Air/water heat pump and solar in the canton of Glarus: OPB noise, notification and energy act

In the canton of Glarus, an outdoor heat pump and solar panels are prepared with three questions: noise at the neighbour, the procedure and the cantonal energy framework.

Open the free studio →

Free, no account: your data stays in your browser. Indicative results, to be confirmed by the installer and the cantonal office.

The canton of Glarus regulates energy through its energy act (Energiegesetz, EnG) and an implementing ordinance on energy legislation (Vollzugsverordnung zur Energiegesetzgebung). According to a 2025 presentation by the canton, outdoor air/water heat pumps, previously subject to a building permit, move to a notification procedure when installed in a building zone, excluding cultural heritage and protected sites; indoor units in a building zone are exempt. The date of entry into force and the documents to enclose should be checked with the municipality and the cantonal energy office. The canton has three municipalities, which receive notifications and permit applications.

Even when notification is enough, the federal Noise Abatement Ordinance (OPB) applies: a new installation must respect the planning values and the precautionary principle. Art Construction's heat pump, noise and solar studio prepares this check in your browser: unit sizing according to SIA 384/201, noise radar using the method of Cercle Bruit implementation guide 6.21, photovoltaic yield and self-consumption. Glarus has no subsidy scale built into the studio: you enter the amount read on the cantonal portal yourself.

Worked example: air/water heat pump in a façade corner in Glarus

A valley house in the canton, heated with oil, with radiators. The studio has no reference station in the canton: the location is entered freely at 500 m, with a design temperature of −10 °C and an irradiation of 1,150 kWh/m² per year (example values, to be checked). The unit is placed in an inside corner, 5 m from the neighbouring window, in a mixed zone with sensitivity level III (example value).

Heat pump, noise and solar: Glarus example (example values)
StepInputCalculationResult
Heat demand2,000 l of oil, efficiency 0.852,000 × 10 × 0.85 ÷ 2,300 h7.39 kW
Unit selectedoutdoor air/water, radiators 55 °Csmallest model covering the demand8 kW model (7.1 kW at 55 °C)
Night-time noiseLWA 49 dB(A), corner, 5 m49 − 11 + 9 − 14.0 + 10 + 2Lr = 45.0 dB(A)
OPB comparisonDS III, nightplanning value 50 dB(A)margin of 5.0 dB
Solar6 kWp, east-west 15°6 × 1,150 × 0.96 × 0.845,564 kWh per year

Two thousand litres of oil at 10 kWh per litre and an efficiency of 0.85 give 17,000 kWh of useful heat; divided by 2,300 equivalent hours, this makes 7.39 kW. At −10 °C, the studio relates this demand to the reference point of its models and selects the 8 kW unit, which delivers 7.1 kW at 55 °C. Noise follows the formula of guide 6.21: 49 dB(A) night-time sound power, minus 11, plus 9 dB for an inside corner, minus 20 × log(5) = 14.0 dB, plus the corrections K1 at night (10) and K2 (2): Lr = 45.0 dB(A).

For sensitivity level III, the night-time planning value is 50 dB(A): the margin of 5.0 dB gives green status. The same location at level II (45 dB(A)) would be exactly at the limit: the precautionary principle would then call for moving the unit out of the corner. Six kWp on an east-west roof at 15° produce about 5,564 kWh per year (factor 0.96, performance ratio 0.84).

In a corner 5 m from the neighbouring window, the unit reaches 45.0 dB(A) at night: acceptable for DS III, right at the limit for DS II.

3 common mistakes for a heat pump and solar in Glarus

Thinking notification exempts from the noise check

The notification procedure lightens the form, not the substance: the OPB applies to every new installation. Keep the noise calculation and the manufacturer's data sheet, as the municipality may request them and a neighbour may object.

Ignoring the sensitivity level of the zone

The same location can be acceptable for DS III and borderline for DS II. The level is set by the municipal zoning plan: read it before choosing where to place the unit.

Forgetting protected properties

Cultural heritage and protected sites still require a permit, for the heat pump as for rooftop solar. Check the status of the building before promising the client a simple notification.

Using the studio in 3 steps: heat pump, noise and solar in Glarus

  1. Enter the location and the demand
    Choose “Other location”, enter the altitude, design temperature and irradiation of your site, then the oil consumption. The studio proposes the suitable model and flags oversizing.
  2. Test unit locations
    Place the unit and the neighbouring window on the plan, try façade, corner and free-standing positions, then compare the night-time Lr. An enclosure, a screen and silent mode can be added if the margin is small.
  3. Complete solar and print
    Add the panels, the household consumption and the subsidy amount read on the cantonal portal. Print the sheet and enclose it with the municipality's notification or permit form.

Open the free studio →

What the free version does not do for a project in Glarus

The studio submits no notification, permit or subsidy application, and replaces neither the official noise assessment nor the installer's calculation. It has no subsidy scale for Glarus and does not know the sensitivity level of the plot. Subsidy conditions are read in the funding conditions published by the canton; an application submitted before work starts is the usual rule, to be checked for your measure.

Soumissions takes the unit and panels into a quotation with the price database, the ERP tracks the hours and invoicing of the job, and Portail chantier files the noise dossier and the notification to share them with the client. See also the related pages, including the Geo-Scanner page for the canton of Glarus.

Frequently asked questions

Does an outdoor heat pump require a permit in the canton of Glarus?

According to the canton, outdoor air/water units in a building zone now fall under a notification procedure, except cultural heritage and protected sites. Check the date of entry into force and the documents required with your municipality.

Is a noise assessment needed with the notification?

The sources consulted do not say. The OPB applies in any case: preparing the calculation with the Cercle Bruit method and keeping it on file avoids unpleasant surprises in case of a complaint.

Are rooftop solar panels subject to a permit?

An installation sufficiently adapted to the roof, in a building or agricultural zone, is in principle declared by notification (Article 18a LAT). Façade, ground-mounted installations or those on cultural heritage still require a permit; municipalities publish a notification form.

When should the subsidy application be submitted?

In principle before work starts, according to the cantonal funding conditions. Amounts change: the studio does not set them, you enter the value read on the canton's portal.