Collective agreements (CLA, CN) and social charges in the canton of Neuchâtel
On sites in the canton of Neuchâtel, the collective framework depends on the nature of the work carried out. Structural work comes under the National Collective Agreement for the main construction industry in Switzerland (CN), which applies throughout Swiss territory. For finishing trades such as joinery, plastering, painting, tiling or the laying of floor coverings, the collective labour agreement for the finishing trades of French-speaking Switzerland (CCT-SOR) applies in the canton of Neuchâtel to the sectors concerned. In addition, the technical trades, including in particular sanitary installations, heating, ventilation and electrical work, are governed by their own sector agreements. The proximity of the border calls for extra vigilance over compliance with customary wage practice. It is worth checking the applicable agreement with the competent joint committee.
In the Studio, the regional coefficient applied to the base daywork rate is −3%, with Vaud as the reference at 0%. Among the 26 cantons of the reference scale, Neuchâtel ranks 23rd, on a scale running from −7% to +15%. The employer contributions used are 34.1% for structural work and 25.1% for the finishing trades, including cantonal family allowances (2.75%, compared with 3.4% in Vaud). The other contributions (old-age insurance AVS, unemployment insurance, SUVA, occupational pension LPP, early retirement, daily sickness benefit, joint funds) are the same in every canton.
| Item | Value |
|---|---|
| Regional coefficient on the daywork rate | −3% |
| Family allowances (CAF) of the canton | 2.75% |
| Employer contributions, structural work (CN) | 34.1% |
| Employer contributions, finishing trades | 25.1% |
| Rank among the 26 cantons (coefficient) | 23 /26 |
| Profile | Average gross monthly pay | Reference base (VD) | Neuchâtel |
|---|---|---|---|
| Foreman / site supervisor (class V) | 7'250 CHF | 122.00 | 118.35 |
| Experienced qualified bricklayer (class Q) | 6'350 CHF | 108.00 | 104.75 |
| Qualified bricklayer / recent graduate (class A) | 6'000 CHF | 102.00 | 98.95 |
| Skilled worker / federal certificate holder (class B) | 5'650 CHF | 96.00 | 93.10 |
| Labourer / site assistant (class C) | 5'100 CHF | 88.00 | 85.35 |
| Profile | Average gross monthly pay | Reference base (VD) | Neuchâtel |
|---|---|---|---|
| Finishing trades foreman (CCT-SOR) | 6'750 CHF | 106.00 | 102.80 |
| Experienced qualified tradesperson (class A) | 6'050 CHF | 96.00 | 93.10 |
| Recently qualified tradesperson (1st to 3rd year after diploma) | 5'500 CHF | 88.00 | 85.35 |
| Skilled worker / federal certificate holder (class B) | 5'300 CHF | 85.00 | 82.45 |
| Finishing trades assistant (class C) | 4'850 CHF | 79.00 | 76.65 |
How to read this table. The “Reference base (VD)” column is the Studio’s reference rate. The “Neuchâtel” column multiplies it by 0.97 and rounds to 5 centimes, exactly as the Studio does when you choose this canton. Gross monthly pay is the average wage for the profile.
Site realities in the canton of Neuchâtel
Running a site in the canton of Neuchâtel often means dealing with marked geographical and climatic constraints. The proximity of the shores of Lake Neuchâtel regularly confronts companies with persistent humidity and considerable exposure to wind, factors that affect the drying times of mortars, renders or exterior paints. In addition, the canton’s border location brings a large presence of cross-border workers and posted companies, accompanied by regular inspections by the joint committees and the supervisory authorities. Organising access, temporarily storing materials against bad weather and taking account of the safety rules of SUVA and of the Construction Work Ordinance (OTConst) are major points of attention from the moment you draw up your bid.
Indicative calculation for the “Experienced qualified tradesperson (class A)” profile (finishing trades): CHF 6'050 gross, plus 25.1% of charges and CHF 595 of monthly expenses, divided by 135 productive hours, give a cost price of CHF 60.47 per hour, before overheads and margin. The daywork rate of CHF 93.10/h therefore leaves CHF 32.63 per hour for overheads and profit.
Main towns and municipalities: construction quotes in Neuchâtel, La Chaux-de-Fonds, Le Locle and in the canton of Neuchâtel
To draw up an accurate construction quote in the canton of Neuchâtel, the exact geographical location of the work plays a decisive role in your direct costs. Whether your work is carried out in Neuchâtel, La Chaux-de-Fonds, Le Locle, Boudry or Val-de-Travers, the real conditions of execution vary considerably. The Jura terrain, altitude, access that is sometimes restricted in urban or rural areas and the constraints of snow cover in winter change the transport logistics and productivity on site. Our tool automatically adapts its reference calculations to the level of the canton of Neuchâtel, while leaving you free to adjust your daywork times, travel costs and allowances to the municipality concerned.
- Neuchâtel
- La Chaux-de-Fonds
- Le Locle
- Boudry
- Val-de-Travers
| Town | Difference from the base | Experienced qualified tradesperson (finishing trades) | Experienced qualified bricklayer (structural work) |
|---|---|---|---|
| City of Neuchâtel | −2% | 94.10 | 105.85 |
| La Chaux-de-Fonds | −4% | 92.15 | 103.70 |
How to read this table. The difference for a town is given relative to the reference base (Vaud = 0%), like the canton’s coefficient. When your site is in one of these towns, this line applies, not the cantonal average. The other municipalities follow the canton’s coefficient.
ERP Art Construction and Soumissions Pro also apply the difference for the town of the site to the full price list.
