Free software · 100% in your browser · no data sent

Air/water heat pump and solar in Aargau: OPB noise, notification and EnergieG

In Aargau, an outdoor air/water heat pump can go through a notification procedure if noise and distances are respected: prepare the noise assessment before ordering the unit.

Open the free studio →

Free, no account: your data stays in your browser. Indicative results, to be confirmed by the installer and the cantonal office.

The canton of Aargau revised its energy act (Energiegesetz des Kantons Aargau, EnergieG, SAR 773.200), in force since 1 April 2025. Since this revision, an air/water heat pump installed outdoors can, under certain conditions, be notified instead of going through an ordinary building permit: building zone without protected status, noise assessment available and boundary distances respected under the building ordinance (BauV, § 49b). Notification is made online on the cantonal platform for energy regulations; the municipality has 30 days to object. Rooftop solar follows the notification regime of Art. 18a of the Spatial Planning Act (LAT). Borderline cases should be checked with the municipality and the cantonal energy office.

The heat pump, noise and solar studio prepares this file in your browser: it estimates the heat pump output with the Aarau reference station, calculates the night-time rating level at the neighbour with the Cercle Bruit method, compares the result with the planning value of the chosen sensitivity level (DS) and estimates photovoltaic yield. For Aargau, no cantonal subsidy scale is built in: you enter the amount read on the cantonal programme yourself.

Worked example: air/water heat pump and 9 kWp of solar on a house in Aargau

A detached house heated with oil, at about 400 m altitude (studio station of Aarau: 385 m, θe,norm −9 °C, irradiation 1,150 kWh/m² per year). Average consumption of 2,400 litres of heating oil, non-condensing boiler, hot water produced by the future heat pump. Outdoor unit placed against the façade, 8 m from the neighbour's bedroom window, residential zone with sensitivity level II (example value; the DS is shown in the municipal zoning plan).

Heat output, night-time noise and solar yield (example values)
QuantityInputStudio calculationResult
Current useful heat2,400 l of oil2,400 × 10 × 0.8520,400 kWh/yr
Heat pump output2,300 h (heating and hot water)20,400 ÷ 2,3008.87 kW
Night-time level LeqLWA 49 dB(A), façade, 8 m49 − 11 + 6 − 18.0625.9 dB(A)
Night-time rating level LrK1 10, K2 2, K3 025.94 + 1237.9 dB(A)
Planning value DS II, nightOPB, annex 6comparison45 dB(A), margin 7.1 dB
Photovoltaic yield9 kWp, south 30°9 × 1,150 × 1.12 × 0.849,737 kWh/yr

The useful heat is 2,400 litres multiplied by 10 kWh per litre and by the default efficiency of 0.85, i.e. 20,400 kWh per year. The studio divides by 2,300 equivalent full-load hours (below 800 m altitude, hot water included): about 8.9 kW are needed. For noise, the night-time sound power level of 49 dB(A), minus the constant of 11 dB, plus 6 dB for installation against a façade and minus 20 × log10(8) = 18.06 dB, gives 25.9 dB(A). With the night-time corrections K1 = 10 and K2 = 2, the rating level reaches 37.9 dB(A).

The night-time planning value for sensitivity level II is 45 dB(A): the margin of 7.1 dB puts the project in the green. On the solar side, 9 kWp facing south at 30° produce 9 × 1,150 × 1.12 × 0.84 = 9,737 kWh per year with the studio's default factors. These figures help prepare the notification; the manufacturer's data sheet and the official assessment prevail.

A heat pump of about 8.9 kW placed 8 m from the neighbouring window stays at 37.9 dB(A) at night, below the 45 dB(A) value, and 9 kWp produce about 9,700 kWh per year.

3 common pitfalls for a heat pump and solar in Aargau

Assuming the notification applies to every plot

The Aargau notification procedure covers building zones without protected status, with a noise assessment and respected distances. In a protected area, outside the building zone or if one condition is missing, the municipality requires a permit: check the zone before signing the order.

Placing the unit in an inside corner

A corner formed by two walls adds 9 dB instead of 6 dB against a single façade. On a small plot, this choice alone can push the night-time level above the planning value, even with a quiet unit.

Starting work before the subsidy decision

Cantonal programme subsidies are as a rule applied for before work starts. A heat pump already ordered or installed may lose its right to support: submit the application and wait for confirmation, then start the job.

Using the studio in 3 steps for a project in Aargau

  1. Choose the station and the demand
    Select the Aarau station or enter your postcode, adjust the altitude, then enter the oil or gas consumption of the last three years. The studio proposes the output and the smallest model that covers the demand.
  2. Place the unit and the neighbour
    In the noise radar, place the unit, the façade, then the window of the neighbour's sensitive room. Choose the sensitivity level read in the municipal zoning plan and test an enclosure, a screen or silent mode if the margin is small.
  3. Add solar and print
    Enter the roof area or the output in kWp, the orientation and your consumption. Enter the cantonal subsidy yourself, then print the sheet and export the plan to prepare the notification and the noise assessment.

Open the free studio →

What the free version does not do

The studio does not submit any notification, permit or subsidy application. It does not replace the official noise assessment, prepared with the Cercle Bruit tool or the form required by the municipality, nor the installer's sizing. It does not know the sensitivity level of your plot and includes no Aargau subsidy scale: enter the amount read on the current programme. See also the studio's noise calculator page and the page of the subsidy simulator by canton.

With Soumissions, the output and quantities go into the items of the quotation; the ERP tracks the installation, hours and invoicing; Portail chantier files the noise assessment, the notification and the data sheets by site to share them with the client. To locate the plot, the Geo-Scanner page for Aargau shows the zone and the PLR cadastre (ÖREB).

Frequently asked questions

Is a building permit needed for an air/water heat pump in Aargau?

Since the revision of the EnergieG in April 2025, an outdoor air/water heat pump can be notified to the municipality if it is in a building zone without protection, with a noise assessment and respected distances. Otherwise, a permit is still required. The municipality has 30 days to respond.

Which noise assessment must be enclosed?

The assessment follows the method of the Cercle Bruit implementation guide for air/water heat pumps. The studio applies this method to prepare the calculation, but the assessment to enclose is the one required by the municipality or the canton.

Must rooftop solar panels be notified?

Yes, as a rule: under Art. 18a LAT, an installation sufficiently adapted to the roof in a building or agricultural zone is notified to the municipality. Cultural heritage sites and protected sites still require a permit. Check the form of notification with the municipality.

Does the studio know the amount of the Aargau subsidy?

No. For Aargau, the studio has no cantonal scale: you enter the amount read on the current programme. The Pronovo one-off payment for solar is calculated with a default scale that should be checked.