Since 1 January 2025, the canton of Valais has applied its new energy act of 8 September 2023 (LcEne) and its ordinance of 20 March 2024 (OcEne). For an air-to-water or air-to-air heat pump, according to the cantonal page of the environment department, the notification procedure is only open to the replacement of an installation used mainly for space heating or hot water; other projects follow the ordinary building permit procedure. The canton publishes criteria for notification and for a simplified noise assessment (sensitivity level, sound power, minimum distance to the receiver), a simplified notification form and the Cercle Bruit form under implementation guide 6.21. Solar installations adapted to the roof fall under Article 18a LAT and Article 32a of the federal ordinance: as a rule a notification to the municipality, with exceptions for cultural monuments and protected sites.
The Art Construction heat pump, noise and solar studio offers two Valais stations: a lowland one (500 m, θe = −9 °C) and a mountain one (1,500 m, θe = −16 °C, irradiation of 1,550 kWh/m²). Above 800 m, it uses more full-load heating hours. Tab 1 sizes the air-to-water or ground-source heat pump according to SIA 384/201; for a geothermal probe, there is no outdoor noise to assess. Tab 3 estimates the solar yield, which is very favourable at altitude. For Valais, the studio contains a cantonal scale taken from its specification: starting values to be checked.
Worked example: an electrically heated chalet switching to a ground-source heat pump in Valais
A chalet at 1,500 m (the studio’s mountain station, θe = −16 °C, irradiation of 1,550 kWh/m² per year), currently heated by direct electric radiators, hot water included. Replacement with a geothermal-probe heat pump and 6 kWp of panels facing due south. Example values.
| Item | Value | Calculation |
|---|---|---|
| Current heating electricity | 14,000 kWh/year | Bill, efficiency 1 |
| Full-load hours at altitude | 2,500 h | Heating and hot water above 800 m |
| Ground-source heat pump output | 5.60 kW | 14,000 ÷ 2,500 |
| Outdoor noise | None | Ground-source heat pump |
| Solar yield, 6 kWp south 30° | 8,749 kWh/year | 6 × 1,550 × 1.12 × 0.84 |
With direct electric heating, the useful heat equals the electricity consumed (efficiency 1): 14,000 kWh per year. Above 800 m, the studio uses 2,500 full-load hours for heating and hot water, hence 5.60 kW. For a ground-source heat pump, the studio does not raise the output towards −7 °C: the probe works on a stable source. The probe length is then calculated in the same tab, to be confirmed by a geologist and according to the drilling authorisation.
A ground-source heat pump has no outdoor unit: the studio assesses no noise at the neighbour’s. In the lowlands, an air-to-water heat pump of 53 dB(A) at night, mounted on the façade 8 m from a neighbouring window, would give Lr = 53 − 11 + 6 − 18.1 + 12 = 41.9 dB(A), below the night value of 45 dB(A) in sensitivity level II. On the chalet roof, 6 kWp facing due south at 30° (factor 1.12, overall efficiency 0.84) produce 8,749 kWh per year.
At altitude, a 5.6 kW ground-source heat pump replaces the electric heating with no outdoor noise, and 6 kWp of solar produce about 8,750 kWh per year.
3 common mistakes with a heat pump or solar in Valais
Notifying a heat pump that replaces nothing
According to the cantonal page, the notification covers the replacement of an existing heating or hot-water installation. A new building or a project outside these criteria follows the ordinary permit procedure: check with the municipality before submitting.
Keeping the lowland temperature for a chalet
At 1,500 m, the design temperature drops to −16 °C in the studio, against −9 °C in the lowlands. A unit chosen with the lowland value may be too small: choose the nearest station at altitude or enter the real altitude.
Forgetting the drilling authorisation
The geothermal probe requires a water protection authorisation, whether or not the heat pump is notified. Check the cantonal map of drilling zones before comparing ground-source and air-to-water.
How to use it in 3 steps for a project in Valais
- Choose the station according to altitude
Open the studio and choose the nearest lowland or mountain Valais station, or enter the real altitude. Then enter the current consumption or the energy reference area. - Compare air-to-water and ground-source
Test an air-to-water heat pump with the noise radar (neighbours, sensitivity level, night LWA), then a ground-source heat pump with the probe length. Keep the solution that meets the noise requirements and that drilling allows. - Add the solar system and print
Add the photovoltaic array, read the yield and the self-consumption, then print the sheet for the notification, the Cercle Bruit form and the installer.
What the free studio does not do for a project in Valais
The studio submits neither the notification, nor the permit application, nor the subsidy application, and it does not replace the signed Cercle Bruit form or the drilling study. It knows neither the sensitivity level of the plot nor the water protection zones. Its Valais scale comes from its specification and must be checked; subsidies are as a rule requested before work begins.
With Soumissions, the unit, the probe and the solar array become bid items with the price database. The ERP tracks the installation, the hours and the invoicing, and Portail chantier files the notification, the forms and the photos by site.
Frequently asked questions
Can an air-to-water heat pump simply be notified in Valais?
According to the cantonal page, notification is open to the replacement of an installation used mainly for heating or hot water, with noise criteria. Other cases follow the ordinary building permit procedure.
Which Valais law applies to energy?
The energy act of 8 September 2023 (LcEne) and its ordinance of 20 March 2024 (OcEne), in force since 1 January 2025. Check the version in force in the cantonal statute book.
Is a noise certificate needed for a ground-source heat pump?
Not for outdoor noise: a ground-source heat pump has no unit outside. The studio therefore assesses no noise at the neighbour’s, but the probe requires a drilling authorisation.
Do solar panels on a chalet need authorisation?
Installations sufficiently adapted to the roof are as a rule notified to the municipality under Article 18a LAT; a cultural monument or protected site requires an authorisation. Check with the municipality.