Costing specifics for CFC 213: Structural steelwork
CFC 213 covers workshop fabrication and on-site erection of load-bearing steel structures, including frames, bolted or welded connections and the associated corrosion-protection treatments. The Studio prices this trade with the finishing-trades profile, as an indicative and editable basis: check the collective agreement of your sector. The Studio’s default measurement unit is kg; the figures below are those of the Studio’s latest update, with Vaud as the starting canton.
For structural steelwork, measurement is based mainly on theoretical weight in kg, calculated from the approved shop drawings, or per piece for complex prefabricated elements. Connectors, specific anchorage parts and fixing plates are often shown as separate items or included in the erection lump sum according to the CAN standard item catalogue. Surface treatments such as galvanising or powder coating may also be measured per m². Define clearly how extra lengths and weld seams are taken into account, to avoid disputes at the final account.
| Item | Value in the Studio |
|---|---|
| CFC code | 213 |
| Title | Structural steelwork |
| Reference collective agreement | Studio finishing-trades profile (indicative) |
| Default measurement unit | kg |
| VAT applied | 8.1% |
Items often forgotten in a quote for structural steelwork
- Hire of heavy lifting plant or mobile elevating work platforms for difficult access
- Touching up the anti-corrosion paint on site after welding operations
- Setting-out templates and anchor bolts cast into the structural work
- Specific detailed design studies, engineer’s calculation notes and detailed shop drawings
- Special transport for very long steel sections or oversized parts
Neighbouring trades
A building site involves several trades in succession, and each line of a quote carries its own CFC code: you can therefore combine several trades in a single document. Here are the other Studio codes attached to the same cost profile, with their default unit.
| CFC | Title | Default unit | Page |
|---|---|---|---|
| 214 | Carpentry & timber structures | m² | Quote CFC 214 |
| 221 | Joinery & windows | pc | Quote CFC 221 |
| 222 | Sheet-metal work | m² | Quote CFC 222 |
| 224 | Roofing & waterproofing | m² | Quote CFC 224 |
| 226 | Rendering & façade insulation | m² | Quote CFC 226 |
| 228 | Shutters & blinds | pc | Quote CFC 228 |
| 271 | Plastering & drywall | m² | Quote CFC 271 |
| 272 | Metal construction & locksmith work | pc | Quote CFC 272 |
| 273 | Interior joinery | pc | Quote CFC 273 |
| 281 | Floor coverings (tiling, parquet) | m² | Quote CFC 281 |
| 282 | Wall coverings & wall tiling | m² | Quote CFC 282 |
| 285 | Painting & wallpapering | m² | Quote CFC 285 |
| 287 | Final site cleaning | m² | Quote CFC 287 |
SIA 118 clauses, retention and SUVA safety
SIA standard 118 governs the contractual relationship between the client and the steelwork contractor. It organises the formal acceptance of the work, the rules on notification of defects, the two-year defects notification period and the precise rules for settlement according to actual measurement. Remember that this standard only takes effect if your contract for work and services or the accepted offer expressly declares it applicable between the parties.
SIA 118 as contractual basis
Tick box (unticked by default).
SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.
Asbestos and pollutants
Ticked by default.
Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).
Rise in material prices
Ticked by default.
Reservation for increases in material prices according to the KBOB indices in force.
Pricing method
Your choice, when printing.
Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).
Retention
On monthly interim payments and on the final account, the client often applies a retention to cover any defects in execution. In our tool, you can adjust this retention from 0 to 10% of the value of the work. Depending on the clauses of the contract, the sum retained is released on the agreed date or may be replaced by a bank performance guarantee. In the Studio’s copilot, the retention (SIA 118) can be set to 0, 5 or 10% of the total incl. VAT, with 10% as the default; cash discount and retention reduce what you actually collect, whereas the discount and the pro-rata account reduce the quote itself.
Safety: what SUVA accident insurance costs
Occupational accident insurance (SUVA) is paid entirely by the employer: 3.5% of gross pay for the Finishing trades CCT-SOR profile in the Studio. For an employee earning CHF 6'050 a month, that is CHF 211.75 a month at your expense, before a single hour has been worked. This premium is part of the 25% of charges that the Studio builds into your daywork rate.
