Collective agreements (CLA, CN) and social charges in the canton of Thurgau
On sites in Thurgau, the collective-agreement framework depends directly on your trade. For structural work, the National Collective Agreement for the main construction industry (CN) applies uniformly across the canton. By contrast, the CCT-SOR does not concern this region, as it is confined to French-speaking Switzerland. For all the finishing trades, building services and finishes, you must refer to the collective labour agreements specific to each professional sector, often negotiated at regional or cantonal level. The wage provisions and working conditions relating to your teams, including posted or cross-border staff, must be confirmed with the competent joint committees. The indicative calculation profiles offered take into account the specifics of the sector as well as the social charges and family allowances in force in the canton.
In the Studio, the regional coefficient applied to the base daywork rate is 0%, with Vaud as the reference at 0%. Among the 26 cantons of the reference scale, Thurgau ranks 15th, on a scale running from −7% to +15%. The employer contributions used are 33.2% for structural work and 24.2% for the finishing trades, including cantonal family allowances (1.8%, compared with 3.4% in Vaud). The other contributions (old-age insurance AVS, unemployment insurance, SUVA, occupational pension LPP, early retirement, daily sickness benefit, joint funds) are the same in every canton. In this canton the Studio applies reference profiles: the result is indicative until you have checked the collective agreement of your sector.
| Item | Value |
|---|---|
| Regional coefficient on the daywork rate | 0% |
| Family allowances (CAF) of the canton | 1.8% |
| Employer contributions, structural work (CN) | 33.2% |
| Employer contributions, finishing trades | 24.2% |
| Rank among the 26 cantons (coefficient) | 15 /26 |
| Profile | Average gross monthly pay | Reference base (VD) | Thurgau |
|---|---|---|---|
| Foreman / site supervisor (class V) | 7'250 CHF | 122.00 | 122.00 |
| Experienced qualified bricklayer (class Q) | 6'350 CHF | 108.00 | 108.00 |
| Qualified bricklayer / recent graduate (class A) | 6'000 CHF | 102.00 | 102.00 |
| Skilled worker / federal certificate holder (class B) | 5'650 CHF | 96.00 | 96.00 |
| Labourer / site assistant (class C) | 5'100 CHF | 88.00 | 88.00 |
| Profile | Average gross monthly pay | Reference base (VD) | Thurgau |
|---|---|---|---|
| Finishing trades foreman (CCT-SOR) | 6'750 CHF | 106.00 | 106.00 |
| Experienced qualified tradesperson (class A) | 6'050 CHF | 96.00 | 96.00 |
| Recently qualified tradesperson (1st to 3rd year after diploma) | 5'500 CHF | 88.00 | 88.00 |
| Skilled worker / federal certificate holder (class B) | 5'300 CHF | 85.00 | 85.00 |
| Finishing trades assistant (class C) | 4'850 CHF | 79.00 | 79.00 |
How to read this table. The “Reference base (VD)” column is the Studio’s reference rate. The “Thurgau” column multiplies it by 1 and rounds to 5 centimes, exactly as the Studio does when you choose this canton. Gross monthly pay is the average wage for the profile.
Site realities in the canton of Thurgau
Carrying out work in this canton requires careful consideration of the border and geographical context. In the border area, the frequent presence of cross-border workers or posted subcontractors calls for sound administrative rigour during inspections by the joint and cantonal bodies. Unforeseen administrative interruptions can quickly weigh on the overall schedule. In addition, the immediate proximity of large expanses of water, in particular the lake shores, exposes sites to persistent atmospheric humidity and marked wind patterns. These climatic factors often influence the planning of outdoor work, the drying of concretes, renders and paints, and the protection of the works, in accordance with the safety rules in force.
Indicative calculation for the “Experienced qualified tradesperson (class A)” profile (finishing trades): CHF 6'050 gross, plus 24.2% of charges and CHF 595 of monthly expenses, divided by 135 productive hours, give a cost price of CHF 60.07 per hour, before overheads and margin. The daywork rate of CHF 96.00/h therefore leaves CHF 35.93 per hour for overheads and profit.
Main towns and municipalities: construction quotes in Frauenfeld, Kreuzlingen, Arbon and in the canton of Thurgau
To draw up a construction quote in Frauenfeld or anywhere in the canton, the exact geographical location of your work remains decisive. Whether your teams are operating in Kreuzlingen, Arbon, Amriswil, Weinfelden or Romanshorn, the logistical constraints differ appreciably according to urban density, parking conditions, ease of access for heavy goods vehicles or local exposure to wind and lakeside humidity. These parameters change handling times, supplies and real installation output. Studio Devis Suisse bases its calculations on the cantonal figures for Thurgau, while leaving you free to refine your items for transport, site installations and labour according to the realities of each municipality.
- Frauenfeld
- Kreuzlingen
- Arbon
- Amriswil
- Weinfelden
- Romanshorn
| Town | Difference from the base | Experienced qualified tradesperson (finishing trades) | Experienced qualified bricklayer (structural work) |
|---|---|---|---|
| Frauenfeld | 0% | 96.00 | 108.00 |
| Kreuzlingen | +1% | 96.95 | 109.10 |
How to read this table. The difference for a town is given relative to the reference base (Vaud = 0%), like the canton’s coefficient. When your site is in one of these towns, this line applies, not the cantonal average. The other municipalities follow the canton’s coefficient.
ERP Art Construction and Soumissions Pro also apply the difference for the town of the site to the full price list.
