3D rendering of a street lined with apartment buildings, from daytime to dusk – construction quote template for the canton of Schwyz (SZ)

Canton of Schwyz · Daywork +5% · CN and sector agreements

Construction quote in the canton of Schwyz: collective agreements, social charges and QR-bill deposit

Price a quote in the canton of Schwyz at the right hourly cost, apply discount, pro-rata account and VAT in sequence, then collect the deposit by SIX QR-bill.

In the canton of Schwyz, the Studio applies a regional coefficient of +5% to the reference daywork rate, and employer contributions of 33% for structural work and 24% for the finishing trades, of which 1.65% is family allowances. Before VAT of 8.1%, your quote still has to absorb the pro-rata account, the discount and the 135 productive hours (out of 176 paid): the Studio applies these deductions in sequence and generates the QR-bill for the deposit. Collective agreement for the finishing trades to be checked: the CCT-SOR covers only French-speaking Switzerland.

Studio Devis SuisseSIA & QR-bill editor · Construction companies
CHF 0 · No account
  • A4 PDF ready to sign
  • SIX QR-bill built in
  • 100% in the browser

Free manual entry · 14’045 ACIP prices & cantons in Soumissions Pro →

Collective agreements (CLA, CN) and social charges in the canton of Schwyz

In the canton of Schwyz, structural work falls under the National Collective Agreement for the main construction industry in Switzerland (CN). For the finishing trades and the technical trades, the CCT-SOR does not in principle apply outside French-speaking Switzerland. For these occupations, the conditions of employment and pay depend on sector collective labour agreements, frequently concluded at cantonal or regional level. You should therefore enquire with the competent joint committee to confirm the wage provisions in force. Our tool applies reference profiles for structural work and the finishing trades, weighted by the regional coefficient and the cantonal social charges, as an estimate for your bid.

In the Studio, the regional coefficient applied to the base daywork rate is +5%, with Vaud as the reference at 0%. Among the 26 cantons of the reference scale, Schwyz ranks 6th, on a scale running from −7% to +15%. The employer contributions used are 33% for structural work and 24% for the finishing trades, including cantonal family allowances (1.65%, compared with 3.4% in Vaud). The other contributions (old-age insurance AVS, unemployment insurance, SUVA, occupational pension LPP, early retirement, daily sickness benefit, joint funds) are the same in every canton. In this canton the Studio applies reference profiles: the result is indicative until you have checked the collective agreement of your sector.

Charges and coefficient for the canton of Schwyz
ItemValue
Regional coefficient on the daywork rate+5%
Family allowances (CAF) of the canton1.65%
Employer contributions, structural work (CN)33%
Employer contributions, finishing trades24%
Rank among the 26 cantons (coefficient)6 /26
Daywork rates in the canton of Schwyz, structural work (CHF/h excl. VAT)
ProfileAverage gross monthly payReference base (VD)Schwyz
Foreman / site supervisor (class V)7'250 CHF122.00128.10
Experienced qualified bricklayer (class Q)6'350 CHF108.00113.40
Qualified bricklayer / recent graduate (class A)6'000 CHF102.00107.10
Skilled worker / federal certificate holder (class B)5'650 CHF96.00100.80
Labourer / site assistant (class C)5'100 CHF88.0092.40
Daywork rates in the canton of Schwyz, finishing trades (CHF/h excl. VAT)
ProfileAverage gross monthly payReference base (VD)Schwyz
Finishing trades foreman (CCT-SOR)6'750 CHF106.00111.30
Experienced qualified tradesperson (class A)6'050 CHF96.00100.80
Recently qualified tradesperson (1st to 3rd year after diploma)5'500 CHF88.0092.40
Skilled worker / federal certificate holder (class B)5'300 CHF85.0089.25
Finishing trades assistant (class C)4'850 CHF79.0082.95

How to read this table. The “Reference base (VD)” column is the Studio’s reference rate. The “Schwyz” column multiplies it by 1.05 and rounds to 5 centimes, exactly as the Studio does when you choose this canton. Gross monthly pay is the average wage for the profile.

Site realities in the canton of Schwyz

Carrying out work in this canton is best done by taking very real climatic and geographical constraints into account. High-altitude and mountain sites often require careful planning of the construction season, which is shortened by snow and frost. Steep or narrow access routes often call for logistical adjustments to bring in heavy materials and plant. At the same time, the surroundings of the large bodies of water confront structures with persistently humid air and strong wind corridors. These factors influence the drying time of mortars, the installation of façade waterproofing and the sizing of the safety measures for work at height in accordance with the SUVA requirements.

Indicative calculation for the “Experienced qualified tradesperson (class A)” profile (finishing trades): CHF 6'050 gross, plus 24% of charges and CHF 595 of monthly expenses, divided by 135 productive hours, give a cost price of CHF 59.98 per hour, before overheads and margin. The daywork rate of CHF 100.80/h therefore leaves CHF 40.82 per hour for overheads and profit.

