The canton of Solothurn regulates energy through its energy act (Energiegesetz, EnG, BGS 941.21) and its ordinance (EnVSO, BGS 941.22); the cantonal parliament adopted a complete revision of the act on 3 July 2024, and the version in force is to be checked in the cantonal statute book. For air-to-water heat pumps, the environment office refers to the online noise certificate and recalls the precautionary principle. An amendment of the cantonal building ordinance (KBV) introduced a notification to the building authority for units placed entirely indoors, with the usual documents including the noise certificate; the lead time before work begins is to be checked in the text in force. An outdoor unit remains in principle subject to a permit.
For rooftop solar, the canton publishes a notification form based on § 3bis KBV, and the structure plan requires the notification to reach the authority at least 30 days before work begins. The Art Construction heat pump, noise and solar studio prepares both parts in your browser, with the nearest reference station (385 m, θe,norm −9 °C) or a free entry.
Worked example: replacing direct electric heating in Solothurn
A house heated with direct electric heating, heating consumption of 15,000 kWh per year, new underfloor heating planned, in a residential zone with noise sensitivity level II. The unit stands in free field in the garden, 10 m from the neighbour’s window. The studio’s nearest station: 385 m, −9 °C, 1,150 kWh/m². Example values.
| Item | Input | Calculation | Result |
|---|---|---|---|
| Heating electricity | 15,000 kWh per year | 15,000 × 1.0 ÷ 2,300 h | 6.52 kW |
| Output to guarantee at −7 °C (floor 35 °C) | θe −9 °C | 6.52 × 27 ÷ 29 | 6.07 kW |
| Template selected by the studio | outdoor air-to-water | 7.8 kW at 35 °C | night LWA 49 dB(A) |
| Night-time rating level, free field | 10 m | 49 − 11 + 3 − 20 + 12 | Lr 33.0 dB(A) for VP 45 |
| Photovoltaics south 30° | 27 modules, 12.15 kWp | 12.15 × 1,150 × 1.12 × 0.84 | 13,145 kWh per year |
For direct electric heating, the efficiency used is 1: 15,000 kWh ÷ 2,300 hours (lowland, hot water included) = 6.52 kW, or 6.07 kW to guarantee under the −7 °C test conditions (6.52 × 27 ÷ 29). The 7.8 kW template at 35 °C is suitable. In free field, directivity adds 3 dB; at 10 m, distance subtracts 20 dB: Leq = 21.0 dB(A), and with night K1 and K2, Lr = 33.0 dB(A).
The 12 dB margin below the 45 dB(A) planning value is wide. Note: the studio warns that a free-field position less than 3 m from a façade distorts the calculation. The solar system produces 12.15 × 1,150 × 1.12 × 0.84 = 13,145 kWh per year, part of which covers the heat pump. Switching from direct electric heating to a heat pump also requires a hot-water distribution network, to be costed separately.
A 7.8 kW unit placed in the garden stays 12 dB below the night-time planning value.
3 common mistakes before installing a heat pump in Solothurn
Confusing the indoor-unit notification with an exemption
The cantonal notification covers units placed entirely indoors and requires the same documents as a permit, including the noise certificate. An outdoor unit in principle follows the permit procedure.
Sending the solar notification too late
The structure plan requires the notification to reach the authority at least 30 days before work begins. Use the cantonal form in force and respect this lead time.
Forgetting the heat distribution
Direct electric heating has no water radiators. The heat pump needs underfloor heating or radiators: the studio sizes the unit, not this network.
How to use it in 3 steps for a house in Solothurn
- Enter the electricity consumption
Choose electric heating as the current fuel and enter the heating consumption, then the type of heat emitters planned (35 °C or 55 °C). - Place the unit and the neighbours
Place the unit in the garden, in free field more than 3 m from any façade, and each neighbouring window with its sensitivity level. Read the night Lr and the margin. - Prepare the solar notification
Enter the modules and the orientation, note the output and the yield for the notification form, and print the studio sheet for your file.
What the free studio does not do in Solothurn
The studio submits no notification, no permit and no subsidy application, and it does not replace the official noise certificate. It does not know the sensitivity level of the plot and includes no Solothurn scale: enter the amount published by the canton, and submit the application before work begins. The Geo-Scanner page for Solothurn helps you read the plot’s zone.
Portail chantier files the notification, the certificate and the sheets by site. Soumissions takes the output and the quantities into your bid; the Art Construction ERP tracks the installation, the hours and the invoicing.
Frequently asked questions
Does an indoor heat pump need a permit in Solothurn?
An amendment of the cantonal building ordinance introduced a notification for units placed entirely indoors. The lead time and the documents are to be checked in the text in force.
Which energy act applies?
The energy act (EnG, BGS 941.21) and its ordinance (EnVSO, BGS 941.22). A complete revision was adopted in 2024: check the version in force in the cantonal statute book.
What is the lead time for notifying solar panels?
The cantonal structure plan requires the notification to reach the authority at least 30 days before work begins. The notification form is available from the canton and the municipality.
Does the studio calculate Solothurn subsidies?
No. It estimates the federal Pronovo one-off payment but includes no scale for Solothurn: enter the amount from the programme in force.