Free software · 100% in your browser · no data sent

Heat pump and solar in Appenzell Ausserrhoden: OPB noise and procedure

An air/water heat pump too close to a neighbouring window can block a project in Appenzell Ausserrhoden: check the noise margin before choosing the location.

Open the free studio →

Free, no account: your data stays in your browser. Indicative results, to be confirmed by the installer and the cantonal office.

Appenzell Ausserrhoden regulates energy through its energy act of 24 September 2001 and its implementing ordinance (Energieverordnung, kEnV, of 18 December 2001). An air/water heat pump is a fixed installation under federal noise protection law: a 2024 Federal Supreme Court ruling (1C_83/2024) concerns precisely a heat pump approval in this canton, challenged on noise grounds, with an assessment covering the nearest neighbouring building. The exact procedure (permit or notification) should be checked with the municipality and the environment office (Amt für Umwelt). For solar, the canton publishes a guide (Leitfaden Solaranlagen, 2024) that recalls the federal simplification of Art. 18a LAT.

The heat pump, noise and solar studio uses the St. Gallen station (670 m, θe,norm −10 °C), the closest to the canton. It calculates the output from gas consumption, the night-time rating level at the neighbour according to Cercle Bruit and the effect of an acoustic enclosure, then the solar yield. The canton's funding programme is not built in: enter the amount read on the current programme, whose application is as a rule submitted before work starts.

Worked example: heat pump 6 m from a neighbouring window, with and without an enclosure

A house heated with gas, 25,000 kWh (gross calorific value) per year on the bill, non-condensing boiler, hot water not produced by the heat pump. St. Gallen station. Unit against the façade, 6 m from the neighbour's bedroom window, residential zone with sensitivity level II (example value), night-time sound power level of 55 dB(A) according to the chosen data sheet.

Output, night-time noise with and without enclosure (example values)
QuantityInputStudio calculationResult
Current useful heat25,000 kWh GCV of gas25,000 × 0.9 × 0.8819,800 kWh/yr
Heat pump output2,100 h (heating only)19,800 ÷ 2,1009.43 kW
Lr night without enclosureLWA 55, façade, 6 m55 − 11 + 6 − 15.56 + 1246.4 dB(A)
Lr night with a 4 dB enclosuresame position46.44 − 442.4 dB(A)
Planning value DS II, nightOPB, annex 6comparison45 dB(A)
Photovoltaic yield8 kWp, south 30°8 × 1,150 × 1.12 × 0.848,655 kWh/yr

The bill of 25,000 kWh GCV of gas becomes 22,500 kWh net calorific value (factor 0.9), then 19,800 kWh of useful heat with the default efficiency of 0.88. Over 2,100 full-load hours, without hot water, the heat pump must deliver 9.43 kW. For noise, 55 dB(A) minus 11 dB, plus 6 dB for the façade, minus 20 × log10(6) = 15.56 dB give 34.4 dB(A); with K1 = 10 and K2 = 2, the rating level reaches 46.4 dB(A), i.e. 1.4 dB above the planning value of 45 dB(A): red status.

An enclosure attenuating 4 dB brings the level down to 42.4 dB(A). The margin is then only 2.6 dB: the studio shows orange status, because the precautionary principle calls for going further when reasonable. Moving the unit 2 m away or choosing a quieter model gives a more solid margin. The 8 kWp facing south produce about 8,655 kWh per year.

At 6 m, the heat pump exceeds the 45 dB(A) value by 1.4 dB; a 4 dB enclosure brings it to 42.4 dB(A), with a margin still too short to be safe.

3 common pitfalls in Appenzell Ausserrhoden

Calculating noise at the wrong receiver

The assessment must target the windows of the neighbours' noise-sensitive rooms (bedrooms, living rooms), not only the nearest building. Place every exposed window in the studio and keep the least favourable one.

Counting on the enclosure to solve everything

An enclosure reduces noise by a few decibels, but beyond 10 dB of cumulative attenuation the studio asks for justification. Start with the location and the choice of unit.

Installing panels without checking protection

The federal notification regime does not apply to cultural heritage or protected sites, which are numerous in Appenzell villages. Check with the municipality whether the house or site is protected before ordering the installation.

Using the studio in 3 steps in Appenzell Ausserrhoden

  1. Enter the gas bill
    Choose the St. Gallen station, adjust the altitude, then enter the gas consumption in kWh GCV from the bill and the condition of the boiler. The studio derives the output and the heat pump model.
  2. Test several locations
    Place the unit, the façade and all exposed neighbouring windows. Move the unit, change the directivity and add an enclosure until you reach green with at least 3 dB of margin.
  3. Complete with solar
    Add the photovoltaic output and your consumption, enter the cantonal subsidy, then print the sheet and plan for the discussion with the municipality.

Open the free studio →

What the free version does not do

The studio submits nothing and replaces neither the official noise assessment nor the authority's opinion. It has no station in the canton and does not include its subsidy programme. It does not know the sensitivity level of the plot. See also the noise calculator page, the Pronovo simulator and the subsidy simulator by canton.

With Soumissions, the heat pump and solar go into the quotation; the ERP tracks hours, purchases and invoicing; Portail chantier files the assessment and exchanges with the client. The Geo-Scanner page for Appenzell Ausserrhoden locates the plot.

Frequently asked questions

Is an air/water heat pump subject to noise law?

Yes: it is a fixed installation under the federal Environmental Protection Act. A new heat pump must respect the OPB planning values and the precautionary principle.

Is a permit needed in Appenzell Ausserrhoden?

The procedure should be checked with the municipality and the environment office. The case decided by the Federal Supreme Court in 2024 concerned a building permit granted for a heat pump in this canton.

What does the studio's orange status mean?

The level respects the planning value, but with less than 3 dB of margin. The precautionary principle invites further noise reduction if technically and economically acceptable.

Must rooftop solar be notified?

As a rule yes, under Art. 18a LAT, except cultural heritage and protected sites, which require a permit. The 2024 cantonal solar guide sets out the practice.