Appenzell Innerrhoden regulates energy through its energy act (Energiegesetz, EnerG) and entrusts its implementation to the building and energy office (Amt für Hochbau und Energie). The cantonal application form for heat generation systems requires, for an air/water heat pump, a noise assessment, the data sheet and a site plan; the published version dates from 2020 and the version in force should be checked with the office. Each year the canton publishes an Energy funding programme: the applicable rates and conditions are those published when the application is submitted, and the application is as a rule submitted before work starts. Rooftop solar follows the notification regime of Art. 18a LAT; the form of notification should be checked with the competent district authority.
The heat pump, noise and solar studio has no reference station in the canton: use the nearest one, St. Gallen (670 m, θe,norm −10 °C), and adjust the altitude. It calculates the output from the floor area and condition of the building, the night-time noise level at the neighbour using the Cercle Bruit method, and the photovoltaic yield. No Appenzell Innerrhoden subsidy scale is built in: enter the amount read on the cantonal programme.
Worked example: heat pump for a renovated farmhouse and 12 kWp facing east and west
A former farmhouse converted into a dwelling, 160 m² of energy reference area, uninsulated envelope (before 1980), four occupants and hot water produced by the heat pump. St. Gallen station (θe,norm −10 °C, irradiation 1,150 kWh/m² per year). Outdoor unit in an inside corner, 10 m from the neighbour's window, mixed zone with sensitivity level III (example value).
| Quantity | Input | Studio calculation | Result |
|---|---|---|---|
| Heating load at θe | 160 m², 75 W/m² at −8 °C | 160 × 75 ÷ 1,000 × 30 ÷ 28 | 12.86 kW |
| Hot water | 4 occupants × 0.2 kW | 4 × 0.2 | 0.80 kW |
| Heat pump output | sum | 12.86 + 0.80 | 13.66 kW |
| Night-time rating level Lr | LWA 52 dB(A), corner, 10 m | 52 − 11 + 9 − 20 + 12 | 42.0 dB(A) |
| Planning value DS III, night | OPB, annex 6 | comparison | 50 dB(A), margin 8.0 dB |
| Photovoltaic yield | 12 kWp, east-west 15° | 12 × 1,150 × 0.96 × 0.84 | 11,128 kWh/yr |
The studio starts from a specific load of 75 W/m² at −8 °C for an old uninsulated building and corrects it for the design temperature: 160 × 75 ÷ 1,000 × (20 − (−10)) ÷ 28 = 12.86 kW, plus 0.2 kW per occupant for hot water, i.e. 13.66 kW. For noise, 52 dB(A) at night, minus 11 dB, plus 9 dB for the inside corner, minus 20 × log10(10) = 20 dB, give an Leq of 30 dB(A); with K1 = 10 and K2 = 2, the rating level reaches 42 dB(A).
For sensitivity level III, the night-time planning value is 50 dB(A): the margin of 8 dB remains comfortable. The 12 kWp installed east and west at 15° produce about 11,128 kWh per year with the default orientation factor of 0.96. Before ordering a 14 kW unit, insulating the roof would reduce the output required: the studio lets you compare the two envelope conditions.
Without insulation, the farmhouse needs a heat pump of about 13.7 kW; placed in the corner 10 m away, it stays at 42 dB(A) at night, below the 50 dB(A) of level III.
3 common pitfalls in Appenzell Innerrhoden
Sizing on a station that is too low
Houses in the canton are often higher than the St. Gallen station. Above 800 m, the studio counts more full-load hours per year; correct the altitude and design temperature with the installer instead of keeping the station as it is.
Forgetting the noise assessment in the application
The cantonal form for heat generation systems requires a noise assessment for an air/water heat pump. An application without this document comes back incomplete and delays the job.
Relying on an old subsidy rate
The Energy programme may be adapted by the cantonal government during the year. Only the conditions published when the application is submitted count: reread the current programme rather than a leaflet from a previous year.
Using the studio in 3 steps in Appenzell Innerrhoden
- Correct the location
Choose the St. Gallen station, then enter the real altitude of the house and the design temperature confirmed by the installer. Enter the energy reference area and the condition of the envelope. - Check the night-time noise
Place the unit, nearby walls and the neighbouring window. Compare a single façade and a corner, and test an enclosure or silent mode to keep at least 3 dB of margin below the planning value. - Prepare the application
Add solar, enter the cantonal subsidy yourself, then print the sheet and export the plan. Enclose these documents with the cantonal form and the official noise assessment.
What the free version does not do
The studio submits no application and replaces neither the official noise assessment nor the installer's calculation. It has no station in the canton and no subsidy scale for Appenzell Innerrhoden. It does not know the sensitivity level of the plot, which is read in the zoning plan. See also the noise calculator page and the subsidy simulator by canton.
With Soumissions, the output and quantities go into the quotation; the ERP tracks the site, hours and invoicing; Portail chantier files the assessment, the application and the data sheets for the client. The Geo-Scanner page for Appenzell Innerrhoden locates the plot and its PLR cadastre (ÖREB).
Frequently asked questions
Which law applies to a heat pump in Appenzell Innerrhoden?
The cantonal energy act (EnerG) and its implementing guidelines, plus federal noise law (OPB). The building and energy office provides information on the procedure in force.
Is a noise assessment required?
Yes for an air/water heat pump: the cantonal application form mentions it together with the data sheet and the site plan. Check the current version of the form with the office.
When should the subsidy application be submitted?
As a rule before work starts. Rates and conditions are those of the Energy programme published at the time of submission; the canton may adapt them during the year.
Does the studio know the altitude of my house?
No: it proposes the nearest station, St. Gallen, and lets you enter the altitude and design temperature. Above 800 m, it counts more full-load hours.