Main towns and municipalities: construction quotes in Schwyz, Freienbach, Einsiedeln and in the canton of Schwyz

To draw up an accurate construction quote, geographical location remains a decisive factor in the real cost. Whether your teams are working on a residential or commercial project in Schwyz, Freienbach, Einsiedeln, Küssnacht or Lachen, conditions on the ground vary appreciably from one area to another. The difference in level, the altitude, ease of access for transport or unloading constraints directly influence installation rates and the transport budget. The tool sets the basic parameters at cantonal level, but it is up to you to adjust your allowances for logistics and labour to the exact municipality and the specific topography of the site.

Cost difference by town, canton of Schwyz (CHF/h excl. VAT)
TownDifference from the baseExperienced qualified tradesperson (finishing trades)Experienced qualified bricklayer (structural work)
Freienbach/Pfäffikon+8%103.70116.65

How to read this table. The difference for a town is given relative to the reference base (Vaud = 0%), like the canton’s coefficient. When your site is in one of these towns, this line applies, not the cantonal average. The other municipalities follow the canton’s coefficient.

ERP Art Construction and Soumissions Pro also apply the difference for the town of the site to the full price list.

Cascade of deductions for a quote in the canton of Schwyz

Between the subtotal of the items and the amount to collect, the Studio follows the same steps for every quote. The order matters: each deduction is calculated on the amount left by the previous one. Example with CHF 10'000 of fixed-price items and the Studio’s default settings (discount 0%, pro-rata account 1.5%, deposit 30%):

From the gross subtotal to the deposit (CHF)
StepAmount
Gross subtotal excl. VAT10'000.00
Discount (0%)0.00
Pro-rata account (1.5% after discount)− 150.00
Net total excl. VAT9'850.00
VAT 8.1%+ 797.85
Total incl. VAT (rounded to 5 centimes)10'647.85
Deposit on order (30% of the total incl. VAT)3'194.35

How to read this table. You start from the total of the fixed-price items, take away the discount granted, then the pro-rata account (the contribution to the shared costs of the site), calculated on what remains. VAT of 8.1% applies to the net amount, and the total including VAT is rounded to 5 centimes. Discount, pro-rata account, VAT and deposit percentage are set in the Studio; the deposit is printed with its QR-bill at the bottom of the last page.

The deposit is a percentage of the total including VAT, not of the net amount: the client pays the VAT with the first payment, which finances the first weeks of materials and labour without any advance on your part. The Studio rounds the deposit to 5 centimes, like the amount on the QR-bill, so that it matches the expected payment exactly.

SIA standards and QR-bill deposit in the canton of Schwyz

A quote that mentions SIA 118, a clear pricing method and a deposit payable by SIX QR-bill avoids the three most common disputes: over the conditions, over the price and over payment. The Studio prints each of these elements as sentences to tick, in the language of the quote (French, German, Italian, Romansh or English).

SIA 118 as contractual basis

Tick box (unticked by default).

SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.

Asbestos and pollutants

Ticked by default.

Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).

Rise in material prices

Ticked by default.

Reservation for increases in material prices according to the KBOB indices in force.

Pricing method

Your choice, when printing.

Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).

The QR-bill replaces the old payment slips: it carries your IBAN, the amount of the deposit and the reference of the quote, and the client pays it from their banking app without retyping anything. The Studio draws it from the same figures as the total, so the amount paid cannot differ from the quote. To go further than a one-off quote:

Frequently asked questions about quotes in the canton of Schwyz

How do I take the winter constraints in Schwyz into account when drawing up the quote?

In the higher parts of the canton, the frost period and snowfall can lead to the interruption of outdoor work. When pricing, it is advisable to state in the bid the planned dates of the work and to specify whether winter protection measures, such as watertight sheeting or temporary heating of the premises, are covered by a separate item or remain the responsibility of the client.

Which agreement applies to the finishing trades for a company coming from another canton?

As the CCT-SOR does not apply here, local or regional sector agreements that have been declared generally applicable may apply to the finishing trades. The company must comply with the working conditions customary at the place of performance. You should check these scales with the joint committee concerned in order to base the quote on compliant wage costs.

Does SIA standard 118 apply by default to contracts for work?

SIA standard 118 has no automatic legal force; it applies only if the contract or the tender mentions it explicitly. Failing that, the contractual relationship is governed by Swiss law on contracts for work, in particular the rules on the agreed price. You are strongly advised to state the reference chosen on your quote in order to define the terms of remuneration clearly.

How should the removal of soil and waste be budgeted in mountain areas?

Restricted access to some high-altitude sites limits the size of lorries and makes more transport runs necessary. In addition, the recovery or landfilling of excavated material may require long journeys. You should detail this item in the quote in the form of a precise measurement, or mention a reservation linked to the authorised local disposal routes.

Price another trade in the canton of Schwyz

Each trade has its own units and its own collective agreement: choose the trade to see the reservations and rates that go with it.

The 26 cantons

The regional coefficient ranges from −7% to +15% depending on the canton: compare before reusing a rate from a neighbouring site.

Sources and limits. Reference values of Studio Devis Suisse (as at 23.11.2026), CN and CCT-SOR collective agreements, weighted average contribution rates. Indicative only: check the rates of your compensation fund and the collective agreement that applies to your company.