Free software · 100% in your browser · no data sent

Installing an air/water heat pump and solar in Geneva: OPB noise, approval and energy act

Before installing an outdoor heat pump or solar panels in Geneva, check the noise at the neighbour, the approval procedure and the framework of the energy act.

Open the free studio →

Free, no account: your data stays in your browser. Indicative results, to be confirmed by the installer and the cantonal office.

In Geneva, an outdoor air/water heat pump falls under two sets of rules at once. The energy act (LEn, rs/GE L 2 30) and its implementing regulation (REn) set the energy framework, under the responsibility of the cantonal energy office (OCEN). Noise falls under the federal Noise Abatement Ordinance (OPB): the air, noise and non-ionising radiation office (SABRA) asks for the precautionary principle and compliance with planning values to be checked, using the method of Cercle Bruit implementation guide 6.21. A building approval application generally goes through the building approval office, with the opinions of the services concerned. A revision of the LEn (bill 13446) has relaxed certain cases, in particular units installed inside an existing building in a building zone: the exact scope for an outdoor unit should be checked with the OCEN before submitting.

Art Construction's heat pump, noise and solar studio prepares this technical file in your browser. It sizes the unit according to SIA 384/201 from your current consumption or the floor area, places the unit and the neighbouring windows on a plan, calculates the day and night rating level Lr with the Cercle Bruit method and compares it with the planning value of the chosen sensitivity level. It also estimates photovoltaic yield and self-consumption. Geneva is one of the cantons for which the studio contains an indicative subsidy scale, to be checked on the official portal.

Worked example: air/water heat pump and solar panels on a house in Geneva

A detached house in the canton heated with gas, non-condensing boiler, with radiators. Studio reference station for the canton: 411 m altitude, design temperature −7 °C, global irradiation 1,250 kWh/m² per year. The outdoor unit is placed against the façade, 7 m from the neighbour's nearest bedroom window, in a zone with sensitivity level II (example value: the real level is set by the zoning plan). All values are example values.

Heat pump, noise and solar: Geneva example (example values)
StepInputCalculationResult
Heat demand18,000 kWh of gas (GCV), efficiency 0.8818,000 × 0.9 × 0.88 ÷ 2,300 h6.20 kW
Unit selectedoutdoor air/water, radiators 55 °Csmallest model covering 6.20 kW8 kW model (7.1 kW at 55 °C)
Night-time noiseLWA 49 dB(A), façade, 7 m49 − 11 + 6 − 16.9 + 10 + 2Lr = 39.1 dB(A)
OPB comparisonDS II, nightplanning value 45 dB(A)margin of 5.9 dB
Solar8 kWp, south 30°8 × 1,250 × 1.12 × 0.849,408 kWh per year

Gas billed in kWh GCV is converted to net calorific value (× 0.9), then multiplied by the boiler efficiency (0.88): 14,256 kWh of useful heat. Divided by 2,300 equivalent hours (heating and hot water in the lowlands), this gives 6.20 kW. The studio selects the 8 kW air/water model, which delivers 7.1 kW at 55 °C. For noise, it applies the formula of guide 6.21: night-time sound power level 49 dB(A), minus 11, plus 6 dB for a unit against a façade, minus 20 × log(7) = 16.9 dB, plus the night-time level corrections K1 (10) and K2 (2): Lr = 39.1 dB(A).

With a 5.9 dB margin below the 45 dB(A) night value, the status is green; a margin of less than 3 dB would have triggered the orange precautionary alert. For solar, 8 kWp facing due south at 30° produce about 9,408 kWh per year with the orientation factor (1.12) and the default performance ratio (0.84). These figures prepare the file; the official noise form and the manufacturer's data sheet prevail.

An 8 kW unit placed against the façade 7 m from the neighbouring window stays at 39.1 dB(A) at night, below the planning value of 45 dB(A) for DS II.

3 common mistakes for a heat pump and solar in Geneva

Using daytime noise instead of night-time noise

The night-time planning value is 10 dB lower than the daytime one, and the night-time K1 correction is higher. A unit that passes during the day can exceed at night: check the night period with the night-time sound power level from the manufacturer's data sheet.

Pushing the unit into an inside corner

A corner formed by two walls adds 9 dB instead of 6 dB against a single façade. Moving the unit a few metres or away from the neighbouring window often achieves more than an expensive acoustic enclosure.

Starting work before the subsidy decision

Geneva energy subsidies are applied for before work starts, with OCEN validation. An order signed or a unit installed too early may lose the subsidy: check the current conditions on the official portal.

Using the studio in 3 steps: heat pump, noise and solar in Geneva

  1. Size the heat pump
    Choose the canton's reference station, enter the gas or oil consumption of the last three years, or the floor area and condition of the building. The studio proposes the smallest model that covers the demand and flags oversizing above 30 %.
  2. Place the unit and the neighbouring windows
    On the noise radar plan, place the unit, indicate whether it is free-standing, against a façade or in a corner, then place the windows of the neighbour's sensitive rooms with their sensitivity level. Read the day and night Lr and test an enclosure, a screen or silent mode.
  3. Add solar and prepare the file
    Enter the output in kWp or the roof area, the orientation and the household consumption. Print the sheet, export the plan as PNG and the bill of quantities as CSV, then enclose them with the official form required by the canton.

Open the free studio →

What the free version does not do for a Geneva project

The studio submits no building application, no notification and no subsidy application. It replaces neither the official noise assessment nor the installer's calculation, and it does not know the sensitivity level of the plot, set by the zoning plan: check it with the municipality or the canton. The studio's Geneva subsidy scale is indicative and gives no guaranteed amount; conditions change every year. Nothing is saved: closing the page erases the input.

With Soumissions, the unit, the enclosure and the panels go into the items of a quotation with the price database. The ERP tracks the hours, purchases and invoicing of the job, and Portail chantier files the noise assessment and applications to share them with the client. For the plot itself, see also the Geo-Scanner page for Geneva in the related pages.

Frequently asked questions

Is approval needed for an outdoor heat pump in Geneva?

As a rule, yes: the application goes through the building approval office, with a SABRA opinion on noise. A recent revision of the energy act relaxed certain cases; check with the OCEN whether your project benefits before submitting.

Which noise value must be respected at night?

For a new installation, the OPB planning value: 45 dB(A) at night for sensitivity level II, 50 dB(A) for level III. The precautionary principle additionally requires noise to be limited as far as technology and operation allow.

Do rooftop solar panels require a permit?

Under Article 18a of the federal Spatial Planning Act, an installation sufficiently adapted to the roof, in a building or agricultural zone, is in principle subject to a simple notification. Cultural heritage and protected sites still require approval: check the Geneva procedure with the building approval office.

Does the studio calculate the amount of the Geneva subsidy?

It contains an indicative scale for Geneva and shows the federal Pronovo one-off payment for solar. These figures are estimates: the real amount is read on the official subsidy portal, and the application is submitted before work starts.