Free software · 100% in your browser · no data sent

Air/water heat pump and solar in the canton of Fribourg: noise and procedure

In Fribourg, municipalities now handle air/water heat pumps alone in the simplified procedure: the noise assessment must therefore be solid from the start.

Open the free studio →

Free, no account: your data stays in your browser. Indicative results, to be confirmed by the installer and the cantonal office.

The canton of Fribourg regulates energy through its energy act (LEn) and its implementing regulation, and building through the LATeC and its regulation (ReLATeC). According to a cantonal recommendation of September 2026, municipalities may handle air/water heat pumps alone in the simplified procedure, without forwarding the file to the noise section of the Environment Office (SEn); the “environment - heating” form indicates that an air/water heat pump is planned (Art. 85 and 86 ReLATeC). The exact list of documents should be checked with the municipality. Solar installations sufficiently adapted to roofs are notified to the municipality 30 days before work (Art. 87 para. 3 ReLATeC), using the cantonal notification form; cultural heritage and protected sites still require a permit.

The heat pump, noise and solar studio offers two Fribourg stations, Fribourg (640 m, θe,norm −8 °C) and Bulle (770 m, θe,norm −9 °C). It calculates the output from oil consumption, the night-time noise at the neighbour according to Cercle Bruit and the solar yield. For Fribourg, the studio contains a default cantonal scale, taken from its specification and to be checked against the current programme; the subsidy application is submitted before work starts.

Worked example: replacing an oil boiler in the canton

A house heated with oil, condensing boiler, 2,200 litres per year, hot water produced by the heat pump. Bulle station. Unit against the façade, 7 m from the neighbour's window, residential zone with sensitivity level II (example value), 49 dB(A) at night.

Output, night-time noise and solar (example values)
QuantityInputStudio calculationResult
Current useful heat2,200 l, condensing2,200 × 10 × 0.9220,240 kWh/yr
Heat pump output2,300 h (hot water included)20,240 ÷ 2,3008.80 kW
Night-time level Leq49 dB(A), façade, 7 m49 − 11 + 6 − 16.9027.1 dB(A)
Night-time rating level LrK1 10, K2 227.10 + 1239.1 dB(A)
Planning value DS II, nightOPB, annex 6comparison45 dB(A), margin 5.9 dB
Photovoltaic yield11 kWp, south 30°11 × 1,150 × 1.12 × 0.8411,901 kWh/yr

The 2,200 litres of oil provide 22,000 kWh, i.e. 20,240 kWh of useful heat with the 0.92 efficiency of a condensing boiler. Bulle is at 770 m, below the studio's 800 m threshold: it counts 2,300 full-load hours with hot water, hence 8.80 kW. For noise, 49 − 11 + 6 − 20 × log10(7) gives 27.1 dB(A), then 39.1 dB(A) with K1 = 10 and K2 = 2: the margin of 5.9 dB below 45 dB(A) is sufficient.

Since the municipality handles the file alone, the calculation must be easy to read: unit, distance, directivity and the window used appear on the exported plan. The 11 kWp facing south produce about 11,901 kWh per year. The studio also shows an estimate of the cantonal subsidy from its default Fribourg scale; the official amount is that of the programme in force at the time of submission.

A heat pump of about 8.8 kW 7 m from the neighbouring window stays at 39.1 dB(A) at night, below the 45 dB(A) of level II, and 11 kWp produce about 11,900 kWh per year.

3 common pitfalls in the canton of Fribourg

Submitting a file without a readable noise calculation

The municipality now handles the air/water heat pump alone in the simplified procedure. An incomplete assessment or one without a clear plan comes back with questions, which delays the job.

Notifying solar too late

A solar installation is notified to the municipality 30 days before work. A form submitted the day before installation does not respect this period.

Taking the studio's estimate for the official subsidy

The studio's Fribourg scale is a default value taken from its specification. Only the cantonal programme in force at the time of submission prevails, and the application comes before the work.

Using the studio in 3 steps in the canton of Fribourg

  1. Choose Fribourg or Bulle
    Select the nearest station, adjust the altitude, then enter the oil consumption and the condition of the boiler. The studio proposes the output and the model.
  2. Prepare the noise calculation
    Place the unit, the façade and the neighbouring window; note the rating level, the margin and the directivity used. Export the plan to enclose it with the municipal file.
  3. Check the subsidy and solar
    Add solar, check the studio's subsidy estimate against the current cantonal programme, then print the sheet before submitting the application.

Open the free studio →

What the free version does not do

The studio submits neither the environment-heating form, nor the solar notification, nor the subsidy application. It replaces neither the official noise assessment nor the installer's calculation, and its Fribourg scale is a default value to be checked. It does not know the sensitivity level of the plot. See also the noise calculator page and the subsidy simulator by canton.

With Soumissions, the heat pump and solar go into the quotation; the ERP tracks the site and invoicing; Portail chantier files the municipal dossier and the data sheets for the client. The Geo-Scanner page for the canton of Fribourg locates the plot and its PLR cadastre (ÖREB).

Frequently asked questions

Who handles an air/water heat pump in the canton of Fribourg?

According to the cantonal recommendation of September 2026, the municipality may handle the air/water heat pump alone in the simplified procedure, without forwarding the file to the SEn noise section. Check your municipality's practice and list of documents.

Which form indicates the heat pump?

The “environment - heating” form indicates that an air/water heat pump is planned, in connection with Art. 85 and 86 ReLATeC. The municipality specifies the other documents.

How are solar panels notified?

With the cantonal notification form, submitted to the municipality 30 days before work (Art. 87 para. 3 ReLATeC). Cultural heritage and protected sites still require a permit.

Is the subsidy amount shown by the studio official?

No. The studio contains a default scale for Fribourg, taken from its specification: the official amount is that of the programme in force at the time of submission, before work starts.