Free software · 100% in your browser · no data sent

Air/water heat pump and solar in the canton of Lucerne: noise assessment, simplified procedure and KEnG

In the canton of Lucerne, an air/water heat pump needs a permit under the simplified procedure and a noise assessment: preparing it before submission avoids back-and-forth.

Open the free studio →

Free, no account: your data stays in your browser. Indicative results, to be confirmed by the installer and the cantonal office.

The canton of Lucerne regulates energy through its cantonal energy act (Kantonales Energiegesetz, KEnG). According to the canton, an air/water heat pump requires a building permit because it can cause noise, usually under the simplified procedure provided by the planning and building ordinance (§ 53, para. 2, let. b PBV). Municipal checklists ask for a noise assessment for air/water heat pumps and the unit's data sheet with its sound power level. The cantonal environment and energy office also publishes a noise calculator: check the form required by your municipality.

Art Construction's heat pump, noise and solar studio prepares this assessment in your browser. It sizes the unit according to SIA 384/201, places the unit and the neighbouring windows on a plan, calculates the day and night Lr with the method of Cercle Bruit implementation guide 6.21 and tests an enclosure, a screen or silent mode. It also estimates photovoltaic yield. It has no Lucerne subsidy scale: you enter the amount read on the cantonal portal.

Worked example: noise margin too small and an acoustic enclosure in Lucerne

A house in Lucerne heated with oil with a recent condensing boiler, underfloor heating, hot water produced separately. Studio reference station for the canton: 440 m, design temperature −8 °C, irradiation 1,150 kWh/m² per year. The unit is placed against the façade, 6 m from the neighbouring window, sensitivity level II (example value).

Heat pump, noise and solar: Lucerne example (example values)
StepInputCalculationResult
Heat demand2,600 l of oil, efficiency 0.922,600 × 10 × 0.92 ÷ 2,100 h11.39 kW
Unit selectedoutdoor air/water, underfloor 35 °Csmallest model covering the demand13 kW model (12.6 kW at 35 °C)
Night-time noise without measuresLWA 53 dB(A), façade, 6 m53 − 11 + 6 − 15.6 + 10 + 2Lr = 44.4 dB(A), orange status
Noise with enclosureattenuation of 5 dB44.4 − 5Lr = 39.4 dB(A), green status
Solar12 kWp, south 30°12 × 1,150 × 1.12 × 0.8412,983 kWh per year

With a condensing boiler (efficiency 0.92), 2,600 litres of oil give 23,920 kWh of useful heat. Without hot water, the studio divides by 2,100 equivalent hours: 11.39 kW. It selects the 13 kW unit (12.6 kW at 35 °C), whose night-time sound power is 53 dB(A). Against the façade, at 6 m: 53 − 11 + 6 − 20 × log(6) + 10 + 2 = 44.4 dB(A).

The margin below the 45 dB(A) night value is only 0.6 dB: the status is orange, because the precautionary principle calls for doing better where possible. A 5 dB acoustic enclosure, entered in the studio, brings Lr down to 39.4 dB(A) and the margin to 5.6 dB. The real attenuation of an enclosure is proven by the manufacturer's data sheet. Twelve kWp facing due south produce about 12,983 kWh per year.

Without measures, the 13 kW unit comes close to the planning value (44.4 dB(A)); with a 5 dB enclosure, it falls to 39.4 dB(A) at night.

3 common mistakes for a heat pump and solar in Lucerne

Settling for being just below the value

Being at 44.4 dB(A) for a value of 45 dB(A) is not necessarily enough: the precautionary principle requires noise to be limited as far as possible. The studio shows orange status below a 3 dB margin to draw attention to it.

Counting an enclosure without the manufacturer's data sheet

An enclosure or screen is only taken into account if its effect is proven. The studio flags cumulative attenuation above 10 dB, which must be justified by the manufacturer or an acoustician.

Submitting without the unit's data sheet

Lucerne municipalities ask for the data sheet with the sound power level. The studio's generic model serves for the preliminary calculation: replace it with the data sheet of the chosen model before submission.

Using the studio in 3 steps: heat pump, noise and solar in Lucerne

  1. Size from oil consumption
    Choose the Lucerne station, oil, the quantity and tick the condensing boiler. Untick hot water if it remains produced separately.
  2. Place the unit and test measures
    Place the unit against the façade, place the neighbouring window and read the Lr. If the status is orange, test an enclosure, a screen or silent mode, entering the manufacturer's values.
  3. Add solar and prepare the file
    Enter the panels and consumption, then print the sheet and plan. Enclose them with the noise assessment and the municipality's simplified permit application.

Open the free studio →

What the free version does not do for a project in Lucerne

The studio submits no permit application, notification or subsidy application. It replaces neither the official noise assessment nor the installer's calculation, and it does not know the sensitivity level of the plot. It has no Lucerne subsidy scale; the subsidy application is in principle submitted before work starts, to be checked on the cantonal portal.

Soumissions takes the unit, the enclosure and the panels into a quotation with the price database; the ERP tracks the job and invoicing; Portail chantier files the noise assessment and the permit. The related pages also point to the Geo-Scanner page for the canton of Lucerne.

Frequently asked questions

Does an air/water heat pump require a permit in the canton of Lucerne?

Yes, according to the canton, because it can cause noise, usually under the simplified procedure provided by the planning and building ordinance. The municipality indicates the documents to enclose.

Which noise assessment must be enclosed?

Municipalities ask for a noise assessment for air/water heat pumps and the data sheet with the sound power level. The cantonal environment and energy office publishes a calculator; the studio applies the Cercle Bruit method.

Is an acoustic enclosure enough to fix an exceedance?

It helps if its attenuation is proven by the manufacturer. Often, moving the unit or placing it further from the neighbouring window is more effective and less costly.

Must rooftop solar panels be notified?

An installation sufficiently adapted to the roof is in principle subject to notification under Article 18a LAT. Protected buildings and ground-mounted installations still require a permit: check with the municipality.