The canton of Grisons regulates energy through its energy act (Energiegesetz des Kantons Graubünden, BEG) and its implementing provisions. For an outdoor air/water heat pump, the Office for Nature and Environment (ANU) points out that the unit can cause significant noise: the client or planner must prove compliance with the planning value through a noise assessment, usually with the Cercle Bruit declaration form, and the municipality checks this in the permit procedure. A borehole heat exchanger additionally requires approval from the municipality and the ANU. According to the canton, subsidy applications are submitted before work starts and before equipment is purchased.
Rooftop solar follows Article 18a of the federal Spatial Planning Act: an installation sufficiently adapted to the roof is subject to notification to the municipal building authority (Article 32a of the federal ordinance, taken over by the cantonal spatial planning ordinance). Art Construction's heat pump, noise and solar studio contains two reference stations in the canton, one in the valley and one in the mountains. It sizes the unit according to SIA 384/201, calculates noise with the method of Cercle Bruit guide 6.21 and estimates photovoltaic yield. It has no Grisons subsidy scale: you enter the official amount.
Worked example: renovated mountain chalet, ground-source or air/water
A renovated chalet in the Grisons with 200 m² of energy reference area, three occupants, underfloor heating. Studio mountain station: 1,560 m altitude, design temperature −20 °C, irradiation 1,500 kWh/m² per year. Two options: ground/water heat pump on a borehole, or outdoor air/water unit against the façade 10 m from the neighbouring window, sensitivity level II (example value).
| Step | Input | Calculation | Result |
|---|---|---|---|
| Heat demand | 200 m², renovated, 40 W/m² at −8 °C | 200 × 40 ÷ 1,000 × 40 ÷ 28 + 3 × 0.2 | 12.03 kW |
| Ground/water option | underfloor heating 35 °C | model covering 12.03 kW | 12 kW model (12.2 kW), no outdoor noise |
| Air/water option | façade, 10 m, LWA 51 dB(A) | 51 − 11 + 6 − 20 + 10 + 2 | Lr = 38.0 dB(A) |
| OPB comparison | DS II, night | planning value 45 dB(A) | margin of 7.0 dB |
| Solar | 10 kWp, south 30° | 10 × 1,500 × 1.12 × 0.84 | 14,112 kWh per year |
The floor-area method starts from a load of 40 W/m² at −8 °C for a renovated envelope, corrected by the temperature difference: (20 − (−20)) ÷ 28 = 1.43. Heating thus requires 11.43 kW, to which 0.2 kW per occupant is added for hot water: 12.03 kW. A borehole works on a stable source: the 12 kW ground/water model is sufficient, with no outdoor noise to assess. For air/water, the studio relates the demand to the reference point of its models and selects the 10 kW unit (9.7 kW at 35 °C), whose night-time sound power is 51 dB(A).
At 10 m from a window, against a façade: 51 − 11 + 6 − 20 × log(10) + 10 + 2 = 38.0 dB(A), i.e. 7 dB below the planning value. At altitude, stronger irradiation gives 14,112 kWh per year for 10 kWp facing due south at 30°. The choice between the two options depends on whether drilling is permitted, the location of the unit and snow, which the studio does not calculate.
The chalet needs about 12 kW: ground source removes the noise question, while air/water stays at 38.0 dB(A) at night 10 m from the neighbouring window.
3 common mistakes for a heat pump and solar in the Grisons
Keeping the lowland design temperature
At 1,500 m, the design temperature drops towards −20 °C. A calculation made with lowland values undersizes the unit: choose the mountain station or enter the value for your site.
Forgetting the ANU noise assessment
The municipality checks noise in the permit procedure. Without the Cercle Bruit declaration form or the manufacturer's data sheet, the file comes back: prepare it before submitting.
Ordering before the subsidy application
The Grisons energy act forbids starting work or buying equipment before the subsidy application is submitted. According to the canton's guidelines, an installation in a new building is not supported: check the conditions for the year.
Using the studio in 3 steps: heat pump, noise and solar in the Grisons
- Choose the right station
Take the valley or mountain station closest to your site, or enter the altitude and design temperature. Enter the floor area and envelope condition, or the current consumption. - Compare air/water and ground source
Change the heat pump type: the studio shows the output, the SCOP and, for air/water, the noise at the neighbour. For the borehole, it gives an indicative drilling length, to be validated by a specialist. - Add solar and print
Enter the panel output and orientation, then print the sheet and plan. Enclose them with the permit application or the municipal notification.
What the free version does not do for a project in the Grisons
The studio submits no application to the municipality, the ANU or the canton. It replaces neither the official noise form, nor the borehole study, nor the installer's calculation. It calculates neither the snow load on the panels nor access to the unit in winter, and it does not know the sensitivity level of the plot. It has no Grisons subsidy scale.
Soumissions takes the unit, the borehole and the panels into a quotation with the price database; the ERP tracks the job and invoicing; Portail chantier files the noise assessment and the notification to share them. The related pages point to the noise simulator, Pronovo support, subsidies by canton and the Geo-Scanner page for the Grisons.
Frequently asked questions
Is a noise assessment needed for an air/water heat pump in the Grisons?
Yes: according to the Office for Nature and Environment, the client or planner proves compliance with the planning value, usually with the Cercle Bruit declaration form. The municipality checks it in the permit procedure.
Does ground source avoid the noise check?
A ground/water heat pump has no noisy outdoor unit: the studio then assesses no outdoor noise. Drilling, however, requires approval from the municipality and the ANU.
Must rooftop solar panels be notified?
An installation sufficiently adapted to the roof is subject to notification to the municipal building authority. Installations on protected properties, on façades or on the ground still require a permit; some municipalities extend the notification procedure.
Is support available for a heat pump in a new building?
According to the cantonal guidelines consulted, no: support targets replacement in an existing building. Check the conditions for the year and submit the application before any order.