Costing specifics for CFC 242: Heating & heat generation
CFC 242 covers the supply and installation of heat generators, distribution networks and heat emitters, as well as the control devices and the commissioning of the installations. Reference collective agreement in the Studio: Suissetec (heating, sanitary). The Studio’s default measurement unit is lump sum; the figures below are those of the Studio’s latest update, with Vaud as the starting canton.
For heating installations, the lump sum frequently applies to plant rooms and substations. Pipework networks are measured by the linear metre per diameter, with or without thermal insulation depending on the specification in the CAN standard item catalogue (NPK). Radiators, circulation pumps and valves are counted by the piece, while underfloor heating is generally measured by the square metre laid. Core drilling, the electrical connections of the boards and drilling should be priced separately in order to avoid any disagreement when the final account is drawn up with site management.
| Item | Value in the Studio |
|---|---|
| CFC code | 242 |
| Title | Heating & heat generation |
| Reference collective agreement | Suissetec (heating, sanitary) |
| Default measurement unit | lump sum |
| VAT applied | 8.1% |
Items often forgotten in a quote for heating
- Complete flushing of the network, initial water treatment and filling in accordance with the guidelines
- Joint commissioning with the manufacturer of the heat generator and the control settings
- Preliminary pressure tests, inspection reports and compilation of the operating files
- Thermal insulation of pipes, control valves and hydraulic distribution components
- Technical coordination for the electrical power connections and the links to the control system
Neighbouring trades
A building site involves several trades in succession, and each line of a quote carries its own CFC code: you can therefore combine several trades in a single document. Here are the other Studio codes attached to the same cost profile, with their default unit.
| CFC | Title | Default unit | Page |
|---|---|---|---|
| 232 | Electrical installations | pc | Quote CFC 232 |
| 251 | Sanitary installations | pc | Quote CFC 251 |
SIA 118 clauses, retention and SUVA safety
SIA standard 118 precisely governs the contractual relationship between the heating installer and the client, provided the contract expressly declares it applicable. It defines the formal procedure for acceptance of the work, the notification mechanism for notices of defects and the two-year defects notification period. As regards measurement, it offers a clear basis for checking the quantities actually installed against the estimates in the specification.
SIA 118 as contractual basis
Tick box (unticked by default).
SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.
Asbestos and pollutants
Ticked by default.
Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).
Rise in material prices
Ticked by default.
Reservation for increases in material prices according to the KBOB indices in force.
Pricing method
Your choice, when printing.
Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).
Retention
Depending on the requirements of site management and on the contract, a retention of 0 to 10% may be deducted from each interim payment until the final account. This sum is withheld to cover proper completion of the work in accordance with the applicable rules. The contractor can generally have this retention released by providing an equivalent bank or insurance guarantee, according to the terms agreed in the contract for work and services before payment of the balance. In the Studio’s copilot, the retention (SIA 118) can be set to 0, 5 or 10% of the total incl. VAT, with 10% as the default; cash discount and retention reduce what you actually collect, whereas the discount and the pro-rata account reduce the quote itself.
Safety: what SUVA accident insurance costs
Occupational accident insurance (SUVA) is paid entirely by the employer: 2.6% of gross pay for the Building services EIT / Suissetec profile in the Studio. For an employee earning CHF 6'050 a month, that is CHF 157.30 a month at your expense, before a single hour has been worked. This premium is part of the 25% of charges that the Studio builds into your daywork rate.
Daywork and profitability: the real cost of one hour of heating
The most common trap: invoicing on the basis of the hourly wage. An employee with the “Experienced qualified installer / fitter (cat. A)” profile earns CHF 6'050 a month, i.e. CHF 34.38 over 176 paid hours. Once charges of 25.8% (Vaud) and CHF 575 of monthly expenses (meals, travel, equipment) are added, and the result is divided by the 137.5 genuinely productive hours, one hour costs CHF 59.53, before overheads and margin. You pay for every hour, but you invoice only part of them.
