficient) | 2 /26 |
| Profile | Average gross monthly pay | Reference base (VD) | Zurich |
|---|---|---|---|
| Foreman / site supervisor (class V) | 7'250 CHF | 122.00 | 139.10 |
| Experienced qualified bricklayer (class Q) | 6'350 CHF | 108.00 | 123.10 |
| Qualified bricklayer / recent graduate (class A) | 6'000 CHF | 102.00 | 116.30 |
| Skilled worker / federal certificate holder (class B) | 5'650 CHF | 96.00 | 109.45 |
| Labourer / site assistant (class C) | 5'100 CHF | 88.00 | 100.30 |
| Profile | Average gross monthly pay | Reference base (VD) | Zurich |
|---|---|---|---|
| Finishing trades foreman (CCT-SOR) | 6'750 CHF | 106.00 | 120.85 |
| Experienced qualified tradesperson (class A) | 6'050 CHF | 96.00 | 109.45 |
| Recently qualified tradesperson (1st to 3rd year after diploma) | 5'500 CHF | 88.00 | 100.30 |
| Skilled worker / federal certificate holder (class B) | 5'300 CHF | 85.00 | 96.90 |
| Finishing trades assistant (class C) | 4'850 CHF | 79.00 | 90.05 |
How to read this table. The “Reference base (VD)” column is the Studio’s reference rate. The “Zurich” column multiplies it by 1.1400000000000001 and rounds to 5 centimes, exactly as the Studio does when you choose this canton. Gross monthly pay is the average wage for the profile.
Site realities in the canton of Zurich
Organising a site in the canton of Zurich means building high urban density into the calculation of your direct costs. The constraints of occupying public land directly affect the erection of scaffolding, the setting down of skips and the obtaining of road-use permits from the municipal services. Restricted delivery slots, the lack of parking and access difficulties in built-up areas slow the pace of your teams. In addition, the proximity of the lakes exposes structures to greater residual humidity and to noticeable wind corridors, which can affect the drying times of screeds or façade renders as well as the protection of outdoor workstations.
Indicative calculation for the “Experienced qualified tradesperson (class A)” profile (finishing trades): CHF 6'050 gross, plus 24.1% of charges and CHF 595 of monthly expenses, divided by 135 productive hours, give a cost price of CHF 60.02 per hour, before overheads and margin. The daywork rate of CHF 109.45/h therefore leaves CHF 49.43 per hour for overheads and profit.
Main towns and municipalities: construction quotes in Zurich, Winterthur, Uster and in the canton of Zurich
When drawing up a construction quote in the canton of Zurich, you work both in very dense centres such as Zurich, Winterthur, Uster or Dübendorf and in dynamic municipalities such as Dietikon, Wetzikon, Kloten or Bülach. The exact geographical location of your project weighs directly on the final amount of your priced bid. Altitude, the precise layout of the access roads, the space available for the general site installation and the particular constraints of the municipality concerned make your logistics costs vary greatly. Studio Devis Suisse calibrates your basic parameters at cantonal level, while leaving you free to adjust your travel times and your access costs for each site.
- Zurich
- Winterthur
- Uster
- Dübendorf
- Dietikon
- Wetzikon
- Kloten
- Bülach
| Town | Difference from the base | Experienced qualified tradesperson (finishing trades) | Experienced qualified bricklayer (structural work) |
|---|---|---|---|
| City of Zurich | +18% | 113.30 | 127.45 |
| Winterthur | +10% | 105.60 | 118.80 |
How to read this table. The difference for a town is given relative to the reference base (Vaud = 0%), like the canton’s coefficient. When your site is in one of these towns, this line applies, not the cantonal average. The other municipalities follow the canton’s coefficient.
ERP Art Construction and Soumissions Pro also apply the difference for the town of the site to the full price list.
Cascade of deductions for a quote in the canton of Zurich
Between the subtotal of the items and the amount to collect, the Studio follows the same steps for every quote. The order matters: each deduction is calculated on the amount left by the previous one. Example with CHF 10'000 of fixed-price items and the Studio’s default settings (discount 0%, pro-rata account 1.5%, deposit 30%):
| Step | Amount |
|---|---|
| Gross subtotal excl. VAT | 10'000.00 |
| Discount (0%) | 0.00 |
| Pro-rata account (1.5% after discount) | − 150.00 |
| Net total excl. VAT | 9'850.00 |
| VAT 8.1% | + 797.85 |
| Total incl. VAT (rounded to 5 centimes) | 10'647.85 |
| Deposit on order (30% of the total incl. VAT) | 3'194.35 |
How to read this table. You start from the total of the fixed-price items, take away the discount granted, then the pro-rata account (the contribution to the shared costs of the site), calculated on what remains. VAT of 8.1% applies to the net amount, and the total including VAT is rounded to 5 centimes. Discount, pro-rata account, VAT and deposit percentage are set in the Studio; the deposit is printed with its QR-bill at the bottom of the last page.
