Free software · 100% in your browser · no data sent

Air-to-water heat pump and solar in Schaffhausen: notification, OPB noise and energy

In Schaffhausen, a small outdoor heat pump can go through a notification, but the noise certificate is still required: the margin at the neighbour’s window decides.

Open the free studio →

Free, no account: your data stays in your browser. Indicative results, to be confirmed by the installer and the cantonal office.

The canton of Schaffhausen has taken its energy rules out of the building act (Baugesetz) and brought them together in an energy act (Energiegesetz, EnerG, SHR 730.100) of 16 December 2024, supplemented by the energy ordinance (EnerV, SHR 730.101). According to a 2024 presentation by the building department, outdoor air-to-water heat pumps with a volume of up to 2 m³ go through a notification procedure: a notification form replaces the permit application, but the documents remain the same, including the noise certificate, the data sheet and the site plan. The canton also points out that the notification changes nothing in how noise complaints are handled. Check with the municipality that this rule is still in force for your project.

The Art Construction heat pump, noise and solar studio prepares this file in your browser: unit output, night-time Lr at the neighbour’s window using the Cercle Bruit method, comparison with the planning value, effect of silent mode, photovoltaic yield. It has no Schaffhausen station: use the nearest reference station (410 m, θe,norm −9 °C) or a free entry.

Worked example: unit in a façade corner, margin too small

A house heated with gas, with radiators, in a residential zone with noise sensitivity level II. The unit is planned in an inside corner, 7 m from the neighbour’s bedroom. The studio’s nearest station: 410 m, −9 °C, 1,150 kWh/m² per year. Example values.

Heat pump and solar for a house in Schaffhausen (example values)
ItemInputCalculationResult
Gas consumed (bill, gross calorific value)18,000 kWh per year18,000 × 0.9 × 0.88 ÷ 2,300 h6.20 kW
Output to guarantee at −7 °C (radiators 55 °C)θe −9 °C6.20 × 27 ÷ 295.77 kW
Template selected, normal night operationLWA 49 dB(A), corner49 − 11 + 9 − 16.90 + 12Lr 42.1 dB(A) for VP 45
Same unit in silent modeLWA 45 dB(A)45 − 11 + 9 − 16.90 + 12Lr 38.1 dB(A)
Photovoltaics south 30°18 modules, 8.1 kWp8.1 × 1,150 × 1.12 × 0.848,764 kWh per year

The gas on the bill is stated at gross calorific value: the studio converts it (× 0.9), applies the boiler efficiency (0.88) and divides by 2,300 hours (lowland, hot water included): 6.20 kW, or 5.77 kW to guarantee at −7 °C. The smallest template that delivers this output at 55 °C has a night sound power of 49 dB(A). In a corner, directivity adds 9 dB; the 7 m distance subtracts 20 × log(7) = 16.90 dB; night K1 and K2 add 12 dB: Lr = 42.1 dB(A).

The margin below the 45 dB(A) planning value is only 2.9 dB: amber status. The precautionary principle of the Environmental Protection Act calls for doing better where possible. In silent mode (45 dB(A)), Lr falls to 38.1 dB(A), a 6.9 dB margin; moving the unit out of the corner (against a façade, 6 dB instead of 9) would gain another 3 dB. The solar system produces 8.1 × 1,150 × 1.12 × 0.84 = 8,764 kWh per year.

In the corner, the 2.9 dB margin is too tight: night-time silent mode or another position restores about 7 dB.

3 common mistakes before installing a heat pump in Schaffhausen

Taking the notification as an exemption from the certificate

Even under the notification procedure, the cantonal form requires the noise certificate, the data sheet, the site plan and the drawings. The file must be complete before installation.

Placing the unit in an inside corner

A corner reflects noise and adds 9 dB, against 6 dB in front of a flat façade and 3 dB in free field. Test several positions in the studio before pouring the base.

Counting on the subsidy without solar

According to 2024 cantonal information, support for an air-to-water heat pump was only paid together with a solar installation. Check the rule of the programme in force before submitting the application, before work begins.

How to use it in 3 steps for a house in Schaffhausen

  1. Enter the location and the consumption
    Use the nearest reference station or enter the local altitude and temperature. Enter the gas consumption from the bill and state whether the boiler is a condensing one.
  2. Compare the unit positions
    In the noise radar, place the unit in free field, against a façade and then in a corner, with the neighbouring windows. Switch on silent mode and read the margin of each option.
  3. Add the solar system and prepare the notification
    Enter the modules and the orientation, note the yield and the self-consumption, then print the sheet to prepare the notification form and the official certificate.

Open the free studio →

What the free studio does not do in Schaffhausen

The studio completes neither the notification form nor the official certificate, does not know the sensitivity level of the neighbouring plot and includes no Schaffhausen subsidy scale. It submits nothing. The Geo-Scanner page for Schaffhausen helps you read the zone and the framework of the plot.

Portail chantier files the certificate, the notification form and the sheets by site. Soumissions takes the output and the quantities into your bid; the Art Construction ERP tracks the installation, the hours and the invoicing.

Frequently asked questions

Is a permit needed for an outdoor heat pump in Schaffhausen?

According to a 2024 cantonal presentation, an outdoor unit of up to 2 m³ goes through a notification procedure, with the same documents as an application. Check the current rule with the municipality.

Which energy act applies?

The energy act (EnerG, SHR 730.100) of 16 December 2024 and its ordinance (EnerV, SHR 730.101). The energy rules used to be part of the building act.

Do rooftop solar panels need a permit?

An installation sufficiently adapted to the roof in a building or agricultural zone is subject to notification (Article 18a LAT). Installations on cultural or natural assets of cantonal or national importance require a permit.

What if the noise margin is below 3 dB?

The precautionary principle calls for reducing noise as far as possible: another position, night-time silent mode, an enclosure or a screen. The studio shows the effect of each measure on Lr.