In the canton of Vaud, energy policy rests on the Vaud energy act (LVLEne) and its implementing regulation (RLVLEne); building procedures fall under the LATC and its regulation (RLATC). Since the simplification decided by the cantonal government, Article 68c RLATC exempts from a building permit, under conditions, an air-to-water heat pump installed in an existing building: integration into the building, limited outdoor volume (2 m³ according to cantonal information), no harm to an overriding interest and no excessive noise. The installation is then notified to the municipality with the cantonal heat pump notification form, which takes over the Cercle Bruit acoustic data. Outside these conditions, a permit application remains necessary and the Directorate General for the Environment (DGE) gives its opinion, with the certificate of compliance with noise protection requirements. Solar panels sufficiently adapted to the roof are notified to the municipality with the standard form under Article 68a RLATC; a protected cultural asset requires an authorisation.
The Art Construction heat pump, noise and solar studio prepares this file in the browser. The Vaud reference station gives the altitude, design temperature and irradiation; tab 1 calculates the heat pump output according to SIA 384/201, tab 2 places the unit and the neighbours’ windows on a plan and compares the rating level Lr with the planning value according to the sensitivity level, and tab 3 estimates photovoltaic yield, self-consumption, the Pronovo one-off payment and subsidies. For Vaud, the studio contains a cantonal scale taken from its specification: these are starting values to be checked, not a confirmed amount.
Worked example: replacing a gas boiler with an air-to-water heat pump in Vaud
An existing detached house on the Vaud Plateau, at 495 m (the studio’s reference station, θe = −7 °C, irradiation of 1,250 kWh/m² per year). Non-condensing gas boiler, hot water included, neighbour in a residential zone with sensitivity level II. All unit values are example values.
| Item | Value | Calculation |
|---|---|---|
| Current useful heat | 17,424 kWh/year | 22,000 kWh GCV × 0.9 × 0.88 |
| Heat pump output | 7.58 kW | 17,424 kWh ÷ 2,300 h |
| Night Lr without measures, at 7 m on the façade | 45.1 dB(A) | 55 − 11 + 6 − 16.9 + 10 + 2 |
| Night Lr with a 5 dB enclosure | 40.1 dB(A) | 45.1 − 5 |
| Night planning value, level II | 45 dB(A) | OPB, Annex 6 |
| Solar yield, 10 kWp east-west | 10,080 kWh/year | 10 × 1,250 × 0.96 × 0.84 |
The useful heat comes from the bill: 22,000 kWh of gas at gross calorific value, converted to net calorific value (× 0.9) and multiplied by the default efficiency of a non-condensing boiler (0.88), giving 17,424 kWh per year. With 2,300 full-load hours (heating and hot water, below 800 m), the required output is 7.58 kW; at −7 °C, the station’s temperature, no correction is added (27 ÷ 27). For noise, the studio applies Leq = LWA − 11 + Dc − 20·log(s) − ΔL, then Lr = Leq + K1 + K2 + K3: with a night LWA of 55 dB(A), façade mounting (+6 dB) and 7 m to the neighbour’s window, Leq = 33.1 dB(A) and Lr = 33.1 + 10 + 2 = 45.1 dB(A).
The result exceeds the level II night-time planning value (45 dB(A)) by 0.1 dB: the status is red. A 5 dB acoustic enclosure brings Lr down to 40.1 dB(A), a 4.9 dB margin. On the roof, 10 kWp facing east-west at 15° (factor 0.96, overall efficiency 0.84) produce 10,080 kWh per year; the studio derives the self-consumption with the heat pump from it. These figures help prepare the notification form and the discussion with the installer; they do not replace them.
Without an enclosure, the unit exceeds the night-time planning value by 0.1 dB; with 5 dB of attenuation, Lr falls to 40.1 dB(A) and notification under Article 68c RLATC becomes possible.
3 common mistakes with a heat pump or solar in Vaud
Believing every outdoor heat pump is exempt
The exemption under Article 68c RLATC covers an existing building and specific conditions: outdoor volume, integration, noise. A new building, a ground-source or water-to-water heat pump, or an installation above 1,000 m outside the Minergie standard (according to cantonal information) follows another procedure: check with the municipality before ordering the unit.
Calculating noise without knowing the sensitivity level
The planning value depends on the sensitivity level of the neighbouring plot, set by the municipal zoning plan. The studio does not know it: enter it according to the municipality. A mistake between level II and level III changes the night limit from 45 to 50 dB(A).
Starting work before the subsidy application
Programme Bâtiments subsidies and Vaud cantonal subsidies are as a rule requested before work begins, on the cantonal portal. The amounts change every year: the studio’s scale is a starting value, to be checked on the official page.
How to use it in 3 steps for a project in Vaud
- Choose the station and enter the demand
Open the studio, choose the nearest Vaud station or enter your postcode, then enter the gas or oil consumption from the bill, or the energy reference area and the condition of the envelope. The studio proposes the smallest unit that covers the demand. - Place the unit and the neighbouring windows
In the noise radar tab, place the heat pump and each window of the neighbours’ noise-sensitive rooms, enter the sensitivity level, the night LWA from the manufacturer’s data sheet and the measures (enclosure, screen, timer). Aim for green status, with a 3 dB margin. - Add the solar system and print the sheet
Add the photovoltaic array by its output or by the roof area, the orientation and the electricity demand, then print the sheet: it repeats the formulas with your figures for the notification form and for the installer.
What the free studio does not do for a project in Vaud
The studio submits neither the heat pump notification, nor the solar notification, nor a subsidy application; it does not replace the certificate of compliance with noise protection requirements or the installer’s signed calculation. It does not know the sensitivity level of the plot or the heritage protection rules. Its Vaud scales come from its specification and must be checked.
With Soumissions, the output, the enclosure and the solar array go into the items of a bid, with the price database. With the ERP, you track the installation, the hours and the invoicing, and Portail chantier files the notification, the noise certificate and the photos by site.
Frequently asked questions
Does an outdoor air-to-water heat pump need a permit in Vaud?
For an existing building, Article 68c RLATC exempts it from a permit if it meets the cantonal conditions, including noise; it is then notified to the municipality with the cantonal form. Otherwise, a permit application is needed, with the DGE’s opinion.
Which noise value must be met at night?
The planning value in Annex 6 of the OPB: 45 dB(A) at night in sensitivity level II and 50 dB(A) in level III. The studio compares your Lr with this value; the plot’s level is shown in the municipal zoning plan.
Do rooftop solar panels have to be notified?
Yes: solar installations sufficiently adapted to the roof are exempt from authorisation but are notified to the municipality with the standard form under Article 68a RLATC. A protected building or cultural asset requires an authorisation.
Does the studio give the exact amount of Vaud subsidies?
No. It contains a starting scale taken from its specification, to be checked; amounts and conditions change every year. Submit the application on the cantonal portal before work begins.