Costing specifics for CFC 232: Electrical installations
CFC 232 covers the heavy-current installations of a building, including distribution boards, main cabling, lighting points, wiring accessories and the final safety inspections. Reference collective agreement in the Studio: EIT.swiss (electrical installations). The Studio’s default measurement unit is pc; the figures below are those of the Studio’s latest update, with Vaud as the starting canton.
In this trade, the usual unit remains the piece for terminal accessories, sockets, light fittings and pre-equipped boards. The linear metre applies to cable trays, conduits and the pulling of supply lines. Certain complex assemblies or specific connections are priced as a lump sum. Heavy drilling, core drilling, fire-stopping of openings and temporary site connections are counted separately in accordance with the CAN standard item catalogue (NPK). To avoid discrepancies in the final account, record the actual cable lengths precisely and have every change of route approved by site management.
| Item | Value in the Studio |
|---|---|
| CFC code | 232 |
| Title | Electrical installations |
| Reference collective agreement | EIT.swiss (electrical installations) |
| Default measurement unit | pc |
| VAT applied | 8.1% |
Items often forgotten in a quote for electrical installations
- Insulation measurements, the final inspection and the official drawing-up of the safety report
- Drilling in concrete, core drilling and fire-stopping of wall penetrations
- Temporary power supply and safety lighting during the construction phase
- Rigorous labelling of circuits and supply of the updated diagrams for the electrical cabinets
- Compliant disposal of old fluorescent tubes and of the electronic components removed
Neighbouring trades
A building site involves several trades in succession, and each line of a quote carries its own CFC code: you can therefore combine several trades in a single document. Here are the other Studio codes attached to the same cost profile, with their default unit.
| CFC | Title | Default unit | Page |
|---|---|---|---|
| 242 | Heating & heat generation | lump sum | Quote CFC 242 |
| 251 | Sanitary installations | pc | Quote CFC 251 |
SIA 118 clauses, retention and SUVA safety
SIA standard 118 governs the contractual relationship between the installer and the client, but it applies only if your contract mentions it explicitly. It governs settlement according to the actual measurements of the installation, organises the arrangements for the formal acceptance of the work and sets out the rules for notices of defects. In particular, it establishes a two-year defects notification period for demanding the correction of faults found after handover of the electrical installations.
SIA 118 as contractual basis
Tick box (unticked by default).
SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.
Asbestos and pollutants
Ticked by default.
Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).
Rise in material prices
Ticked by default.
Reservation for increases in material prices according to the KBOB indices in force.
Pricing method
Your choice, when printing.
Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).
Retention
The client often applies a retention to your monthly interim payments and to the final account to cover any defects. Our tool lets you set this retention from 0 to 10% of the value of the work excluding VAT. Depending on the terms of the contract, this sum remains blocked for the agreed guarantee period, or may be released earlier against the provision of an equivalent bank guarantee. In the Studio’s copilot, the retention (SIA 118) can be set to 0, 5 or 10% of the total incl. VAT, with 10% as the default; cash discount and retention reduce what you actually collect, whereas the discount and the pro-rata account reduce the quote itself.
Safety: what SUVA accident insurance costs
Occupational accident insurance (SUVA) is paid entirely by the employer: 2.6% of gross pay for the Building services EIT / Suissetec profile in the Studio. For an employee earning CHF 6'050 a month, that is CHF 157.30 a month at your expense, before a single hour has been worked. This premium is part of the 25% of charges that the Studio builds into your daywork rate.
Daywork and profitability: the real cost of one hour of electrical installations
The most common trap: invoicing on the basis of the hourly wage. An employee with the “Experienced qualified installer / fitter (cat. A)” profile earns CHF 6'050 a month, i.e. CHF 34.38 over 176 paid hours. Once charges of 25.8% (Vaud) and CHF 575 of monthly expenses (meals, travel, equipment) are added, and the result is divided by the 137.5 genuinely productive hours, one hour costs CHF 59.53, before overheads and margin. You pay for every hour, but you invoice only part of them.
