3D rendering of a street lined with apartment buildings, from daytime to dusk – construction quote template for the canton of Basel-Landschaft (BL)

Canton of Basel-Landschaft · Daywork +6% · CN and sector agreements

Construction quote in the canton of Basel-Landschaft: collective agreements, social charges and QR-bill deposit

Price a quote in the canton of Basel-Landschaft at the right hourly cost, apply discount, pro-rata account and VAT in sequence, then collect the deposit by SIX QR-bill.

In the canton of Basel-Landschaft, the Studio applies a regional coefficient of +6% to the reference daywork rate, and employer contributions of 33.3% for structural work and 24.3% for the finishing trades, of which 1.9% is family allowances. Before VAT of 8.1%, your quote still has to absorb the pro-rata account, the discount and the 135 productive hours (out of 176 paid): the Studio applies these deductions in sequence and generates the QR-bill for the deposit. Collective agreement for the finishing trades to be checked: the CCT-SOR covers only French-speaking Switzerland.

Studio Devis SuisseSIA & QR-bill editor · Construction companies
CHF 0 · No account
  • A4 PDF ready to sign
  • SIX QR-bill built in
  • 100% in the browser

Free manual entry · 14’045 ACIP prices & cantons in Soumissions Pro →

Collective agreements (CLA, CN) and social charges in the canton of Basel-Landschaft

On sites in the canton of Basel-Landschaft, structural work is governed by the National Collective Agreement for the main construction industry in Switzerland (CN). For the finishing trades and building services, the CCT-SOR does not apply, as its scope is confined to French-speaking Switzerland. It is therefore the collective labour agreements specific to each sector, often negotiated at regional or cantonal level, that define the minimum conditions in force. The employer must check the applicable provisions with the competent joint committee for its trade. Our tool applies reference profiles for structural work and the finishing trades, weighted by the regional coefficient and the cantonal family allowances, providing an indicative basis for drawing up your bids.

The canton of Basel-Landschaft is one of the cantons where construction labour costs the most: the regional coefficient applied to the base daywork rate is +6%, with Vaud as the reference at 0%. Among the 26 cantons of the reference scale, Basel-Landschaft ranks 5th, on a scale running from −7% to +15%. The employer contributions used are 33.3% for structural work and 24.3% for the finishing trades, including cantonal family allowances (1.9%, compared with 3.4% in Vaud). The other contributions (old-age insurance AVS, unemployment insurance, SUVA, occupational pension LPP, early retirement, daily sickness benefit, joint funds) are the same in every canton. In this canton the Studio applies reference profiles: the result is indicative until you have checked the collective agreement of your sector.

Charges and coefficient for the canton of Basel-Landschaft
ItemValue
Regional coefficient on the daywork rate+6%
Family allowances (CAF) of the canton1.9%
Employer contributions, structural work (CN)33.3%
Employer contributions, finishing trades24.3%
Rank among the 26 cantons (coefficient)5 /26
Daywork rates in the canton of Basel-Landschaft, structural work (CHF/h excl. VAT)
ProfileAverage gross monthly payReference base (VD)Basel-Landschaft
Foreman / site supervisor (class V)7'250 CHF122.00129.30
Experienced qualified bricklayer (class Q)6'350 CHF108.00114.50
Qualified bricklayer / recent graduate (class A)6'000 CHF102.00108.10
Skilled worker / federal certificate holder (class B)5'650 CHF96.00101.75
Labourer / site assistant (class C)5'100 CHF88.0093.30
Daywork rates in the canton of Basel-Landschaft, finishing trades (CHF/h excl. VAT)
ProfileAverage gross monthly payReference base (VD)Basel-Landschaft
Finishing trades foreman (CCT-SOR)6'750 CHF106.00112.35
Experienced qualified tradesperson (class A)6'050 CHF96.00101.75
Recently qualified tradesperson (1st to 3rd year after diploma)5'500 CHF88.0093.30
Skilled worker / federal certificate holder (class B)5'300 CHF85.0090.10
Finishing trades assistant (class C)4'850 CHF79.0083.75

How to read this table. The “Reference base (VD)” column is the Studio’s reference rate. The “Basel-Landschaft” column multiplies it by 1.06 and rounds to 5 centimes, exactly as the Studio does when you choose this canton. Gross monthly pay is the average wage for the profile.

Site realities in the canton of Basel-Landschaft

Organising a site in the canton of Basel-Landschaft calls for sustained attention to the management of your teams and to logistics. Because of its border location, the canton has a strong presence of cross-border labour and of companies operating under the posted-workers regime. Joint and administrative inspections of compliance with working conditions prove frequent and rigorous on sites in the Basel region. The compliance of employment documents, observance of the SUVA rules and the safety provisions of the Construction Work Ordinance (OTConst) must be beyond reproach, on pain of the work being interrupted. In addition, the proximity of the transit routes and the density of certain areas often make it advisable to plan delivery slots and the parking of work vehicles well ahead.

Indicative calculation for the “Experienced qualified tradesperson (class A)” profile (finishing trades): CHF 6'050 gross, plus 24.3% of charges and CHF 595 of monthly expenses, divided by 135 productive hours, give a cost price of CHF 60.11 per hour, before overheads and margin. The daywork rate of CHF 101.75/h therefore leaves CHF 41.64 per hour for overheads and profit.

