Construction quote in the canton of St. Gallen: collective agreements, social charges and QR-bill deposit

Price a quote in the canton of St. Gallen at the right hourly cost, apply discount, pro-rata account and VAT in sequence, then collect the deposit by SIX QR-bill.

In the canton of St. Gallen, the Studio applies a regional coefficient of +2% to the reference daywork rate, and employer contributions of 33.2% for structural work and 24.2% for the finishing trades, of which 1.85% is family allowances. Before VAT of 8.1%, your quote still has to absorb the pro-rata account, the discount and the 135 productive hours (out of 176 paid): the Studio applies these deductions in sequence and generates the QR-bill for the deposit. Collective agreement for the finishing trades to be checked: the CCT-SOR covers only French-speaking Switzerland.

Studio Devis SuisseSIA & QR-bill editor · Construction companies
CHF 0 · No account
  • A4 PDF ready to sign
  • SIX QR-bill built in
  • 100% in the browser

Free manual entry · 14’045 ACIP prices & cantons in Soumissions Pro →

Collective agreements (CLA, CN) and social charges in the canton of St. Gallen

In the canton of St. Gallen, structural work sites fall under the national framework of the National Collective Agreement for the main construction industry in Switzerland (CN). By contrast, the CCT-SOR does not in principle concern this canton, as its scope is confined to French-speaking Switzerland. For all the finishing trades and building services, employment relationships are governed by sector collective labour agreements, negotiated at cantonal or regional level. It is up to the contractor to check the wage provisions in force with the competent joint committee. For your costing, our solution applies reference profiles for structural work and the finishing trades, weighted by the cantonal parameters, on an indicative basis.

In the Studio, the regional coefficient applied to the base daywork rate is +2%, with Vaud as the reference at 0%. Among the 26 cantons of the reference scale, St. Gallen ranks 10th, on a scale running from −7% to +15%. The employer contributions used are 33.2% for structural work and 24.2% for the finishing trades, including cantonal family allowances (1.85%, compared with 3.4% in Vaud). The other contributions (old-age insurance AVS, unemployment insurance, SUVA, occupational pension LPP, early retirement, daily sickness benefit, joint funds) are the same in every canton. In this canton the Studio applies reference profiles: the result is indicative until you have checked the collective agreement of your sector.

Charges and coefficient for the canton of St. Gallen
ItemValue
Regional coefficient on the daywork rate+2%
Family allowances (CAF) of the canton1.85%
Employer contributions, structural work (CN)33.2%
Employer contributions, finishing trades24.2%
Rank among the 26 cantons (coefficient)10 /26
Daywork rates in the canton of St. Gallen, structural work (CHF/h excl. VAT)
ProfileAverage gross monthly payReference base (VD)St. Gallen
Foreman / site supervisor (class V)7'250 CHF122.00124.45
Experienced qualified bricklayer (class Q)6'350 CHF108.00110.15
Qualified bricklayer / recent graduate (class A)6'000 CHF102.00104.05
Skilled worker / federal certificate holder (class B)5'650 CHF96.0097.90
Labourer / site assistant (class C)5'100 CHF88.0089.75
Daywork rates in the canton of St. Gallen, finishing trades (CHF/h excl. VAT)
ProfileAverage gross monthly payReference base (VD)St. Gallen
Finishing trades foreman (CCT-SOR)6'750 CHF106.00108.10
Experienced qualified tradesperson (class A)6'050 CHF96.0097.90
Recently qualified tradesperson (1st to 3rd year after diploma)5'500 CHF88.0089.75
Skilled worker / federal certificate holder (class B)5'300 CHF85.0086.70
Finishing trades assistant (class C)4'850 CHF79.0080.60

How to read this table. The “Reference base (VD)” column is the Studio’s reference rate. The “St. Gallen” column multiplies it by 1.02 and rounds to 5 centimes, exactly as the Studio does when you choose this canton. Gross monthly pay is the average wage for the profile.

Site realities in the canton of St. Gallen

Drawing up a bid in the canton of St. Gallen requires careful consideration of the geographical and climatic constraints. The areas of Alpine relief are best approached by anticipating the harshness of winter, altitude, snow and an often shortened season, as these factors can complicate access. Near the lakes, teams face persistent humidity and strong wind corridors that influence the drying and durability of external materials. As this is a border canton, managing posted or cross-border workers requires careful monitoring of the formalities, with the joint committees checking working conditions according to the applicable rules.

Indicative calculation for the “Experienced qualified tradesperson (class A)” profile (finishing trades): CHF 6'050 gross, plus 24.2% of charges and CHF 595 of monthly expenses, divided by 135 productive hours, give a cost price of CHF 60.07 per hour, before overheads and margin. The daywork rate of CHF 97.90/h therefore leaves CHF 37.83 per hour for overheads and profit.