The Studio uses 1'650 productive hours per year and per employee for this profile (137.5 hours a month out of 176 paid hours), after holidays, public holidays, absences and non-billable time.
When to invoice on a daywork basis
Daywork applies to unforeseeable interventions, to tracing complex faults, to late changes requested on site or to the connection of equipment not defined on the initial drawings. Draw up daywork sheets every day detailing the hours worked and have them signed by site management. Depending on the contract concluded, travel, small consumables and specific supplies of electrical equipment are added to the invoicing of labour.
| Profile | Average gross monthly pay | Daywork rate |
|---|---|---|
| Chief fitter, electrical / HVAC / sanitary | 6'850 CHF | 115.00 |
| Experienced qualified installer / fitter (cat. A) | 6'050 CHF | 102.00 |
| Qualified fitter (1st to 3rd year after diploma, cat. B) | 5'400 CHF | 92.00 |
| Fitter with federal certificate (electrical / sanitary / HVAC) | 5'050 CHF | 86.00 |
| Assistant fitter without certificate (cat. C) | 4'750 CHF | 80.00 |
How to read this table. Vaud is the reference canton (coefficient 0%). Gross monthly pay is the average wage for the profile; the daywork rate is the hourly rate to invoice, excluding VAT. In another canton, the daywork rate is multiplied by the regional coefficient: the “Experienced qualified installer / fitter (cat. A)” profile goes from CHF 102.00/h in Vaud to CHF 114.25/h in Geneva (+12%). See the page for the canton of Geneva.
Frequently asked questions about quotes for electrical installations (CFC 232)
How can the inspection share be priced accurately for electrical installations?
The installer’s own final inspection and the drafting of the safety report require instrument time and specialist skills. Do not bury this service in the installation prices. Price these operations under a separate item, either as a lump sum per board or per dwelling, or by allowing the time needed for the insulation measurements, the tripping tests and the compilation of the complete technical file to be handed over to the owner.
Who pays for core drilling and chases not shown on the drawings?
Major drilling and fire-rated penetrations must be defined before work starts. If site management changes the location of the cabinets or the route of the rising mains during execution, these additional openings constitute variations. Price them separately or apply daywork, making sure that the written variation order is approved before drilling into load-bearing structures.
How can changes in metal prices be passed on in my cable prices?
The cost of conductors is subject to fluctuations in metal prices. To protect your company on sites lasting several months, insert a clear reservation in your offer linking the validity of the unit price of cables to a reference index, or limit the period of validity of the quote. In the event of a late order, a revaluation thus remains justifiable under the contractual agreements.
Should the supply of light fittings be included, or only their connection?
The boundary is best defined precisely from the quote stage. If the client supplies their own light fittings, state that your offer includes only mechanical installation, electrical connection and inspection, with no guarantee whatsoever on the internal operation of a fitting supplied by a third party. Itemise separately the site lampholders or temporary light fittings that are indispensable.
From quote to site
Studio Devis Suisse is free and is enough for a one-off quote. When your quotes multiply, two tools take over where the Studio stops: the full price list to cost faster, then site tracking to check the real margin, hour after hour.
The same trade in the 26 cantons
The regional coefficient, the charges and the family allowances change from one canton to another: open the page for the canton of your site to see the daywork rate and the charges that apply there.
- Vaud (VD)
- Geneva (GE)
- Valais (VS)
- Fribourg (FR)
- Neuchâtel (NE)
- Jura (JU)
- Bern (BE)
- Zurich (ZH)
- Zug (ZG)
- Basel-Stadt (BS)
- Basel-Landschaft (BL)
- Aargau (AG)
- Solothurn (SO)
- Lucerne (LU)
- Schwyz (SZ)
- Nidwalden (NW)
- Obwalden (OW)
- Uri (UR)
- St. Gallen (SG)
- Thurgau (TG)
- Schaffhausen (SH)
- Appenzell Ausserrhoden (AR)
- Appenzell Innerrhoden (AI)
- Glarus (GL)
- Graubünden (GR)
- Ticino (TI)