Basel-City regulates energy through its energy act (Energiegesetz, EnG) and its ordinance, which set what must be done when replacing an oil or gas heating system or a heating system more than 15 years old. Since the 2020 liberalisation, a heat pump installed indoors no longer needs approval and an outdoor unit is subject to notification; the noise assessment for outdoor units is made with the calculation tool of the noise protection division of the Office for Environment and Energy (AUE). Solar is notified to the building and hospitality inspectorate (Bau- und Gastgewerbeinspektorat) at least two weeks before work starts, using the official form; a permit is still required in a protection zone or on a listed building. Check current conditions with these offices.
The heat pump, noise and solar studio uses the Basel station (260 m, θe,norm −7 °C). It calculates the output from gas consumption, the noise in a courtyard corner and the effect of silent mode, then the solar yield. The cantonal scale is not built in: enter the amount read on the current programme, whose application is as a rule submitted before work starts.
Worked example: heat pump in an inner courtyard, normal and silent mode
A terraced house heated with gas, condensing boiler, 18,000 kWh GCV per year, hot water produced by the heat pump. Basel station. Unit in the corner of the courtyard, 5 m from the neighbouring window, mixed zone with sensitivity level III (example value); 52 dB(A) at night in normal mode, 47 dB(A) in silent mode according to the chosen data sheet.
| Quantity | Input | Studio calculation | Result |
|---|---|---|---|
| Current useful heat | 18,000 kWh GCV, condensing | 18,000 × 0.9 × 0.95 | 15,390 kWh/yr |
| Heat pump output | 2,300 h (hot water included) | 15,390 ÷ 2,300 | 6.69 kW |
| Lr night, normal mode | 52 dB(A), corner, 5 m | 52 − 11 + 9 − 13.98 + 12 | 48.0 dB(A) |
| Lr night, silent mode | 47 dB(A), same position | 47 − 11 + 9 − 13.98 + 12 | 43.0 dB(A) |
| Planning value DS III, night | OPB, annex 6 | comparison | 50 dB(A) |
| Photovoltaic yield | 6 kWp, east-west 15° | 6 × 1,150 × 0.96 × 0.84 | 5,564 kWh/yr |
The bill of 18,000 kWh GCV becomes 16,200 kWh net calorific value, then 15,390 kWh of useful heat with the 0.95 efficiency of a condensing boiler; over 2,300 hours, the heat pump must deliver 6.69 kW. In the courtyard corner, directivity adds 9 dB: 52 − 11 + 9 − 20 × log10(5) = 36.0 dB(A), then 48.0 dB(A) with K1 = 10 and K2 = 2. Below the 50 dB(A) value of level III, the margin is only 2 dB: orange status.
In silent mode, the night-time sound power level drops by 5 dB and the rating level falls to 43.0 dB(A), with a 7 dB margin. Silent mode also reduces the available output: check with the installer that it still covers the demand on cold nights. The 6 kWp facing east and west produce about 5,564 kWh per year on an urban flat roof.
In the courtyard corner, the heat pump reaches 48 dB(A) at night in normal mode; silent mode brings it down to 43 dB(A), below the 50 dB(A) of level III with a comfortable margin.
3 common pitfalls in Basel-City
Underestimating reflections in a courtyard
In a courtyard, walls reflect noise: the studio adds 9 dB in a corner against 3 dB in free field. A location that seemed discreet can be the noisiest on the plot.
Counting on silent mode without checking the output
Silent mode reduces noise but also heating output. A setting limited by a timer must be justified, and the heat pump must still cover the demand at design temperatures.
Installing solar in a protection zone without a permit
Notification to the building inspectorate does not apply in a protection zone or on a listed building, which are numerous in the old town. Check the status before ordering.
Using the studio in 3 steps in Basel-City
- Enter the gas bill
Choose the Basel station, enter the kWh GCV from the bill and tick the condensing boiler. Indicate whether the heat pump will produce hot water. - Draw the courtyard
Place the unit in the corner, the courtyard walls and each exposed neighbouring window. Compare normal mode and silent mode entered from the manufacturer's data sheet. - Prepare the notification
Print the sheet and export the plan, then prepare the official assessment with the AUE tool. Add solar and enter the cantonal subsidy by hand.
What the free version does not do
The studio submits no notification and replaces neither the AUE noise assessment tool nor the installer's calculation. It does not include the Basel scale and does not know the sensitivity level of the plot. See also the noise calculator page, the Pronovo simulator and the subsidy simulator by canton.
With Soumissions, the heat pump and solar go into the quotation; the ERP tracks the installation and invoicing; Portail chantier files the notification and the assessment for the client. The Geo-Scanner page for Basel-City locates the plot and its PLR cadastre (ÖREB).
Frequently asked questions
Does an outdoor heat pump require a permit in Basel-City?
Since 2020, an outdoor unit is subject to notification and an indoor heat pump no longer needs approval. The noise assessment for the outdoor unit remains mandatory.
How is the noise assessment prepared?
With the calculation tool published by the AUE noise protection division. The studio prepares the calculation using the Cercle Bruit method, but it is the cantonal tool that accompanies the notification.
How far ahead must solar be notified?
At least two weeks before work starts, with the official form of the building inspectorate. In a protection zone or on a listed building, a permit is required.
What does silent mode achieve?
A few decibels less at night according to the unit's data sheet, at the cost of reduced output. In the example, 5 dB less moves the status from orange to green.