3D rendering of a street lined with apartment buildings, from daytime to dusk – quote template for façade work (CFC 226) in Switzerland

Trade CFC 226 · Finishing trades CCT-SOR · indicative profile

Quote template for façade work (CFC 226): SIA costing, daywork rates and QR-bill deposit

Price your items per m², set your daywork rate, protect your margin and issue a quote ready to sign, with a SIX QR-bill for the deposit.

CFC 226 covers rendered external wall insulation work, the application of base and finishing renders, the sealing junctions at the reveals and the erection of façade scaffolding. In Vaud, the employer contributions used are 25.8% of gross pay, plus CHF 595 of monthly expenses and only 135 productive hours out of 176 paid. The Studio builds in these reference values so that your unit prices and your daywork rate cover your real costs, before VAT of 8.1% and the deposit by QR-bill.

Studio Devis SuisseSIA & QR-bill editor · Construction companies
CHF 0 · No account
  • A4 PDF ready to sign
  • SIX QR-bill built in
  • 100% in the browser

Free manual entry · 14’045 ACIP prices & cantons in Soumissions Pro →

Costing specifics for CFC 226: Rendering & façade insulation

CFC 226 covers rendered external wall insulation work, the application of base and finishing renders, the sealing junctions at the reveals and the erection of façade scaffolding. The Studio prices this trade with the finishing-trades profile, as an indicative and editable basis: check the collective agreement of your sector. The Studio’s default measurement unit is m²; the figures below are those of the Studio’s latest update, with Vaud as the starting canton.

Measurement is based mainly on the m² for the main areas of insulation and rendering, in accordance with the guidelines of the CAN standard item catalogue. Reveals, drip edges, plinth strips and corner profiles are measured per linear metre or per piece. The rules on measuring openings as solid apply to window openings according to the customs of the sector. To avoid any dispute with site management at the final account, define precisely in your offer the deductions for openings that you have applied and detail separately the treatment of reveals and lintels.

Data sheet for item CFC 226
ItemValue in the Studio
CFC code226
TitleRendering & façade insulation
Reference collective agreementStudio finishing-trades profile (indicative)
Default measurement unitm²
VAT applied8.1%

Items often forgotten in a quote for façade work

Neighbouring trades

A building site involves several trades in succession, and each line of a quote carries its own CFC code: you can therefore combine several trades in a single document. Here are the other Studio codes attached to the same cost profile, with their default unit.

Other CFC codes with the same profile in the Studio
CFCTitleDefault unitPage
213Structural steelworkkgQuote CFC 213
214Carpentry & timber structuresm²Quote CFC 214
221Joinery & windowspcQuote CFC 221
222Sheet-metal workm²Quote CFC 222
224Roofing & waterproofingm²Quote CFC 224
228Shutters & blindspcQuote CFC 228
271Plastering & drywallm²Quote CFC 271
272Metal construction & locksmith workpcQuote CFC 272
273Interior joinerypcQuote CFC 273
281Floor coverings (tiling, parquet)m²Quote CFC 281
282Wall coverings & wall tilingm²Quote CFC 282
285Painting & wallpaperingm²Quote CFC 285
287Final site cleaningm²Quote CFC 287

SIA 118 clauses, retention and SUVA safety

SIA standard 118 governs the arrangements for acceptance of the work and organises settlement by measurement in accordance with good practice. It establishes a two-year defects notification period during which the contractor may be called upon to correct the defects reported by the client, making it easier to handle the notification of defects as soon as the façade work is finished. This standard, which protects both parties, only applies if your contract for work and services expressly declares it applicable.

SIA 118 as contractual basis

Tick box (unticked by default).

SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.

Asbestos and pollutants

Ticked by default.

Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).

Rise in material prices

Ticked by default.

Reservation for increases in material prices according to the KBOB indices in force.

Pricing method

Your choice, when printing.

Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).

Retention

On monthly interim payments and on the final account, a retention is frequently agreed with the client. Studio Devis Suisse lets you adjust this retention from 0 to 10% on your invoices. The sum retained remains blocked to cover proper execution of the façades, before being released on the agreed date or replaced by an equivalent bank guarantee in accordance with the stipulations of the contract. In the Studio’s copilot, the retention (SIA 118) can be set to 0, 5 or 10% of the total incl. VAT, with 10% as the default; cash discount and retention reduce what you actually collect, whereas the discount and the pro-rata account reduce the quote itself.