Main towns and municipalities: construction quotes in St. Gallen, Rapperswil-Jona, Wil and in the canton of St. Gallen

Whether your work is located in St. Gallen, Rapperswil-Jona, Wil, Gossau, Buchs or Uzwil, the exact geographical location influences your real outlay. Between delivery constraints in dense urban areas, Alpine differences in level and lakeside access, transport costs, the teams’ travelling time and site set-up vary from one municipality to another. Studio Devis Suisse adjusts its bases of calculation to the specifics of the canton of St. Gallen, leaving you free to adapt your margins and your approach costs to the precise configuration of each assignment entrusted by the client.

Cost difference by town, canton of St. Gallen (CHF/h excl. VAT)
TownDifference from the baseExperienced qualified tradesperson (finishing trades)Experienced qualified bricklayer (structural work)
St. Gallen+3%98.90111.25
Rapperswil+6%101.75114.50

How to read this table. The difference for a town is given relative to the reference base (Vaud = 0%), like the canton’s coefficient. When your site is in one of these towns, this line applies, not the cantonal average. The other municipalities follow the canton’s coefficient.

ERP Art Construction and Soumissions Pro also apply the difference for the town of the site to the full price list.

Cascade of deductions for a quote in the canton of St. Gallen

Between the subtotal of the items and the amount to collect, the Studio follows the same steps for every quote. The order matters: each deduction is calculated on the amount left by the previous one. Example with CHF 10'000 of fixed-price items and the Studio’s default settings (discount 0%, pro-rata account 1.5%, deposit 30%):

From the gross subtotal to the deposit (CHF)
StepAmount
Gross subtotal excl. VAT10'000.00
Discount (0%)0.00
Pro-rata account (1.5% after discount)− 150.00
Net total excl. VAT9'850.00
VAT 8.1%+ 797.85
Total incl. VAT (rounded to 5 centimes)10'647.85
Deposit on order (30% of the total incl. VAT)3'194.35

How to read this table. You start from the total of the fixed-price items, take away the discount granted, then the pro-rata account (the contribution to the shared costs of the site), calculated on what remains. VAT of 8.1% applies to the net amount, and the total including VAT is rounded to 5 centimes. Discount, pro-rata account, VAT and deposit percentage are set in the Studio; the deposit is printed with its QR-bill at the bottom of the last page.

The deposit is a percentage of the total including VAT, not of the net amount: the client pays the VAT with the first payment, which finances the first weeks of materials and labour without any advance on your part. The Studio rounds the deposit to 5 centimes, like the amount on the QR-bill, so that it matches the expected payment exactly.

SIA standards and QR-bill deposit in the canton of St. Gallen

A quote that mentions SIA 118, a clear pricing method and a deposit payable by SIX QR-bill avoids the three most common disputes: over the conditions, over the price and over payment. The Studio prints each of these elements as sentences to tick, in the language of the quote (French, German, Italian, Romansh or English).

SIA 118 as contractual basis

Tick box (unticked by default).

SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.

Asbestos and pollutants

Ticked by default.

Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).

Rise in material prices

Ticked by default.

Reservation for increases in material prices according to the KBOB indices in force.

Pricing method

Your choice, when printing.

Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).

The QR-bill replaces the old payment slips: it carries your IBAN, the amount of the deposit and the reference of the quote, and the client pays it from their banking app without retyping anything. The Studio draws it from the same figures as the total, so the amount paid cannot differ from the quote. To go further than a one-off quote:

Frequently asked questions about quotes in the canton of St. Gallen

How do I build the rules of the canton of St. Gallen into my quote?

Your bid must reflect local conditions without weighing down the commercial presentation. Enter the address of the work to apply the canton’s parameters, then adjust your site set-up and access headings according to the municipality concerned. It is useful to state whether your amounts are presented excluding VAT or including VAT at 8.1%, and to mention SIA standard 118 as well as Articles 373 and 374 of the CO in order to clarify lump-sum or daywork remuneration.

What precautions should be taken with cross-border subcontracting?

The canton’s border location increases the number of jobs carried out by outside companies or installers. If you use subcontractors, you must make sure that their staff are compliant by checking with the joint committee of the sector concerned. Any breach of customary wage practices or of the declarations can lead to the immediate shutdown of the site by the inspection bodies, generating delays attributable to your company.

How should outdoor work near the lakes be priced?

The proximity of the shores subjects structures to regular winds and high humidity. When preparing the quote, allow suitable setting times for concretes and renders, as well as reinforced façade protection. Include these elements in the preparatory items or provide explicit extras for the use of technical products resistant to damp exposure.

Should a retention under SIA standard 118 be mentioned?

Applying SIA standard 118 provides a framework for the retention, generally adjustable up to ten per cent of the amount of the work, to cover any faulty workmanship during the two-year period for notifying defects. State in your quote whether this guarantee is exercised by retention on the interim payments or by lodging an equivalent bank guarantee, in order to preserve your liquidity.

Price another trade in the canton of St. Gallen

Each trade has its own units and its own collective agreement: choose the trade to see the reservations and rates that go with it.

The 26 cantons

The regional coefficient ranges from −7% to +15% depending on the canton: compare before reusing a rate from a neighbouring site.