Air-to-water heat pump and solar in the canton of Uri: procedure, OPB noise and the energy act

In the valleys of Uri, houses often stand close together: the noise of a heat pump at the neighbour’s is decided by a few metres and by reflection from the walls.

Open the free studio →

Free, no account: your data stays in your browser. Indicative results, to be confirmed by the installer and the cantonal office.

The canton of Uri applies its energy act (Energiegesetz des Kantons Uri, RB 40.7211) and its energy ordinance (RB 40.7213); a revision of the act was accepted by popular vote on 22 October 2023, and its date of entry into force is to be checked in the cantonal statute book. The canton supports geothermal probes and groundwater heat pumps while protecting groundwater, and publishes an annual energy support programme. For noise, the requirements of the federal Noise Abatement Ordinance apply to any new air-to-water heat pump; cantonal responsibilities for noise are set out in the cantonal environment act. We found no official source stating whether an outdoor heat pump is installed by notification or by permit in the canton: check with the municipality and the cantonal environment office.

The Art Construction heat pump, noise and solar studio has no Uri station: it offers the nearest reference station (440 m, θe = −8 °C, irradiation of 1,150 kWh/m²). For a higher valley, enter the real altitude and the local design temperature under SIA 384/201. Tab 1 sizes the heat pump, tab 2 calculates Lr at the neighbours’ with the Cercle Bruit method, reflections included, and tab 3 estimates photovoltaic yield, self-consumption and the Pronovo one-off payment. The studio has no Uri scale: enter the verified subsidy amount.

Worked example: a 1990s house switching to an air-to-water heat pump in Uri

A house with 160 m² of energy reference area, replaced windows, four occupants, at 440 m (the studio’s nearest station, θe = −8 °C). Unit placed in an inside corner between two walls, neighbour’s window at 12 m, mixed zone with sensitivity level III. Example values.

Output, night noise and solar calculated with the studio’s formulas (example values)
ItemValueCalculation
Output from the area9.60 kW160 × 55 ÷ 1,000 × 28 ÷ 28 + 4 × 0.20
Output brought back to −7 °C9.26 kW9.60 × 27 ÷ 28
Night Lr at 12 m, inside corner43.4 dB(A)55 − 11 + 9 − 21.6 + 10 + 2
Night planning value, level III50 dB(A)OPB, Annex 6
Solar yield, 7 kWp south 30°7,573 kWh/year7 × 1,150 × 1.12 × 0.84

Without bills, the output is based on the area: 160 m² × 55 W/m² (the default load of a house from 1980 to 2000 with replaced windows, at −8 °C) gives 8.8 kW; since the station is itself at −8 °C, the temperature correction equals 1. Hot water adds 0.20 kW per occupant: 9.60 kW. Brought back to the −7 °C point of the data sheets, the required output is 9.26 kW.

In an inside corner, the unit benefits from two reflecting walls: +9 dB in the studio. With a night LWA of 55 dB(A) and 12 m to the neighbour’s window (20 × log 12 = 21.6 dB), Leq = 31.4 dB(A) and Lr = 43.4 dB(A), below the level III night-time planning value of 50 dB(A). In level II, the 45 dB(A) limit would leave only a 1.6 dB margin: the plot’s sensitivity level decides. On the roof, 7 kWp facing due south produce 7,573 kWh per year.

In sensitivity level III, the unit in the inside corner stays 6.6 dB below the night value; in level II, the margin would fall to 1.6 dB and an enclosure or another position would become useful.

3 common mistakes with a heat pump or solar in Uri

Keeping the lowland station temperature

The station offered is at 440 m. In a valley at 900 or 1,200 m, the design temperature is lower and the studio uses more full-load hours above 800 m: enter the real altitude so as not to undersize the unit.

Ignoring reflection from the walls

Between two walls, the level rises by 6 dB compared with a free-standing installation. In a tight village, test the façade, the garden and the corner before ordering the connections.

Assuming the procedure without checking

We found no published cantonal rule setting notification or permit for an outdoor heat pump. Ask the municipality and submit the support application before work begins if the programme requires it.

How to use it in 3 steps for a project in Uri

  1. Correct the location and enter the demand
    Choose the nearest station, then adjust the altitude and the design temperature to your valley; enter the current consumption or the energy reference area and the condition of the envelope.
  2. Test the positions
    Place the unit and the neighbours’ windows, enter the municipal sensitivity level and the night LWA, and compare corner, façade and free-field propagation, with or without an enclosure.
  3. Add the solar system and print
    Add the photovoltaic array, enter the verified cantonal subsidy amount and print the sheet for the municipality and the installer.

Open the free studio →

What the free studio does not do for a project in Uri

The studio submits no notification, permit application or subsidy application and does not replace the signed noise certificate. It has neither a station nor a scale for Uri and does not know the sensitivity level of the plot. For a geothermal probe, the water protection authorisation still has to be requested from the canton.

With Soumissions, the unit, the enclosure and the solar array become bid items with the price database. The ERP tracks the installation, the hours and the invoicing, and Portail chantier files the application, the certificate and the photos by site.

Frequently asked questions

Which Uri law applies to energy?

The energy act of the canton of Uri (RB 40.7211) and the energy ordinance (RB 40.7213). The revision accepted by popular vote on 22 October 2023 must be checked in the cantonal statute book for its date of entry into force.

Does an outdoor air-to-water heat pump need a permit in Uri?

We found no published cantonal rule that says so. The noise must comply with the OPB in every case; ask the municipality and the cantonal environment office.

Why does the sensitivity level change everything?

Because the night-time planning value goes from 45 dB(A) in level II to 50 dB(A) in level III. The level is shown in the municipal zoning plan; the studio does not know it.

Does the studio calculate Uri subsidies?

No: it has no scale for Uri. Enter the amount verified in the year’s cantonal support programme; the studio adds the Pronovo one-off payment to it.