Costing specifics for CFC 251: Sanitary installations
CFC 251 covers the installation of sanitary appliances, taps and fittings, supply and drainage pipes, as well as leak tests, balancing and the complete commissioning of the networks. Reference collective agreement in the Studio: Suissetec (heating, sanitary). The Studio’s default measurement unit is pc; the figures below are those of the Studio’s latest update, with Vaud as the starting canton.
In sanitary installations, appliances, valves and mounting frames are counted by the piece in accordance with the CAN standard item catalogue (NPK), while distribution or drainage pipes are measured by the linear metre. Special drilling, thermal or acoustic insulation of pipework and connection to the main collectors will often be measured separately or as a lump sum. To avoid disputes over the final account, record the actual route of the service ducts precisely and have the extras approved by site management as soon as a route differs from the initial drawings.
| Item | Value in the Studio |
|---|---|
| CFC code | 251 |
| Title | Sanitary installations |
| Reference collective agreement | Suissetec (heating, sanitary) |
| Default measurement unit | pc |
| VAT applied | 8.1% |
Items often forgotten in a quote for sanitary installations
- Preliminary pressure tests and disinfection of the drinking-water network
- Reinforced acoustic insulation of soil stacks passing through sensitive rooms
- Supply and application of silicone joints around the sanitary appliances
- Temporary connection for the client’s site water supply
- Final removal and recycling of the old appliances in a renovation
Neighbouring trades
A building site involves several trades in succession, and each line of a quote carries its own CFC code: you can therefore combine several trades in a single document. Here are the other Studio codes attached to the same cost profile, with their default unit.
| CFC | Title | Default unit | Page |
|---|---|---|---|
| 232 | Electrical installations | pc | Quote CFC 232 |
| 242 | Heating & heat generation | lump sum | Quote CFC 242 |
SIA 118 clauses, retention and SUVA safety
SIA standard 118 governs the measurement rules for sanitary networks and defines the formal procedure for acceptance of the work with site management. It establishes a two-year defects notification period during which the contractor is liable for the notices of defects reported. This standard protects payment for the services performed, but it applies only if your contract for work and services or your quote expressly declares it applicable between the parties.
SIA 118 as contractual basis
Tick box (unticked by default).
SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.
Asbestos and pollutants
Ticked by default.
Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).
Rise in material prices
Ticked by default.
Reservation for increases in material prices according to the KBOB indices in force.
Pricing method
Your choice, when printing.
Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).
Retention
On sanitary sites, the client often applies a retention to your periodic interim payments. Studio Devis Suisse lets you set this retention from 0 to 10% according to the agreed terms. This sum withheld from the final account is released on the agreed date or may be replaced by an equivalent bank or insurance guarantee if the contractual clauses so provide. In the Studio’s copilot, the retention (SIA 118) can be set to 0, 5 or 10% of the total incl. VAT, with 10% as the default; cash discount and retention reduce what you actually collect, whereas the discount and the pro-rata account reduce the quote itself.
Safety: what SUVA accident insurance costs
Occupational accident insurance (SUVA) is paid entirely by the employer: 2.6% of gross pay for the Building services EIT / Suissetec profile in the Studio. For an employee earning CHF 6'050 a month, that is CHF 157.30 a month at your expense, before a single hour has been worked. This premium is part of the 25% of charges that the Studio builds into your daywork rate.
Daywork and profitability: the real cost of one hour of sanitary installations
The most common trap: invoicing on the basis of the hourly wage. An employee with the “Experienced qualified installer / fitter (cat. A)” profile earns CHF 6'050 a month, i.e. CHF 34.38 over 176 paid hours. Once charges of 25.8% (Vaud) and CHF 575 of monthly expenses (meals, travel, equipment) are added, and the result is divided by the 137.5 genuinely productive hours, one hour costs CHF 59.53, before overheads and margin. You pay for every hour, but you invoice only part of them.
The Studio uses 1'650 productive hours per year and per employee for this profile (137.5 hours a month out of 176 paid hours), after holidays, public holidays, absences and non-billable time.