Daywork and profitability: the real cost of one hour of structural steelwork
The most common trap: invoicing on the basis of the hourly wage. An employee with the “Experienced qualified tradesperson (class A)” profile earns CHF 6'050 a month, i.e. CHF 34.38 over 176 paid hours. Once charges of 25.8% (Vaud) and CHF 595 of monthly expenses (meals, travel, equipment) are added, and the result is divided by the 135 genuinely productive hours, one hour costs CHF 60.78, before overheads and margin. You pay for every hour, but you invoice only part of them.
| Step | Hours |
|---|---|
| Paid hours (176 h × 12 months) | 2'112 |
| Holidays (25 days) | −212 |
| Public holidays (9 days) | −76 |
| Sickness / accident absences (average) | −68 |
| Depot preparation, loading, travel and bad weather | −136 |
| Productive hours used by the Studio | 1'620 |
How to read this table. Start from the 2'112 paid hours and take away holidays, public holidays, absences and time spent at the depot, loading and travelling: 1'620 billable hours remain, i.e. 77% of paid time.
When to invoice on a daywork basis
Unforeseen adaptation work on site, additional openings drilled in the masonry or changes ordered by site management are generally invoiced as daywork. Make sure the daywork sheets are signed on site every day or every week. In addition to the hourly rate of the erectors, invoice the unforeseen steel supplies, welding consumables and travel in accordance with the terms laid down in the contract.
| Profile | Average gross monthly pay | Daywork rate |
|---|---|---|
| Finishing trades foreman (CCT-SOR) | 6'750 CHF | 106.00 |
| Experienced qualified tradesperson (class A) | 6'050 CHF | 96.00 |
| Recently qualified tradesperson (1st to 3rd year after diploma) | 5'500 CHF | 88.00 |
| Skilled worker / federal certificate holder (class B) | 5'300 CHF | 85.00 |
| Finishing trades assistant (class C) | 4'850 CHF | 79.00 |
How to read this table. Vaud is the reference canton (coefficient 0%). Gross monthly pay is the average wage for the profile; the daywork rate is the hourly rate to invoice, excluding VAT. In another canton, the daywork rate is multiplied by the regional coefficient: the “Experienced qualified tradesperson (class A)” profile goes from CHF 96.00/h in Vaud to CHF 107.50/h in Geneva (+12%). See the page for the canton of Geneva.
Frequently asked questions about quotes for structural steelwork (CFC 213)
How should workshop and site costs be broken down in structural steelwork?
The pricing should be separated into two distinct phases: workshop fabrication, comprising cutting, drilling, assembly and surface treatment, then the site phase with transport, lifting and erection. This distinction makes it easier to adjust the costs to the complexity of the access and to apply the appropriate rates for the erectors and the lifting equipment.
Which collective agreement applies to my workshops and erection teams?
By default the Studio offers an indicative profile taken from the finishing trades, which is fully editable. Locksmith and metal construction work may fall under a collective labour agreement specific to the sector or under particular cantonal provisions. It is up to you to check with your trade association or the competent joint committee the pay scales and working conditions in force for your staff.
How should changes in the price of steel between offer and execution be handled?
As the price of merchant steel fluctuates rapidly, it is prudent to include in your quote a price-revision clause based on the sector indices, or to limit the period of validity of your offer. You can also agree with the client on early procurement of the raw material as soon as the order is signed.
Which ancillary safety services are generally worth including in the offer?
According to the SUVA directives and the OTConst, the erection of load-bearing elements requires adequate collective protection. Allow in your tender for the cost of fall-arrest nets under the structure, temporary guard rails fixed to the purlins or the use of compliant elevating work platforms. If these measures are not covered by the general contractor, mention them expressly.
From quote to site
Studio Devis Suisse is free and is enough for a one-off quote. When your quotes multiply, two tools take over where the Studio stops: the full price list to cost faster, then site tracking to check the real margin, hour after hour.
The same trade in the 26 cantons
The regional coefficient, the charges and the family allowances change from one canton to another: open the page for the canton of your site to see the daywork rate and the charges that apply there.
- Vaud (VD)
- Geneva (GE)
- Valais (VS)
- Fribourg (FR)
- Neuchâtel (NE)
- Jura (JU)
- Bern (BE)
- Zurich (ZH)
- Zug (ZG)
- Basel-Stadt (BS)
- Basel-Landschaft (BL)
- Aargau (AG)
- Solothurn (SO)
- Lucerne (LU)
- Schwyz (SZ)
- Nidwalden (NW)
- Obwalden (OW)
- Uri (UR)
- St. Gallen (SG)
- Thurgau (TG)
- Schaffhausen (SH)
- Appenzell Ausserrhoden (AR)
- Appenzell Innerrhoden (AI)
- Glarus (GL)
- Graubünden (GR)
- Ticino (TI)