Main towns and municipalities: construction quotes in Liestal, Allschwil, Reinach and in the canton of Basel-Landschaft

Pricing a construction quote in Liestal or in other municipalities of the canton of Basel-Landschaft requires a fine assessment of the geographical location of the work. Whether your work is carried out in Liestal, Allschwil, Reinach, Muttenz, Pratteln or Binningen, each place involves concrete constraints. Access difficulties for lorries, the availability of storage areas, local parking restrictions or the differences in altitude between the valley floor and the hilly areas directly affect your hourly direct costs. Our tool sets the calculations at cantonal level, leaving it to the estimator to adjust output to the realities of the site.

Cost difference by town, canton of Basel-Landschaft (CHF/h excl. VAT)
TownDifference from the baseExperienced qualified tradesperson (finishing trades)Experienced qualified bricklayer (structural work)
Liestal+6%101.75114.50

How to read this table. The difference for a town is given relative to the reference base (Vaud = 0%), like the canton’s coefficient. When your site is in one of these towns, this line applies, not the cantonal average. The other municipalities follow the canton’s coefficient.

ERP Art Construction and Soumissions Pro also apply the difference for the town of the site to the full price list.

Cascade of deductions for a quote in the canton of Basel-Landschaft

Between the subtotal of the items and the amount to collect, the Studio follows the same steps for every quote. The order matters: each deduction is calculated on the amount left by the previous one. Example with CHF 10'000 of fixed-price items and the Studio’s default settings (discount 0%, pro-rata account 1.5%, deposit 30%):

From the gross subtotal to the deposit (CHF)
StepAmount
Gross subtotal excl. VAT10'000.00
Discount (0%)0.00
Pro-rata account (1.5% after discount)− 150.00
Net total excl. VAT9'850.00
VAT 8.1%+ 797.85
Total incl. VAT (rounded to 5 centimes)10'647.85
Deposit on order (30% of the total incl. VAT)3'194.35

How to read this table. You start from the total of the fixed-price items, take away the discount granted, then the pro-rata account (the contribution to the shared costs of the site), calculated on what remains. VAT of 8.1% applies to the net amount, and the total including VAT is rounded to 5 centimes. Discount, pro-rata account, VAT and deposit percentage are set in the Studio; the deposit is printed with its QR-bill at the bottom of the last page.

The deposit is a percentage of the total including VAT, not of the net amount: the client pays the VAT with the first payment, which finances the first weeks of materials and labour without any advance on your part. The Studio rounds the deposit to 5 centimes, like the amount on the QR-bill, so that it matches the expected payment exactly.

SIA standards and QR-bill deposit in the canton of Basel-Landschaft

A quote that mentions SIA 118, a clear pricing method and a deposit payable by SIX QR-bill avoids the three most common disputes: over the conditions, over the price and over payment. The Studio prints each of these elements as sentences to tick, in the language of the quote (French, German, Italian, Romansh or English).

SIA 118 as contractual basis

Tick box (unticked by default).

SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.

Asbestos and pollutants

Ticked by default.

Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).

Rise in material prices

Ticked by default.

Reservation for increases in material prices according to the KBOB indices in force.

Pricing method

Your choice, when printing.

Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).

The QR-bill replaces the old payment slips: it carries your IBAN, the amount of the deposit and the reference of the quote, and the client pays it from their banking app without retyping anything. The Studio draws it from the same figures as the total, so the amount paid cannot differ from the quote. To go further than a one-off quote:

Frequently asked questions about quotes in the canton of Basel-Landschaft

How can the border context of Basel-Landschaft be built into a quote?

In the canton of Basel-Landschaft, employing cross-border labour or using cross-border subcontracting is best backed by a precise set of documents for inspections by the joint committee. In your bid, allow a margin for the administrative procedures and make sure that wage costs comply with the collective scales in force in the sector, in order to avoid any penalty or stoppage on site.

Which collective agreement should be used for the finishing trades in this canton?

As the CCT-SOR does not apply outside French-speaking Switzerland, you must refer to the regional or cantonal agreements specific to your trade. Contact the local joint committee to find out the minimum wages and charges that apply. Our tool provides an indicative profile adjusted to the realities of the canton to make your pricing secure.

How should travel costs to the municipalities of Basel-Landschaft be priced?

The distance from your workshop, traffic at the road junctions and parking facilities determine your real transport costs. These amounts should be calculated in a site installation item, or your daywork rates adapted, after agreeing beforehand with the client how journey times will be invoiced.

Should SIA standard 118 be applied when drafting the bid?

SIA standard 118 applies only if the contract for work or the quote refers to it expressly. It specifies how measurement is handled, the remuneration of additional services and the procedures for complaints. Including it from the bid stage clarifies relations with site management and protects the company’s margin if something unforeseen occurs.

Price another trade in the canton of Basel-Landschaft

Each trade has its own units and its own collective agreement: choose the trade to see the reservations and rates that go with it.

The 26 cantons

The regional coefficient ranges from −7% to +15% depending on the canton: compare before reusing a rate from a neighbouring site.

Sources and limits. Reference values of Studio Devis Suisse (as at 23.11.2026), CN and CCT-SOR collective agreements, weighted average contribution rates. Indicative only: check the rates of your compensation fund and the collective agreement that applies to your company.