Safety: what SUVA accident insurance costs

Occupational accident insurance (SUVA) is paid entirely by the employer: 3.5% of gross pay for the Finishing trades CCT-SOR profile in the Studio. For an employee earning CHF 6'050 a month, that is CHF 211.75 a month at your expense, before a single hour has been worked. This premium is part of the 25% of charges that the Studio builds into your daywork rate.

Daywork and profitability: the real cost of one hour of façade work

The most common trap: invoicing on the basis of the hourly wage. An employee with the “Experienced qualified tradesperson (class A)” profile earns CHF 6'050 a month, i.e. CHF 34.38 over 176 paid hours. Once charges of 25.8% (Vaud) and CHF 595 of monthly expenses (meals, travel, equipment) are added, and the result is divided by the 135 genuinely productive hours, one hour costs CHF 60.78, before overheads and margin. You pay for every hour, but you invoice only part of them.

From paid time to productive time (per employee and per year)
StepHours
Paid hours (176 h × 12 months)2'112
Holidays (25 days)−212
Public holidays (9 days)−76
Sickness / accident absences (average)−68
Depot preparation, loading, travel and bad weather−136
Productive hours used by the Studio1'620

How to read this table. Start from the 2'112 paid hours and take away holidays, public holidays, absences and time spent at the depot, loading and travelling: 1'620 billable hours remain, i.e. 77% of paid time.

When to invoice on a daywork basis

Unforeseeable work, such as making good damaged masonry discovered after hacking off, or one-off repairs requested by site management, must be invoiced as daywork. Write up your daywork sheets every day and have them signed without delay by the client. In addition to labour, detail the specific consumables, the mechanised spraying equipment and the travel allowances in accordance with your contract.

Reference daywork rates in the Studio, Finishing trades CCT-SOR (Vaud, CHF/h excl. VAT)
ProfileAverage gross monthly payDaywork rate
Finishing trades foreman (CCT-SOR)6'750 CHF106.00
Experienced qualified tradesperson (class A)6'050 CHF96.00
Recently qualified tradesperson (1st to 3rd year after diploma)5'500 CHF88.00
Skilled worker / federal certificate holder (class B)5'300 CHF85.00
Finishing trades assistant (class C)4'850 CHF79.00

How to read this table. Vaud is the reference canton (coefficient 0%). Gross monthly pay is the average wage for the profile; the daywork rate is the hourly rate to invoice, excluding VAT. In another canton, the daywork rate is multiplied by the regional coefficient: the “Experienced qualified tradesperson (class A)” profile goes from CHF 96.00/h in Vaud to CHF 107.50/h in Geneva (+12%). See the page for the canton of Geneva.

Frequently asked questions about quotes for façade work (CFC 226)

How do you secure the profitability of a job in rendering & façade insulation?

Sound profitability rests on an exact survey of the developed surfaces and on anticipating the access constraints. Take into account the real condition of the substrate, the type of anchors required by the masonry, the complexity of the render colours and the seasonal weather, which influences drying times. Also check the collective labour agreement applicable to your company in order to calibrate your hourly costs correctly.

Who is responsible for the façade scaffolding in the quote?

The scaffolding may be supplied by the façade contractor or made available by the structural work contractor, depending on how the site is organised. If you include it in your quote, provide a clear item for erection, dismantling and protective nets in accordance with the safety rules in force, as well as a weekly rate for any extension of the hire beyond the agreed period.

What precautions should be taken for the junctions with the joinery?

The junctions between the external wall insulation and the window frames are the points most sensitive to infiltration. It is often useful to provide decoupled junction profiles that are resistant to driving rain. These technical elements must be shown as separate items per linear metre in the offer, so that their purchase and installation cost is not diluted in the overall surface area.

How do you manage interruptions to the works due to bad weather?

The application of mortars and mineral renders requires precise ranges of temperature and humidity. State expressly in your special conditions that periods of frost or extreme heat suspend the completion deadlines without penalty. The temporary protection of wall heads against rain during stoppages must be priced or reserved in the contract.

From quote to site

Studio Devis Suisse is free and is enough for a one-off quote. When your quotes multiply, two tools take over where the Studio stops: the full price list to cost faster, then site tracking to check the real margin, hour after hour.

The same trade in the 26 cantons

The regional coefficient, the charges and the family allowances change from one canton to another: open the page for the canton of your site to see the daywork rate and the charges that apply there.

Sources and limits. Reference values of Studio Devis Suisse (as at 23.11.2026), CN and CCT-SOR collective agreements, weighted average contribution rates. Indicative only: check the rates of your compensation fund and the collective agreement that applies to your company.