The deposit is a percentage of the total including VAT, not of the net amount: the client pays the VAT with the first payment, which finances the first weeks of materials and labour without any advance on your part. The Studio rounds the deposit to 5 centimes, like the amount on the QR-bill, so that it matches the expected payment exactly.
SIA standards and QR-bill deposit in the canton of Zurich
A quote that mentions SIA 118, a clear pricing method and a deposit payable by SIX QR-bill avoids the three most common disputes: over the conditions, over the price and over payment. The Studio prints each of these elements as sentences to tick, in the language of the quote (French, German, Italian, Romansh or English).
SIA 118 as contractual basis
Tick box (unticked by default).
SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.
Asbestos and pollutants
Ticked by default.
Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).
Rise in material prices
Ticked by default.
Reservation for increases in material prices according to the KBOB indices in force.
Pricing method
Your choice, when printing.
Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).
The QR-bill replaces the old payment slips: it carries your IBAN, the amount of the deposit and the reference of the quote, and the client pays it from their banking app without retyping anything. The Studio draws it from the same figures as the total, so the amount paid cannot differ from the quote. To go further than a one-off quote:
Frequently asked questions about quotes in the canton of Zurich
How can the wages in a quote be adapted to the rules that apply in the canton of Zurich?
You must refer to the National Collective Agreement for structural work or to the Zurich sector agreements for the finishing trades. These texts set the basic wages and the allowances to be applied. The tool offers you a reference profile adapted to the canton for estimating your cost prices, but it is up to you to check that your hourly rates are compliant with the joint committee for your trade.
Should specific items be provided for site installation in a town centre?
Yes. In a highly urbanised setting, the municipal roads department may require paid permits for every temporary occupation, whether it is scaffolding, a silo or a crane. It is worth pricing pavement protection, temporary signage and the loss of output linked to the delivery time restrictions laid down by site management or by local regulations.
Does the proximity of the Zurich lakes change installation times?
Damp air and exposure to wind along the shores can slow the setting of concrete, renders or exterior paints. If the weather conditions lead to the use of reinforced sheeting, dehumidifiers or longer waiting times between two coats, these measures should be included in the preparatory services of your quote.
How should SIA standard 118 be applied when drafting the bid?
When your quote mentions SIA standard 118 as the contractual basis, the rules on measurement, interim accounts, retention and defects notification periods apply as soon as the client accepts. State clearly in your text whether your amounts are calculated by measurement according to the CAN standard item catalogue or as a fixed price, and generally indicate whether the total is exclusive of VAT.
Price another trade in the canton of Zurich
Each trade has its own units and its own collective agreement: choose the trade to see the reservations and rates that go with it.
- CFC 112 Demolition & deconstruction
- CFC 201 Earthworks & excavation
- CFC 211 Masonry & structural work
- CFC 213 Structural steelwork
- CFC 214 Carpentry & timber structures
- CFC 221 Joinery & windows
- CFC 222 Sheet-metal work
- CFC 224 Roofing & waterproofing
- CFC 226 Rendering & façade insulation
- CFC 228 Shutters & blinds
- CFC 232 Electrical installations
- CFC 242 Heating & heat generation
- CFC 251 Sanitary installations
- CFC 271 Plastering & drywall
- CFC 272 Metal construction & locksmith work
- CFC 273 Interior joinery
- CFC 281 Floor coverings (tiling, parquet)
- CFC 282 Wall coverings & wall tiling
- CFC 285 Painting & wallpapering
- CFC 287 Final site cleaning
The 26 cantons
The regional coefficient ranges from −7% to +15% depending on the canton: compare before reusing a rate from a neighbouring site.
- Vaud (VD)
- Geneva (GE)
- Valais (VS)
- Fribourg (FR)
- Neuchâtel (NE)
- Jura (JU)
- Bern (BE)
- Zurich (ZH)
- Zug (ZG)
- Basel-Stadt (BS)
- Basel-Landschaft (BL)
- Aargau (AG)
- Solothurn (SO)
- Lucerne (LU)
- Schwyz (SZ)
- Nidwalden (NW)
- Obwalden (OW)
- Uri (UR)
- St. Gallen (SG)
- Thurgau (TG)
- Schaffhausen (SH)
- Appenzell Ausserrhoden (AR)
- Appenzell Innerrhoden (AI)
- Glarus (GL)
- Graubünden (GR)
- Ticino (TI)