The canton of Schwyz regulates energy through its energy act (Energiegesetz, SRSZ 420.100). The environment and energy office has published a guide on planning air-to-water heat pumps: it recommends first considering a district heating network, a geothermal probe or solar thermal. Under the implementing ordinance of the planning and building act (§ 45a), a unit placed inside a building can be authorised by notification; an outdoor unit in the building zone goes through the simplified permit procedure, and outside the building zone through the ordinary procedure. An incomplete file falls back into the ordinary procedure.
For noise, the canton refers to the Cercle Bruit implementation guide on air-to-water heat pumps. The Art Construction heat pump, noise and solar studio applies this method: night-time Lr at the neighbour’s window, compared with the planning value. It has no Schwyz station: use the nearest one (440 m, θe,norm −8 °C) or a free entry for a house at a higher altitude.
Worked example: a renovated 220 m² house in a residential zone
A house whose envelope has been renovated, 220 m² of energy reference area, 5 occupants, underfloor heating, in a residential zone with noise sensitivity level II. Unit against a façade, 12 m from the neighbour’s window. The studio’s nearest station: 440 m, −8 °C, 1,150 kWh/m². Example values.
| Item | Input | Calculation | Result |
|---|---|---|---|
| Demand from the area (40 W/m² at −8 °C) | 220 m², θe −8 °C | 220 × 40 ÷ 1,000 × 28 ÷ 28 | 8.8 kW |
| Hot water, 5 occupants | 0.2 kW per person | 5 × 0.2 | 1.0 kW, total 9.8 kW |
| Output to guarantee at −7 °C (floor 35 °C) | 9.8 kW | 9.8 × 27 ÷ 28 | 9.45 kW |
| Template selected, night level at 12 m | LWA 51 dB(A), façade | 51 − 11 + 6 − 21.58 + 12 | Lr 36.4 dB(A) for VP 45 |
| East-west photovoltaics 15° | 22 modules, 9.9 kWp | 9.9 × 1,150 × 0.96 × 0.84 | 9,181 kWh per year |
For a renovated envelope, the default specific load is 40 W/m² at −8 °C; at −8 °C on site, no correction is needed: 220 × 40 ÷ 1,000 = 8.8 kW, plus 1.0 kW for the hot water of 5 people, giving 9.8 kW. Under test conditions: 9.8 × 27 ÷ 28 = 9.45 kW; the 9.7 kW template at 35 °C is suitable. Noise: 51 − 11 + 6 − 20 × log(12) = 24.4 dB(A), plus 12 dB of night corrections: Lr = 36.4 dB(A).
The margin is 8.6 dB below the 45 dB(A) planning value. The cantonal guide mentions case law that places the decisive noise-sensitive room first in the building itself: for a house with close neighbours, also assess your own windows. The east-west solar system produces 9.9 × 1,150 × 0.96 × 0.84 = 9,181 kWh per year; according to the 2026 cantonal programme, photovoltaics are supported not by the canton but by the Confederation (Pronovo).
A 9.7 kW unit against the façade stays 8.6 dB below the night-time planning value; the file follows the simplified procedure in the building zone.
3 common mistakes before installing a heat pump in Schwyz
Submitting an incomplete file
An incomplete notification or simplified procedure falls back into the ordinary procedure, which takes longer. Attach the noise certificate, the data sheet and the site plan from the start.
Forgetting your own windows
The cantonal guide points out that the decisive noise-sensitive room may be in the building itself. Also place your own windows in the studio’s noise radar.
Waiting for a cantonal subsidy for photovoltaics
The 2026 cantonal support programme does not fund photovoltaics, which are supported by the federal one-off payment. Subsidies for the heat pump are requested before work begins, under the programme in force.
How to use it in 3 steps for a house in Schwyz
- Enter the area and the condition of the building
Enter the energy reference area, the condition of the envelope and the number of occupants, or the current consumption; choose the nearest station or a free entry at altitude. - Assess the noise at the neighbours’ and at home
Place the unit and all the windows concerned, including your own, with their sensitivity level. Read the margin and test silent mode. - Add the solar system and print
Enter the modules and the orientation, read the yield and self-consumption, then print the sheet to prepare the application and the official certificate.
What the free studio does not do in Schwyz
The studio submits no notification, no permit application and no subsidy application, does not replace the official noise certificate and does not know the sensitivity level of the plot. It includes no Schwyz scale: enter the amount from the cantonal programme. The Geo-Scanner page for Schwyz helps you read the plot’s zone.
Portail chantier files the application, the certificate and the sheets by site. Soumissions takes the output and the quantities into your bid; the Art Construction ERP tracks the installation, the hours and the invoicing.
Frequently asked questions
Which procedure applies to an outdoor heat pump in Schwyz?
According to the cantonal guide, an outdoor unit in the building zone goes through the simplified permit procedure, and outside the zone through the ordinary procedure. An indoor unit can be authorised by notification.
Which noise method does the canton use?
The Cercle Bruit implementation guide on air-to-water heat pumps. The studio applies the same method for an estimate; the official certificate still has to be submitted.
Do rooftop solar panels need a permit?
An installation sufficiently adapted to the roof in a building or agricultural zone falls under notification (Article 18a LAT). The form of the notification is checked with the municipality or the canton.
Does the canton fund photovoltaics?
According to the 2026 cantonal support programme, no: photovoltaics are supported by the Confederation. Cantonal subsidies cover other measures, to be requested before work begins.