3D rendering of a street lined with apartment buildings, from daytime to dusk – construction quote template for the canton of Geneva (GE)

Canton of Geneva · Daywork +12% · CN and CCT-SOR

Construction quote in the canton of Geneva: collective agreements, social charges and QR-bill deposit

Price a quote in the canton of Geneva at the right hourly cost, apply discount, pro-rata account and VAT in sequence, then collect the deposit by SIX QR-bill.

In the canton of Geneva, the Studio applies a regional coefficient of +12% to the reference daywork rate, and employer contributions of 35.2% for structural work and 26.2% for the finishing trades, of which 2.85% is family allowances. Before VAT of 8.1%, your quote still has to absorb the pro-rata account, the discount and the 135 productive hours (out of 176 paid): the Studio applies these deductions in sequence and generates the QR-bill for the deposit.

Studio Devis SuisseSIA & QR-bill editor · Construction companies
CHF 0 · No account
  • A4 PDF ready to sign
  • SIX QR-bill built in
  • 100% in the browser

Free manual entry · 14’045 ACIP prices & cantons in Soumissions Pro →

Collective agreements (CLA, CN) and social charges in the canton of Geneva

In the canton of Geneva, working conditions are framed by several collective agreements depending on the nature of the work. The National Collective Agreement for the main construction industry governs companies active in structural work. For finishing trades such as plastering, painting, joinery or the laying of floor coverings, the collective labour agreement for the finishing trades of French-speaking Switzerland applies in principle to the trades concerned. The technical sectors, in particular heating, ventilation, air conditioning, sanitary installations or electrical work, come under their own professional agreements. Given the strict regulation and the monitoring carried out by the joint committees, you should check carefully which agreement applies to your trade before settling your labour forecasts.

The canton of Geneva is one of the cantons where construction labour costs the most: the regional coefficient applied to the base daywork rate is +12%, with Vaud as the reference at 0%. Among the 26 cantons of the reference scale, Geneva ranks 3rd, on a scale running from −7% to +15%. The employer contributions used are 35.2% for structural work and 26.2% for the finishing trades, including cantonal family allowances (2.85%, compared with 3.4% in Vaud). The other contributions (old-age insurance AVS, unemployment insurance, SUVA, occupational pension LPP, early retirement, daily sickness benefit, joint funds) are the same in every canton.

Charges and coefficient for the canton of Geneva
ItemValue
Regional coefficient on the daywork rate+12%
Family allowances (CAF) of the canton2.85%
Employer contributions, structural work (CN)35.2%
Employer contributions, finishing trades26.2%
Rank among the 26 cantons (coefficient)3 /26
Daywork rates in the canton of Geneva, structural work (CHF/h excl. VAT)
ProfileAverage gross monthly payReference base (VD)Geneva
Foreman / site supervisor (class V)7'250 CHF122.00136.65
Experienced qualified bricklayer (class Q)6'350 CHF108.00120.95
Qualified bricklayer / recent graduate (class A)6'000 CHF102.00114.25
Skilled worker / federal certificate holder (class B)5'650 CHF96.00107.50
Labourer / site assistant (class C)5'100 CHF88.0098.55
Daywork rates in the canton of Geneva, finishing trades (CHF/h excl. VAT)
ProfileAverage gross monthly payReference base (VD)Geneva
Finishing trades foreman (CCT-SOR)6'750 CHF106.00118.70
Experienced qualified tradesperson (class A)6'050 CHF96.00107.50
Recently qualified tradesperson (1st to 3rd year after diploma)5'500 CHF88.0098.55
Skilled worker / federal certificate holder (class B)5'300 CHF85.0095.20
Finishing trades assistant (class C)4'850 CHF79.0088.50

How to read this table. The “Reference base (VD)” column is the Studio’s reference rate. The “Geneva” column multiplies it by 1.12 and rounds to 5 centimes, exactly as the Studio does when you choose this canton. Gross monthly pay is the average wage for the profile.

Site realities in the canton of Geneva

Pricing a project in Geneva means allowing for very marked site constraints. The high urban density is best anticipated with care where public land is occupied, whether for erecting scaffolding, bringing in skips or parking commercial vehicles, all of which may be subject to specific road-use permits. The proximity of the harbour and of the watercourses exposes structures to sustained humidity and to the effects of wind, which can affect the drying time of certain materials or call for specific protection. In addition, the canton’s border location brings a large presence of cross-border and posted workers, who are subject to diligent joint inspections on site, which justifies impeccable upkeep of your administrative records.

Indicative calculation for the “Experienced qualified tradesperson (class A)” profile (finishing trades): CHF 6'050 gross, plus 26.2% of charges and CHF 595 of monthly expenses, divided by 135 productive hours, give a cost price of CHF 60.96 per hour, before overheads and margin. The daywork rate of CHF 107.50/h therefore leaves CHF 46.54 per hour for overheads and profit.