Cascade of deductions for a quote in the canton of Neuchâtel
Between the subtotal of the items and the amount to collect, the Studio follows the same steps for every quote. The order matters: each deduction is calculated on the amount left by the previous one. Example with CHF 10'000 of fixed-price items and the Studio’s default settings (discount 0%, pro-rata account 1.5%, deposit 30%):
| Step | Amount |
|---|---|
| Gross subtotal excl. VAT | 10'000.00 |
| Discount (0%) | 0.00 |
| Pro-rata account (1.5% after discount) | − 150.00 |
| Net total excl. VAT | 9'850.00 |
| VAT 8.1% | + 797.85 |
| Total incl. VAT (rounded to 5 centimes) | 10'647.85 |
| Deposit on order (30% of the total incl. VAT) | 3'194.35 |
How to read this table. You start from the total of the fixed-price items, take away the discount granted, then the pro-rata account (the contribution to the shared costs of the site), calculated on what remains. VAT of 8.1% applies to the net amount, and the total including VAT is rounded to 5 centimes. Discount, pro-rata account, VAT and deposit percentage are set in the Studio; the deposit is printed with its QR-bill at the bottom of the last page.
The deposit is a percentage of the total including VAT, not of the net amount: the client pays the VAT with the first payment, which finances the first weeks of materials and labour without any advance on your part. The Studio rounds the deposit to 5 centimes, like the amount on the QR-bill, so that it matches the expected payment exactly.
SIA standards and QR-bill deposit in the canton of Neuchâtel
A quote that mentions SIA 118, a clear pricing method and a deposit payable by SIX QR-bill avoids the three most common disputes: over the conditions, over the price and over payment. The Studio prints each of these elements as sentences to tick, in the language of the quote (French, German, Italian, Romansh or English).
SIA 118 as contractual basis
Tick box (unticked by default).
SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.
Asbestos and pollutants
Ticked by default.
Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).
Rise in material prices
Ticked by default.
Reservation for increases in material prices according to the KBOB indices in force.
Pricing method
Your choice, when printing.
Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).
The QR-bill replaces the old payment slips: it carries your IBAN, the amount of the deposit and the reference of the quote, and the client pays it from their banking app without retyping anything. The Studio draws it from the same figures as the total, so the amount paid cannot differ from the quote. To go further than a one-off quote:
Frequently asked questions about quotes in the canton of Neuchâtel
How should climatic constraints in the canton of Neuchâtel be taken into account when pricing?
Between the Neuchâtel lakeside, exposed to lake fog, and the localities at higher altitude, temperature ranges and precipitation vary greatly. It is often appropriate to adapt installation output for exterior works, to provide winter protection equipment according to the period and to include the costs of withdrawing from site or securing the scaffolding in accordance with the rules in force.
Which collective agreement applies to a finishing-trades site?
In this canton, finishing work such as plastering, painting, joinery or tiling comes in principle under the CCT-SOR. By contrast, the electrical and building-services trades follow other specific agreements. To make your calculations of social charges and basic wages secure, it is advisable to refer to the scales approved by the joint committee of your sector.
What precautions are linked to joint inspections on border-area sites?
The border location generates frequent checks of working conditions and minimum wages by the joint committees. If you use subcontractors or posted staff, make sure beforehand that all the administrative documents and the required declarations are in order. Any failure or delay in this respect can lead to work being interrupted and weigh heavily on the contractual schedule.
Is it useful to refer to SIA standard 118 in your bids?
The incorporation of SIA standard 118 is not automatic under Swiss law: it requires an explicit contractual agreement between the contractor and the client. When it is stipulated in the quote or in the contract for work, it specifies the measurement procedures, the conditions for ordering additional work and the warranty periods, providing a clear framework for preventing disputes during execution.
Price another trade in the canton of Neuchâtel
Each trade has its own units and its own collective agreement: choose the trade to see the reservations and rates that go with it.
- CFC 112 Demolition & deconstruction
- CFC 201 Earthworks & excavation
- CFC 211 Masonry & structural work
- CFC 213 Structural steelwork
- CFC 214 Carpentry & timber structures
- CFC 221 Joinery & windows
- CFC 222 Sheet-metal work
- CFC 224 Roofing & waterproofing
- CFC 226 Rendering & façade insulation
- CFC 228 Shutters & blinds
- CFC 232 Electrical installations
- CFC 242 Heating & heat generation
- CFC 251 Sanitary installations
- CFC 271 Plastering & drywall
- CFC 272 Metal construction & locksmith work
- CFC 273 Interior joinery
- CFC 281 Floor coverings (tiling, parquet)
- CFC 282 Wall coverings & wall tiling
- CFC 285 Painting & wallpapering
- CFC 287 Final site cleaning
The 26 cantons
The regional coefficient ranges from −7% to +15% depending on the canton: compare before reusing a rate from a neighbouring site.
- Vaud (VD)
- Geneva (GE)
- Valais (VS)
- Fribourg (FR)
- Neuchâtel (NE)
- Jura (JU)
- Bern (BE)
- Zurich (ZH)
- Zug (ZG)
- Basel-Stadt (BS)
- Basel-Landschaft (BL)
- Aargau (AG)
- Solothurn (SO)
- Lucerne (LU)
- Schwyz (SZ)
- Nidwalden (NW)
- Obwalden (OW)
- Uri (UR)
- St. Gallen (SG)
- Thurgau (TG)
- Schaffhausen (SH)
- Appenzell Ausserrhoden (AR)
- Appenzell Innerrhoden (AI)
- Glarus (GL)
- Graubünden (GR)
- Ticino (TI)