When to invoice on a daywork basis
Unforeseen work such as tracing a leak on an existing pipe, the occasional diversion of unrecorded pipes or urgent repairs is invoiced as daywork. Write up your daywork sheets every day, stating the installers’ hours, the specific tools, the travel and the supplies used. It is strongly advisable to have these sheets signed by site management in order to make it easier for them to be taken into account in the final account.
| Profile | Average gross monthly pay | Daywork rate |
|---|---|---|
| Chief fitter, electrical / HVAC / sanitary | 6'850 CHF | 115.00 |
| Experienced qualified installer / fitter (cat. A) | 6'050 CHF | 102.00 |
| Qualified fitter (1st to 3rd year after diploma, cat. B) | 5'400 CHF | 92.00 |
| Fitter with federal certificate (electrical / sanitary / HVAC) | 5'050 CHF | 86.00 |
| Assistant fitter without certificate (cat. C) | 4'750 CHF | 80.00 |
How to read this table. Vaud is the reference canton (coefficient 0%). Gross monthly pay is the average wage for the profile; the daywork rate is the hourly rate to invoice, excluding VAT. In another canton, the daywork rate is multiplied by the regional coefficient: the “Experienced qualified installer / fitter (cat. A)” profile goes from CHF 102.00/h in Vaud to CHF 114.25/h in Geneva (+12%). See the page for the canton of Geneva.
Frequently asked questions about quotes for sanitary installations (CFC 251)
How can installation times for CFC 251 be estimated in a complete renovation?
In a renovation, the age of the existing pipes and the access constraints in the service ducts increase the labour hours compared with new build. Sufficient time should be allowed for careful dismantling, draining of the stacks and adaptation to the connections that are retained. Check the applicable sector agreement so that your real hourly parameters are correctly built in when pricing each appliance.
What should be done when the client supplies the taps and fittings themselves?
If the client buys certain appliances, you lose your margin on the supply and retain responsibility for the installation. Itemise in your offer an installation service as a lump sum or per piece, including visual inspection of the parts supplied, adaptor fittings and leak tests. State in writing that the guarantee of operation of the equipment lies with the supplier chosen by the customer.
How should drilling and core drilling in load-bearing structures be priced?
Core drilling in reinforced concrete or heavy masonry requires specialist tools and approval by the civil engineer. If the contract does not allocate this work to structural work, price it per piece according to the diameter and the thickness of the wall, or provide for the use of a specialist subcontractor. State clearly in the quote whether removal of the drilling cores is included.
Which services should be planned for commissioning the installation?
The end of the site is not limited to fitting the traps. Provide for flushing of the pipes, hydrostatic pressure checks, adjustment of the thermostatic mixers and balancing of the domestic hot water circulation loop. Drawing up the revised as-built diagrams and handing over the maintenance instructions to site management are also tasks to be valued in your quote.
From quote to site
Studio Devis Suisse is free and is enough for a one-off quote. When your quotes multiply, two tools take over where the Studio stops: the full price list to cost faster, then site tracking to check the real margin, hour after hour.
The same trade in the 26 cantons
The regional coefficient, the charges and the family allowances change from one canton to another: open the page for the canton of your site to see the daywork rate and the charges that apply there.
- Vaud (VD)
- Geneva (GE)
- Valais (VS)
- Fribourg (FR)
- Neuchâtel (NE)
- Jura (JU)
- Bern (BE)
- Zurich (ZH)
- Zug (ZG)
- Basel-Stadt (BS)
- Basel-Landschaft (BL)
- Aargau (AG)
- Solothurn (SO)
- Lucerne (LU)
- Schwyz (SZ)
- Nidwalden (NW)
- Obwalden (OW)
- Uri (UR)
- St. Gallen (SG)
- Thurgau (TG)
- Schaffhausen (SH)
- Appenzell Ausserrhoden (AR)
- Appenzell Innerrhoden (AI)
- Glarus (GL)
- Graubünden (GR)
- Ticino (TI)