The canton of Bern regulates energy through the cantonal energy act (KEnG, BSG 741.1) and the building procedure through the decree on the building permit procedure (BewD, BSG 725.1). Air/water heat pumps installed outdoors are among the special cases requiring a permit; the noise assessment using the Cercle Bruit method must accompany the application, and files go through the cantonal eBau platform. The government has proposed replacing the permit with a notification in simple cases: check with the municipality whether this rule applies to your project. Rooftop solar benefits from a notification (Art. 7a BewD) and, since 1 January 2026, new solar requirements apply to new buildings under the KEnG.
The heat pump, noise and solar studio uses the Bern station (540 m, θe,norm −8 °C). It calculates the heat pump output from the electricity consumption of direct electric heating, the night-time rating level at the neighbour and the photovoltaic yield. The canton of Bern has no built-in subsidy scale: enter the amount of the current cantonal programme, submitting the application before work starts.
Worked example: replacing direct electric heating in the canton of Bern
A house heated by direct electric radiators, 16,000 kWh of heating electricity per year, hot water not included. Bern station. Unit placed in free field in the garden, 12 m from the neighbour's window, residential zone with sensitivity level II (example value), night-time sound power level of 50 dB(A).
| Quantity | Input | Studio calculation | Result |
|---|---|---|---|
| Current useful heat | 16,000 kWh of electricity | 16,000 × 1.0 | 16,000 kWh/yr |
| Heat pump output | 2,100 h (heating only) | 16,000 ÷ 2,100 | 7.62 kW |
| Night-time level Leq | LWA 50, free field, 12 m | 50 − 11 + 3 − 21.58 | 20.4 dB(A) |
| Night-time rating level Lr | K1 10, K2 2 | 20.42 + 12 | 32.4 dB(A) |
| Planning value DS II, night | OPB, annex 6 | comparison | 45 dB(A), margin 12.6 dB |
| Photovoltaic yield | 10 kWp, south 30° | 10 × 1,150 × 1.12 × 0.84 | 10,819 kWh/yr |
Direct electric heating has an efficiency of 1: the 16,000 kWh consumed are as much useful heat. Over 2,100 full-load hours, the heat pump must deliver 7.62 kW. Placed freely in the garden, away from walls, the unit receives only 3 dB of directivity: 50 − 11 + 3 − 20 × log10(12) gives 20.4 dB(A), and 32.4 dB(A) once the night-time corrections K1 = 10 and K2 = 2 are added. The margin of 12.6 dB below the planning value is wide.
Switching from electric heating to a heat pump divides consumption: with a seasonal performance factor close to 4 on underfloor heating, about 4,000 kWh of electricity per year remain. The 10 kWp facing south produce about 10,819 kWh per year, part of which covers the heat pump in spring and autumn. The studio checks that the chosen unit covers the demand without being oversized by more than 30 %.
The heat pump of about 7.6 kW placed 12 m away stays at 32.4 dB(A) at night, well below 45 dB(A), and 10 kWp produce about 10,800 kWh per year.
3 common pitfalls in the canton of Bern
Notifying a heat pump that needs a permit
Rooftop solar is notified, but an outdoor air/water heat pump in principle still requires a permit in the canton of Bern. The file goes through eBau with the noise assessment: check the procedure in force with the municipality before ordering the unit.
Forgetting the neighbours' consent requested by the municipality
Some Bernese municipalities ask, in addition to the noise assessment, for documents on distances and the neighbours' agreement when a heating system is replaced. Read your municipality's list of documents.
Overlooking the new solar rules for new buildings
Since 1 January 2026, the KEnG sets solar production requirements for new buildings. A new project must take them into account from the preliminary design, not only at the time of notification.
Using the studio in 3 steps in the canton of Bern
- Choose Bern and electric heating
Select the Bern station or your postcode, choose electric heating and enter the annual consumption. Indicate whether the heat pump will also produce hot water. - Place the unit in the garden
Place the unit, choose free field, façade or corner according to the real location, then place the neighbouring window. Note the rating level and the margin for the assessment. - Print for the eBau file
Add solar and the cantonal subsidy entered by hand, then print the sheet and export the plan. These documents prepare the file; the official assessment remains the one required by the municipality.
What the free version does not do
The studio submits nothing on eBau and replaces neither the official noise assessment nor the installer's calculation. It does not include the Bern subsidy scale and does not know the sensitivity level of the plot. See also the noise calculator page, the Pronovo simulator and the subsidy simulator by canton.
With Soumissions, the heat pump and solar go into the quotation; the ERP tracks the installation and invoicing; Portail chantier files the dossier and shares it with the client. The Geo-Scanner page for the canton of Bern locates the plot and its PLR cadastre (ÖREB).
Frequently asked questions
Does an outdoor air/water heat pump require a permit in the canton of Bern?
In principle yes: it is among the special cases requiring a permit, with a noise assessment. A government proposal provides for a notification in simple cases; check with the municipality whether it applies.
Where is the file submitted?
Through the cantonal eBau platform, to the municipality. The noise assessment according to Cercle Bruit is one of the documents.
Must rooftop solar be notified?
Yes: the BewD provides a notification requirement for solar installations (Art. 7a). Cultural heritage and protected sites still require a permit.
Why does free-field propagation give less noise?
Away from walls, the unit benefits from no reflection: the studio adds 3 dB instead of 6 dB against a façade or 9 dB in a corner. Within 3 m of a façade, choose the façade directivity.