Main towns and municipalities: construction quotes in Geneva, Carouge, Lancy and in the canton of Geneva

Preparing a construction quote in Geneva must take into account the precise location of the plot, because access to the site, traffic and storage options change the real cost of the work. Whether your services are carried out in the heart of Geneva, in the built-up fabric of Carouge, Lancy, Vernier, Meyrin, Onex, Thônex, or towards the business and residential areas of Plan-les-Ouates and Cologny, the logistical difficulties vary considerably. Studio Devis Suisse calibrates its general parameters on the canton of Geneva as a whole, leaving you free to adjust your travel times, your installation costs and your daywork items to the constraints specific to each municipality.

Cost difference by town, canton of Geneva (CHF/h excl. VAT)
TownDifference from the baseExperienced qualified tradesperson (finishing trades)Experienced qualified bricklayer (structural work)
City of Geneva+15%110.40124.20
Carouge/Lancy+12%107.50120.95
Cologny+18%113.30127.45

How to read this table. The difference for a town is given relative to the reference base (Vaud = 0%), like the canton’s coefficient. When your site is in one of these towns, this line applies, not the cantonal average. The other municipalities follow the canton’s coefficient.

ERP Art Construction and Soumissions Pro also apply the difference for the town of the site to the full price list.

Cascade of deductions for a quote in the canton of Geneva

Between the subtotal of the items and the amount to collect, the Studio follows the same steps for every quote. The order matters: each deduction is calculated on the amount left by the previous one. Example with CHF 10'000 of fixed-price items and the Studio’s default settings (discount 0%, pro-rata account 1.5%, deposit 30%):

From the gross subtotal to the deposit (CHF)
StepAmount
Gross subtotal excl. VAT10'000.00
Discount (0%)0.00
Pro-rata account (1.5% after discount)− 150.00
Net total excl. VAT9'850.00
VAT 8.1%+ 797.85
Total incl. VAT (rounded to 5 centimes)10'647.85
Deposit on order (30% of the total incl. VAT)3'194.35

How to read this table. You start from the total of the fixed-price items, take away the discount granted, then the pro-rata account (the contribution to the shared costs of the site), calculated on what remains. VAT of 8.1% applies to the net amount, and the total including VAT is rounded to 5 centimes. Discount, pro-rata account, VAT and deposit percentage are set in the Studio; the deposit is printed with its QR-bill at the bottom of the last page.

The deposit is a percentage of the total including VAT, not of the net amount: the client pays the VAT with the first payment, which finances the first weeks of materials and labour without any advance on your part. The Studio rounds the deposit to 5 centimes, like the amount on the QR-bill, so that it matches the expected payment exactly.

SIA standards and QR-bill deposit in the canton of Geneva

A quote that mentions SIA 118, a clear pricing method and a deposit payable by SIX QR-bill avoids the three most common disputes: over the conditions, over the price and over payment. The Studio prints each of these elements as sentences to tick, in the language of the quote (French, German, Italian, Romansh or English).

SIA 118 as contractual basis

Tick box (unticked by default).

SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.

Asbestos and pollutants

Ticked by default.

Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).

Rise in material prices

Ticked by default.

Reservation for increases in material prices according to the KBOB indices in force.

Pricing method

Your choice, when printing.

Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).

The QR-bill replaces the old payment slips: it carries your IBAN, the amount of the deposit and the reference of the quote, and the client pays it from their banking app without retyping anything. The Studio draws it from the same figures as the total, so the amount paid cannot differ from the quote. To go further than a one-off quote:

Frequently asked questions about quotes in the canton of Geneva

How can delivery constraints on a site in the canton of Geneva be passed on?

Access difficulties in dense areas often call for split deliveries or very narrow time slots. In your quote, provide a specific item for site logistics, intermediate handling and temporary off-site storage if space is lacking, so that this idle time is not charged against your real rates of progress.

What arrangements should be made for inspections by the joint committee?

Local sites undergo regular inspections aimed at compliance with the collective agreements, particularly for cross-border or subcontracted staff. Include in your indirect costs the administrative time needed to draw up the certificates, to give prior notice of those working on site and to check the wage compliance of any partners.

What impact does the presence of the lake have on the pricing of façades and paintwork?

Ambient humidity and exposure to wind near the lake affect the application phases of renders, finishing plasters and exterior paints. It is prudent to adapt the application schedule and to price sheeting or adequate weather protection on the scaffolding, in order to guarantee compliant workmanship without suffering prolonged interruptions.

How should daywork be structured under SIA standard 118?

If the client requests work not included in the lump-sum price, SIA standard 118 frames the use of daywork. Write your daywork sheets in detail, stating the workers’ hours, the machines and the materials actually used, then have them countersigned promptly by site management within the contractual deadlines.

Price another trade in the canton of Geneva

Each trade has its own units and its own collective agreement: choose the trade to see the reservations and rates that go with it.

The 26 cantons

The regional coefficient ranges from −7% to +15% depending on the canton: compare before reusing a rate from a neighbouring site.

Sources and limits. Reference values of Studio Devis Suisse (as at 23.11.2026), CN and CCT-SOR collective agreements, weighted average contribution rates. Indicative only: check the rates of your compensation fund and the collective agreement that applies to your company.