Basel-Landschaft regulates energy through its energy act (Energiegesetz, EnG BL) of 16 June 2016, supplemented by a decree whose partial revision came into force on 1 October 2024. Since 1 July 2022, a heat pump installed outdoors, with a volume of up to 2 m³, in a building zone and outside a protection perimeter, needs no permit but must be notified to the cantonal building inspectorate (Bauinspektorat) 30 days before installation; larger units and cases in protected zones go through the ordinary permit. Rooftop solar in a building or agricultural zone is also notified 30 days before work starts; old town centres, site protection zones and listed monuments still require a permit. The canton publishes the Cercle Bruit implementation guide for heat pumps.
The heat pump, noise and solar studio uses the Basel station (260 m, θe,norm −7 °C). It calculates the output from the floor area and envelope condition, the noise of two units in cascade and the photovoltaic yield. No Basel-Landschaft subsidy scale is built in: enter the amount of the current cantonal programme, whose application is as a rule submitted before work starts.
Worked example: two-family house with two heat pumps in cascade
A two-family house from the 1990s, 200 m² of energy reference area, windows replaced, five occupants and hot water produced by the heat pumps. Basel station. Two identical units placed against the façade, 9 m from the neighbour's window, residential zone with sensitivity level II (example value), 49 dB(A) at night per unit.
| Quantity | Input | Studio calculation | Result |
|---|---|---|---|
| Heating load at θe | 200 m², 55 W/m² at −8 °C | 200 × 55 ÷ 1,000 × 27 ÷ 28 | 10.61 kW |
| Output with hot water | 5 occupants × 0.2 kW | 10.61 + 1.00 | 11.61 kW |
| Effect of the cascade | 2 identical units | 10 × log10(2) | +3.0 dB |
| Lr night | 49 dB(A), façade, 9 m | 49 + 3.01 − 11 + 6 − 19.08 + 12 | 39.9 dB(A) |
| Planning value DS II, night | OPB, annex 6 | comparison | 45 dB(A), margin 5.1 dB |
| Photovoltaic yield | 15 kWp, south 30° | 15 × 1,150 × 1.12 × 0.84 | 16,229 kWh/yr |
With a default load of 55 W/m² for an envelope from 1980 to 2000 and a design temperature of −7 °C, the load is 200 × 55 ÷ 1,000 × (20 + 7) ÷ 28 = 10.61 kW; hot water for five people adds 1 kW, i.e. 11.61 kW. Two identical units in cascade add 10 × log10(2) = 3.0 dB to the sound power level: 49 + 3.01 − 11 + 6 − 20 × log10(9) gives 27.9 dB(A), then 39.9 dB(A) with K1 = 10 and K2 = 2.
The margin of 5.1 dB below the planning value remains sufficient, but beware: each additional unit or each metre lost reduces it. The 15 kWp facing south produce about 16,229 kWh per year, a solid basis for two households and two heat pumps. The volume of each unit must stay within the 2 m³ limit for the notification procedure.
Two heat pumps totalling about 11.6 kW, 9 m from the neighbouring window, give 39.9 dB(A) at night, below the 45 dB(A) of level II.
3 common pitfalls in Basel-Landschaft
Exceeding 2 m³ without knowing it
The permit exemption applies to an outdoor heat pump of up to 2 m³. A large monobloc unit or an added enclosure can exceed this volume: the project then falls under the permit procedure. Measure the real volume, enclosure included.
Notifying too late
Notification to the building inspectorate is made 30 days before installation, for the heat pump as for solar. A job started without this period may be stopped.
Forgetting the effect of the cascade on noise
Two identical units make 3 dB more than one, three units nearly 5 dB. Calculate the noise with the real number of units, not with the data sheet of a single one.
Using the studio in 3 steps in Basel-Landschaft
- Enter the floor area and envelope
Choose the Basel station, enter the energy reference area, the condition of the envelope and the number of occupants. If one unit is not enough, the studio counts several identical units. - Check the noise of the cascade
Place the units and the neighbouring window; the studio adds the effect of the cascade. Keep at least 3 dB of margin below the planning value. - Prepare the notification
Add solar, enter the cantonal subsidy, print the sheet and export the plan. Enclose them with the notification, at least 30 days before installation.
What the free version does not do
The studio submits no notification and replaces neither the official noise assessment nor the installer's calculation. It does not measure the volume of the unit, does not include the Basel-Landschaft scale and does not know the sensitivity level of the plot. See also the noise calculator page and the subsidy simulator by canton.
With Soumissions, the units and solar go into the quotation; the ERP tracks the site and invoicing; Portail chantier files the notification, the assessment and the data sheets for the client. The Geo-Scanner page for Basel-Landschaft locates the plot and its zone.
Frequently asked questions
Is a permit needed for an outdoor heat pump in Basel-Landschaft?
No for a unit of up to 2 m³ in a building zone, outside a protection perimeter: a notification 30 days ahead is enough. Beyond that, or in a protected zone, a permit is required.
And for rooftop solar?
No permit in a building or agricultural zone, but a notification to the building inspectorate 30 days before work. Old town centres, protected sites and listed monuments still require a permit.
Why do two units make more noise?
Sound power levels add up logarithmically: two identical sources give 3 dB more than one. The studio adds this as soon as you indicate a cascade.
Does the studio know the cantonal subsidy?
Not for Basel-Landschaft: enter the amount read on the current programme. The application is as a rule submitted before work starts.