Cascade of deductions for a quote in the canton of Thurgau
Between the subtotal of the items and the amount to collect, the Studio follows the same steps for every quote. The order matters: each deduction is calculated on the amount left by the previous one. Example with CHF 10'000 of fixed-price items and the Studio’s default settings (discount 0%, pro-rata account 1.5%, deposit 30%):
| Step | Amount |
|---|---|
| Gross subtotal excl. VAT | 10'000.00 |
| Discount (0%) | 0.00 |
| Pro-rata account (1.5% after discount) | − 150.00 |
| Net total excl. VAT | 9'850.00 |
| VAT 8.1% | + 797.85 |
| Total incl. VAT (rounded to 5 centimes) | 10'647.85 |
| Deposit on order (30% of the total incl. VAT) | 3'194.35 |
How to read this table. You start from the total of the fixed-price items, take away the discount granted, then the pro-rata account (the contribution to the shared costs of the site), calculated on what remains. VAT of 8.1% applies to the net amount, and the total including VAT is rounded to 5 centimes. Discount, pro-rata account, VAT and deposit percentage are set in the Studio; the deposit is printed with its QR-bill at the bottom of the last page.
The deposit is a percentage of the total including VAT, not of the net amount: the client pays the VAT with the first payment, which finances the first weeks of materials and labour without any advance on your part. The Studio rounds the deposit to 5 centimes, like the amount on the QR-bill, so that it matches the expected payment exactly.
SIA standards and QR-bill deposit in the canton of Thurgau
A quote that mentions SIA 118, a clear pricing method and a deposit payable by SIX QR-bill avoids the three most common disputes: over the conditions, over the price and over payment. The Studio prints each of these elements as sentences to tick, in the language of the quote (French, German, Italian, Romansh or English).
SIA 118 as contractual basis
Tick box (unticked by default).
SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.
Asbestos and pollutants
Ticked by default.
Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).
Rise in material prices
Ticked by default.
Reservation for increases in material prices according to the KBOB indices in force.
Pricing method
Your choice, when printing.
Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).
The QR-bill replaces the old payment slips: it carries your IBAN, the amount of the deposit and the reference of the quote, and the client pays it from their banking app without retyping anything. The Studio draws it from the same figures as the total, so the amount paid cannot differ from the quote. To go further than a one-off quote:
Frequently asked questions about quotes in the canton of Thurgau
How do I adapt my prices to local constraints in Thurgau?
Pricing in the canton must take into account the distance from depots, the access routes to the site and the climatic constraints specific to the lakeside areas. You should assess precisely the approach costs, the teams’ travelling time and the collective protective equipment recommended by SUVA. Building these indirect costs into your unit prices allows you to protect your margin against the uncertainties of the site.
How should cross-border workers be handled on a site in the canton?
Hiring cross-border workers or using posted subcontractors requires attention to the minimum wages and customary charges defined for your sector. Frequent inspections take place on sites. You must make sure that everyone involved holds the required permits and that your prices include the real cost of this administrative management.
Does SIA standard 118 apply by default to my quote?
SIA standard 118 does not apply automatically when a contract for work is signed. For it to govern relations with the client and site management, you must expressly mention its incorporation in your written bid. Failing that, it is generally the rules of the CO on contracts for work that govern the work.
Which VAT rate should be applied to a bid for renovation or new build?
In Switzerland, services for the construction, renovation or maintenance of buildings are subject to the standard VAT rate of 8.1%. Your bid must clearly show the amounts excluding VAT, the share of tax calculated at 8.1% and the total including VAT, thereby making subsequent invoicing by QR-bill in accordance with the SIX standard easier.
Price another trade in the canton of Thurgau
Each trade has its own units and its own collective agreement: choose the trade to see the reservations and rates that go with it.
- CFC 112 Demolition & deconstruction
- CFC 201 Earthworks & excavation
- CFC 211 Masonry & structural work
- CFC 213 Structural steelwork
- CFC 214 Carpentry & timber structures
- CFC 221 Joinery & windows
- CFC 222 Sheet-metal work
- CFC 224 Roofing & waterproofing
- CFC 226 Rendering & façade insulation
- CFC 228 Shutters & blinds
- CFC 232 Electrical installations
- CFC 242 Heating & heat generation
- CFC 251 Sanitary installations
- CFC 271 Plastering & drywall
- CFC 272 Metal construction & locksmith work
- CFC 273 Interior joinery
- CFC 281 Floor coverings (tiling, parquet)
- CFC 282 Wall coverings & wall tiling
- CFC 285 Painting & wallpapering
- CFC 287 Final site cleaning
The 26 cantons
The regional coefficient ranges from −7% to +15% depending on the canton: compare before reusing a rate from a neighbouring site.
- Vaud (VD)
- Geneva (GE)
- Valais (VS)
- Fribourg (FR)
- Neuchâtel (NE)
- Jura (JU)
- Bern (BE)
- Zurich (ZH)
- Zug (ZG)
- Basel-Stadt (BS)
- Basel-Landschaft (BL)
- Aargau (AG)
- Solothurn (SO)
- Lucerne (LU)
- Schwyz (SZ)
- Nidwalden (NW)
- Obwalden (OW)
- Uri (UR)
- St. Gallen (SG)
- Thurgau (TG)
- Schaffhausen (SH)
- Appenzell Ausserrhoden (AR)
- Appenzell Innerrhoden (AI)
- Glarus (GL)
- Graubünden (GR)
- Ticino (TI)