The canton of Jura regulates energy through its cantonal energy act and its energy ordinance (OEN), which deals with the performance of heating systems. An outdoor air/water heat pump falls under the act on construction and spatial planning (LCAT): a building permit is required, and the canton publishes an energy form to be signed and enclosed with the application when the work concerns the heating system, for example a heat pump. The sources consulted do not specify a Jura-specific noise rule: the reference method remains Cercle Bruit implementation guide 6.21 for the federal Noise Abatement Ordinance (OPB). The spatial development office and the municipality indicate the exact documents.
For solar, the cantonal directive on solar panels states that a rooftop installation, thermal or photovoltaic, is as a rule installed on a simple notification; a permit is still required in particular for a façade or ground-mounted installation. Art Construction's heat pump, noise and solar studio contains a reference station in the Jura. It sizes the heat pump according to SIA 384/201, calculates noise with the Cercle Bruit method and estimates photovoltaic yield. It has no Jura subsidy scale: you enter the official amount.
Worked example: replacing electric heating with a heat pump in the Jura
A house in the Jura heated by electric storage heaters, with water radiators planned. Studio reference station for the canton: 415 m, design temperature −10 °C, irradiation 1,100 kWh/m² per year. The unit is free-standing in the garden, 4 m from the neighbouring window, sensitivity level II (example value).
| Step | Input | Calculation | Result |
|---|---|---|---|
| Heat demand | 15,000 kWh of electricity, efficiency 1 | 15,000 ÷ 2,300 h | 6.52 kW |
| Unit selected | outdoor air/water, radiators 55 °C | smallest model covering the demand | 8 kW model (7.1 kW at 55 °C) |
| Night-time noise | LWA 49 dB(A), free field, 4 m | 49 − 11 + 3 − 12.0 + 10 + 2 | Lr = 41.0 dB(A) |
| OPB comparison | DS II, night | planning value 45 dB(A) | margin of 4.0 dB |
| Solar | 7 kWp, south 30° | 7 × 1,100 × 1.12 × 0.84 | 7,244 kWh per year |
Direct electric heating has an efficiency of 1: the 15,000 kWh billed are the useful heat. Divided by 2,300 equivalent hours (heating and hot water in the lowlands), they give 6.52 kW. The studio relates this demand to the reference point of its models and selects the 8 kW unit (7.1 kW at 55 °C). Free-standing, it receives 3 dB of directivity: 49 − 11 + 3 − 20 × log(4) + 10 + 2 = 41.0 dB(A) at night.
The margin of 4.0 dB below the planning value gives green status, but close to the 3 dB precautionary threshold: moving the unit 2 m further or choosing silent mode improves the file. Seven kWp facing due south produce about 7,244 kWh per year, part of which is consumed by the heat pump itself, which the studio counts in self-consumption.
The 8 kW heat pump replaces direct electricity and stays at 41.0 dB(A) at night 4 m from the neighbouring window, with a 4 dB margin.
3 common mistakes for a heat pump and solar in the Jura
Keeping radiators designed for electricity
Electric storage heaters cannot be connected to a heat pump: a hydronic system and radiators sized for a low flow temperature are needed. The studio uses 55 °C for radiators, which reduces output and SCOP.
Placing the unit too close to the boundary
Within 3 m of a window, the calculation becomes unreliable and the studio flags it. At 4 m, the margin remains small: planning the location from the outset avoids rework after an objection.
Forgetting the energy form
The canton asks for a signed energy form with the permit application when the heating system changes. Without it, the file is incomplete: check the list of documents with the municipality.
Using the studio in 3 steps: heat pump, noise and solar in the Jura
- Start from electricity consumption
Choose the Jura station, then electric heating and the heating consumption of the last three years. The studio calculates the output and proposes a model. - Place the unit in the garden
Place the unit on the plan, choose free-field propagation, place the neighbouring window and read the night-time Lr. Test another position or silent mode if the margin is small. - Add the panels and print
Enter the panels and the household consumption, then print the sheet and plan. Enclose them with the permit application and the solar notification.
What the free version does not do for a project in the Jura
The studio submits no permit application, notification or subsidy application. It replaces neither the official noise assessment, the energy form nor the installer's calculation, and it does not know the sensitivity level of the plot. It has no Jura subsidy scale: the subsidy application is in principle submitted before work starts, to be checked on the cantonal portal.
Soumissions takes the unit, the hydronic system and the panels into a quotation with the price database; the ERP tracks the job and invoicing; Portail chantier files the permit, the form and the noise assessment. The related pages also point to the Geo-Scanner page for the canton of Jura.
Frequently asked questions
Is a permit needed for an outdoor heat pump in the Jura?
Yes, as a rule, under the act on construction and spatial planning, with an energy form enclosed with the application. The municipality and the spatial development office indicate the exact procedure.
Which noise calculation method should be used?
The method of Cercle Bruit implementation guide 6.21, which is also the studio's. The sources consulted mention no specific Jura rule: check with the municipality whether a form is required.
Do rooftop solar panels require a permit?
The cantonal directive states that a rooftop installation is as a rule installed on a simple notification. Façade or ground-mounted installations, and protected buildings, still require a permit.
Is replacing electric heating supported?
Funding programmes often target this replacement, but conditions and amounts change every year. Consult the cantonal portal and submit the application before starting.