The canton of Obwalden regulates energy in buildings through its energy act (Energiegesetz) of 30 September 2016 and through implementing provisions on energy use in buildings, attached to the building act (Baugesetz). Since 1 July 2024, the cantonal government has simplified certain procedures: an air-to-water heat pump placed inside a building outside the building zone no longer needs a permit, a notification to the municipality using the building notification form is enough, and solar installations on façades in business zones also go through a notification. For a heat pump installed outdoors, in front of a house in the building zone, the applicable rule is to be confirmed with the municipality: in Switzerland, an outdoor unit is in principle still subject to authorisation.
The Art Construction heat pump, noise and solar studio prepares this file in your browser. It estimates the unit’s output from your current consumption or from the heated area, calculates the night-time rating level Lr at the neighbour’s window using the Cercle Bruit method and compares it with the planning value of the Noise Abatement Ordinance (OPB), then estimates the yield of your photovoltaic panels. It submits nothing: the official noise certificate and the forms still have to be handed to the municipality.
Worked example: heat pump and solar for a house at altitude in Obwalden
A 1975 house heated with oil, at 850 m on the slope of an Obwalden valley, in a residential zone with noise sensitivity level II. The location is entered freely in the studio: altitude 850 m, design temperature −11 °C, irradiation 1,250 kWh/m² per year. All these values are examples to be checked.
| Item | Input | Calculation | Result |
|---|---|---|---|
| Oil consumed (3-year average) | 2,000 l per year | 2,000 × 10 kWh × 0.85 ÷ 2,500 h | 6.8 kW of demand |
| Output to guarantee at −7 °C (radiators 55 °C) | θe −11 °C | 6.8 × 27 ÷ 31 | 5.92 kW |
| Template selected by the studio | outdoor air-to-water | 7.1 kW at 55 °C | night LWA 49 dB(A) |
| Level at the neighbour’s window, at night | 8 m, against a façade | 49 − 11 + 6 − 18.06 | Leq 25.9 dB(A) |
| Night-time rating level | K1 10 + K2 2 | 25.9 + 12 | Lr 37.9 dB(A) for VP 45 |
| Rooftop photovoltaics | 20 modules, 9.0 kWp, south 30° | 9.0 × 1,250 × 1.12 × 0.84 | 10,584 kWh per year |
The studio converts the oil into useful heat: 2,000 litres × 10 kWh × efficiency of 0.85 = 17,000 kWh. Above 800 m, it divides by 2,500 full-load hours (domestic hot water included): 6.8 kW. It then brings this demand back to the unit’s test conditions (air at −7 °C): 6.8 × 27 ÷ 31 = 5.92 kW, and selects the smallest template that delivers at least this output at 55 °C. For noise, it starts from the night-time sound power, 49 dB(A), subtracts 11 dB, adds 6 dB for a unit against a façade, subtracts 20 × log(8) = 18.06 dB for distance, then adds the night correction K1 (10 dB) and K2 (2 dB).
With 37.9 dB(A) against a planning value of 45 dB(A) in level II, the margin is 7.1 dB: the status is green. For solar, 20 modules of 0.45 kWp give 9.0 kWp, and 9.0 × 1,250 × 1.12 (south 30° orientation) × 0.84 (system efficiency) = 10,584 kWh per year. These figures prepare the discussion with the installer; they replace neither the installer’s technical data sheet nor the signed noise certificate.
A 7 kW unit is enough for this house, with a 7 dB margin below the night-time planning value at the neighbour’s window.
3 common mistakes before installing a heat pump in Obwalden
Believing the 2024 simplification covers every unit
The permit-free notification introduced in 2024 targets specific cases, such as a heat pump placed inside a building outside the building zone. An outdoor unit in front of a village house follows another rule: ask the municipality which procedure applies before ordering.
Using the lowland temperature for a house at altitude
At 850 m, the design temperature and the full-load hours change. A unit chosen with lowland values may lack output in very cold weather. Enter the altitude and the local temperature in the studio and have them confirmed by the installer.
Starting work before submitting the subsidy application
Cantonal support programmes generally require the application to be submitted before work begins. A site started too early can lose the subsidy: check the rule and the form on the canton’s official portal.
How to use it in 3 steps for a house in Obwalden
- Enter the location and the heat demand
Choose the nearest reference station or a free entry with the altitude and the design temperature. Enter your oil, gas or electricity consumption, or the heated area and the condition of the building. - Place the unit and the neighbouring windows
In the noise radar, place the unit, its position (free-standing, against a façade, in a corner) and the neighbours’ windows with their sensitivity level. Read the night Lr and the margin, then test silent mode or an enclosure. - Add the solar system and print the sheet
Enter the number of modules and the orientation, read the yield and the self-consumption. For Obwalden cantonal subsidies, enter the amount stated by the canton yourself, then print the sheet or export the CSV.
What the free studio does not do in Obwalden
The studio does not know the noise sensitivity level of your plot, which is set by the municipal zoning plan: enter it after checking. It submits no notification, no permit application and no subsidy application, and it replaces neither the official noise certificate nor the installer’s calculation. It includes no subsidy scale for Obwalden: the amount is entered by hand. See also the studio’s noise calculator and the Geo-Scanner page for Obwalden for the zone and the plot.
Portail chantier files the noise certificate, forms and sheets by site and shares them with the client. Soumissions takes the output and the quantities into the items of your bid; the Art Construction ERP tracks the installation, the hours and your company’s invoicing.
Frequently asked questions
Is a permit needed for an outdoor heat pump in Obwalden?
An outdoor unit is in principle still subject to authorisation in Switzerland. The permit-free notification introduced in 2024 targets specific cases, such as units placed indoors outside the building zone. The municipality states the procedure that applies to your plot.
Which noise certificate should be attached to the file?
The noise certificate for an air-to-water heat pump is generally prepared with the Cercle Bruit method, using the sound power from the data sheet. The studio gives an estimate; the official form requested by the municipality still has to be completed.
Do rooftop solar panels need a permit?
Under Article 18a of the Spatial Planning Act (LAT), an installation sufficiently adapted to the roof, in a building or agricultural zone, only requires a notification. Cultural monuments and protected sites are exceptions. The form of the notification is checked with the municipality.
Does the studio know the amount of Obwalden subsidies?
No. It includes no scale for Obwalden: enter the amount published by the canton. The federal Pronovo one-off payment is estimated. Submit the cantonal application before work begins.