Air-to-water heat pump and solar in the canton of Zug: notification, permit, OPB noise and EnG

In the canton of Zug, replacing a heating system goes through the municipality and an outdoor unit may need a permit: prepare the noise assessment before choosing the position.

Open the free studio →

Free, no account: your data stays in your browser. Indicative results, to be confirmed by the installer and the cantonal office.

The canton of Zug applies its energy act (Energiegesetz, EnG), revised and in force since 2024, and its implementing ordinance (V EnG). When a heat generator is replaced, a heat pump or a connection to district heating meets the cantonal renewable energy requirement. According to the canton’s practice notes, the replacement is notified to the municipality by a Bauanzeige with the energy forms; this notification becomes a permit application (Baugesuch) when the project requires a permit, for example for an air-to-water heat pump installed outdoors. A decision of the Zug cantonal government treated an outdoor unit fixed to a façade as subject to a permit, with the cantonal environment office checking the noise certificate against the planning values. The municipality conducts the procedure; check with it which document exactly has to be submitted.

The Art Construction heat pump, noise and solar studio has no Zug station: it offers the nearest reference station (440 m, θe = −8 °C, irradiation of 1,150 kWh/m²), to be replaced by the real altitude if needed. Tab 1 sizes the heat pump according to SIA 384/201, tab 2 calculates the rating level Lr at the neighbours’ with the Cercle Bruit method, and tab 3 estimates photovoltaic yield, self-consumption and the Pronovo one-off payment. The studio has no Zug scale: you enter the subsidy amount after checking it in the cantonal support programme.

Worked example: a condensing oil boiler replaced by an air-to-water heat pump in Zug

A detached house at 440 m (the studio’s nearest reference station, θe = −8 °C), condensing oil boiler, hot water included. Unit in silent mode, placed in the garden in free-field propagation, neighbour’s window at 6 m, sensitivity level II. Example values.

Output, night noise and solar calculated with the studio’s formulas (example values)
ItemValueCalculation
Current useful heat23,000 kWh/year2,500 l × 10 kWh/l × 0.92
Heat pump output10.00 kW23,000 ÷ 2,300 h
Output brought back to −7 °C9.64 kW10.00 × 27 ÷ 28
Night Lr at 6 m, free field38.4 dB(A)50 − 11 + 3 − 15.6 + 10 + 2
Night planning value, level II45 dB(A)OPB, Annex 6
Solar yield, 12 kWp south-west12,172 kWh/year12 × 1,150 × 1.05 × 0.84

A recent condensing boiler has a default efficiency of 0.92 in the studio: 2,500 litres × 10 kWh per litre × 0.92 gives 23,000 kWh of useful heat per year. With 2,300 full-load hours, the output is 10.00 kW; brought back to the −7 °C point of unit data sheets, it becomes 10.00 × 27 ÷ 28 = 9.64 kW. If the consumption differs by more than 25% from the area-based calculation, the studio flags it: compare the two methods before choosing.

In silent mode, the unit has a night LWA of 50 dB(A). Placed in the garden, away from walls (free field, +3 dB), 6 m from the neighbour’s window (20 × log 6 = 15.6 dB), it gives Leq = 26.4 dB(A) and Lr = 38.4 dB(A), a 6.6 dB margin below the night-time planning value. The same unit placed in an inside corner (+9 dB) would add 6 dB: the position matters as much as the unit. On the roof, 12 kWp facing south-west produce 12,172 kWh per year.

A 9.6 kW heat pump at the −7 °C point, placed in free field, stays 6.6 dB below the night-time planning value; the outdoor unit may nevertheless need a municipal permit.

3 common mistakes with a heat pump or solar in Zug

Relying on a Bauanzeige for an outdoor unit

Cantonal practice indicates that the notification becomes a permit application when the project requires it, for example for an outdoor air-to-water heat pump. Ask the municipality which procedure applies before fixing the position.

Placing the unit in an inside corner

An inside corner adds 9 dB against 3 dB in free field in the studio: 6 dB more at the neighbour’s for the same unit. Test several positions in the noise radar before ordering the connections.

Starting before the support is confirmed

The 2026 Zug conditions state that the support application is submitted before work begins and that starting before confirmation is at the client’s own risk. The amounts change every year: check them in the cantonal programme.

How to use it in 3 steps for a project in Zug

  1. Enter the location and the demand
    Open the studio, choose the nearest station or enter the real altitude, then enter the oil or gas consumption, or the energy reference area and the condition of the envelope.
  2. Find the quietest position
    Place the unit and the neighbours’ windows, enter the municipal sensitivity level and the night LWA, then compare free field, façade and inside corner, with or without an enclosure.
  3. Add the solar system and print
    Add the photovoltaic array, enter the verified support amount and print the sheet for the municipality and the installer.

Open the free studio →

What the free studio does not do for a project in Zug

The studio submits no Bauanzeige, no permit application and no support application, and it does not replace the signed noise certificate. It has neither a station nor a scale for Zug and does not know the sensitivity level of the plot: these values are entered after checking with the municipality and the canton.

With Soumissions, the unit, the enclosure and the solar array become bid items with the price database. The ERP tracks the installation, the hours and the invoicing, and Portail chantier files the application, the certificate and the photos by site.

Frequently asked questions

Does an outdoor air-to-water heat pump need a permit in Zug?

According to cantonal practice, the notification of the replacement becomes a permit application when the project requires it, for example for an outdoor unit. The municipality conducts the procedure: check with it.

Which Zug law applies to energy?

The energy act of the canton of Zug (EnG), revised and in force since 2024, and its ordinance (V EnG). A heat pump meets the renewable requirement when a heating system is replaced.

How does the studio calculate the noise at the neighbour’s?

With the Cercle Bruit method: Leq = LWA − 11 + Dc − 20·log(s) − ΔL, then Lr = Leq + K1 + K2 + K3. It compares Lr with the planning value of the sensitivity level you enter.

Does the studio know the Zug support?

No: it has no scale for Zug. Enter the amount verified in the cantonal support programme; the studio adds the Pronovo one-off payment for solar to it.