The Studio uses 1'650 productive hours per year and per employee for this profile (137.5 hours a month out of 176 paid hours), after holidays, public holidays, absences and non-billable time.
When to invoice on a daywork basis
Unforeseen interventions in the boiler room, repeated bleeding caused by changes made by third parties or leak detection on existing networks are invoiced as daywork. The contractor must have the daywork sheets signed daily or weekly by site management. In addition to the hours of qualified labour, the quote and the contract must specify the invoicing of travel, specific machines and ancillary supplies.
| Profile | Average gross monthly pay | Daywork rate |
|---|---|---|
| Chief fitter, electrical / HVAC / sanitary | 6'850 CHF | 115.00 |
| Experienced qualified installer / fitter (cat. A) | 6'050 CHF | 102.00 |
| Qualified fitter (1st to 3rd year after diploma, cat. B) | 5'400 CHF | 92.00 |
| Fitter with federal certificate (electrical / sanitary / HVAC) | 5'050 CHF | 86.00 |
| Assistant fitter without certificate (cat. C) | 4'750 CHF | 80.00 |
How to read this table. Vaud is the reference canton (coefficient 0%). Gross monthly pay is the average wage for the profile; the daywork rate is the hourly rate to invoice, excluding VAT. In another canton, the daywork rate is multiplied by the regional coefficient: the “Experienced qualified installer / fitter (cat. A)” profile goes from CHF 102.00/h in Vaud to CHF 114.25/h in Geneva (+12%). See the page for the canton of Geneva.
Frequently asked questions about quotes for heating (CFC 242)
How can the pricing of a complete boiler room be made secure in heating and heat generation?
The services included in the lump sum for the plant room should be clearly delimited. Itemise the hydraulic integration, the connection of the manifolds, the installation of the expansion vessels and the control wiring. State in writing that the upstream electrical connections, concrete plinths and slab penetrations, which belong to other trades, are excluded, so as to avoid taking on unbudgeted finishing-trade work.
Which sector agreement should be applied to assess installation labour?
The installer refers to the provisions of the collective labour agreement for the installers’ sector, supported in particular by Suissetec. This agreement governs the working framework, the qualifications and the social charges of installation staff. It is useful to check that the scales applied are consistent with the regional joint recommendations when setting hourly rates.
How should hydraulic balancing and test reports be priced?
Balancing a distribution network generally requires qualified technician time and verified measuring instruments. Provide for this item as a lump sum per riser or per floor manifold, including the drawing-up of written reports. Showing these services separately reassures the client about the conformity of the installation and protects your margin in the final phases of the site.
What precautions should be taken for pipes concealed in a slab or a duct?
Embedded pipes require rigorous pressure tests before the screeds are poured or the service ducts are closed. State in the offer that the joint presence of site management is required when the system is pressurised. Also provide a detailed measurement for the protective sleeves and the compliant marking of the networks before they are covered.
From quote to site
Studio Devis Suisse is free and is enough for a one-off quote. When your quotes multiply, two tools take over where the Studio stops: the full price list to cost faster, then site tracking to check the real margin, hour after hour.
The same trade in the 26 cantons
The regional coefficient, the charges and the family allowances change from one canton to another: open the page for the canton of your site to see the daywork rate and the charges that apply there.
- Vaud (VD)
- Geneva (GE)
- Valais (VS)
- Fribourg (FR)
- Neuchâtel (NE)
- Jura (JU)
- Bern (BE)
- Zurich (ZH)
- Zug (ZG)
- Basel-Stadt (BS)
- Basel-Landschaft (BL)
- Aargau (AG)
- Solothurn (SO)
- Lucerne (LU)
- Schwyz (SZ)
- Nidwalden (NW)
- Obwalden (OW)
- Uri (UR)
- St. Gallen (SG)
- Thurgau (TG)
- Schaffhausen (SH)
- Appenzell Ausserrhoden (AR)
- Appenzell Innerrhoden (AI)
- Glarus (GL)
- Graubünden (GR)
- Ticino (TI)