Quote template for windows and joinery (CFC 221): SIA costing, daywork rates and QR-bill deposit

Price your items per piece, set your daywork rate, protect your margin and issue a quote ready to sign, with a SIX QR-bill for the deposit.

CFC 221 encompasses the supply and installation of windows, entrance doors and French windows, including the hardware, airtight sealing and the perimeter sealing junctions with the façade. In Vaud, the employer contributions used are 25.8% of gross pay, plus CHF 595 of monthly expenses and only 135 productive hours out of 176 paid. The Studio builds in these reference values so that your unit prices and your daywork rate cover your real costs, before VAT of 8.1% and the deposit by QR-bill.

Studio Devis SuisseSIA & QR-bill editor · Construction companies
CHF 0 · No account
  • A4 PDF ready to sign
  • SIX QR-bill built in
  • 100% in the browser

Free manual entry · 14’045 ACIP prices & cantons in Soumissions Pro →

Costing specifics for CFC 221: Joinery & windows

CFC 221 encompasses the supply and installation of windows, entrance doors and French windows, including the hardware, airtight sealing and the perimeter sealing junctions with the façade. Reference collective agreement in the Studio: CCT-SOR (collective agreement for the finishing trades of French-speaking Switzerland). The Studio’s default measurement unit is pc; the figures below are those of the Studio’s latest update, with Vaud as the starting canton.

In measurement according to the CAN standard item catalogue, the piece is the usual unit for standardised windows, door sets and sliding units. The surface area in m² is sometimes used for specific glazing or joinery façades. Linear elements such as flashings, window sills, sealing tapes and pre-compressed joint tapes are measured per linear metre. Making good reveals, heavy fixings or lifting plant are counted separately or as a lump sum. To avoid discrepancies in the account with site management, define precisely the order of measurement and the limits of the junctions from the offer stage.

Data sheet for item CFC 221
ItemValue in the Studio
CFC code221
TitleJoinery & windows
Reference collective agreementCCT-SOR (collective agreement for the finishing trades of French-speaking Switzerland)
Default measurement unitpc
VAT applied8.1%

Items often forgotten in a quote for windows and joinery

Neighbouring trades

A building site involves several trades in succession, and each line of a quote carries its own CFC code: you can therefore combine several trades in a single document. Here are the other Studio codes attached to the same cost profile, with their default unit.

Other CFC codes with the same profile in the Studio
CFCTitleDefault unitPage
213Structural steelworkkgQuote CFC 213
214Carpentry & timber structuresm²Quote CFC 214
222Sheet-metal workm²Quote CFC 222
224Roofing & waterproofingm²Quote CFC 224
226Rendering & façade insulationm²Quote CFC 226
228Shutters & blindspcQuote CFC 228
271Plastering & drywallm²Quote CFC 271
272Metal construction & locksmith workpcQuote CFC 272
273Interior joinerypcQuote CFC 273
281Floor coverings (tiling, parquet)m²Quote CFC 281
282Wall coverings & wall tilingm²Quote CFC 282
285Painting & wallpaperingm²Quote CFC 285
287Final site cleaningm²Quote CFC 287

SIA 118 clauses, retention and SUVA safety

SIA standard 118 governs the contractual relationship between the client and the contractor, provided that the contract expressly declares it applicable. For windows, it structures the formal procedure for acceptance of the work, the final account by measurement according to the actual dimensions and the notification of defects. It establishes a two-year defects notification period during which the contractor can remedy the anomalies reported, offering a reassuring framework for checking the joinery.

SIA 118 as contractual basis

Tick box (unticked by default).

SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.

Asbestos and pollutants

Ticked by default.

Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).

Rise in material prices

Ticked by default.

Reservation for increases in material prices according to the KBOB indices in force.

Pricing method

Your choice, when printing.

Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).

Retention

On joinery sites, the client often applies a retention on the monthly interim payments and on the final account. Studio Devis Suisse lets you set this retention from 0 to 10% excluding VAT. Depending on the provisions of the contract, this retention is kept during the initial period and then returned, or else replaced by an equivalent bank performance guarantee issued by an approved institution. In the Studio’s copilot, the retention (SIA 118) can be set to 0, 5 or 10% of the total incl. VAT, with 10% as the default; cash discount and retention reduce what you actually collect, whereas the discount and the pro-rata account reduce the quote itself.

Safety: what SUVA accident insurance costs

Occupational accident insurance (SUVA) is paid entirely by the employer: 3.5% of gross pay for the Finishing trades CCT-SOR profile in the Studio. For an employee earning CHF 6'050 a month, that is CHF 211.75 a month at your expense, before a single hour has been worked. This premium is part of the 25% of charges that the Studio builds into your daywork rate.

Daywork and profitability: the real cost of one hour of windows and joinery

The most common trap: invoicing on the basis of the hourly wage. An employee with the “Experienced qualified tradesperson (class A)” profile earns CHF 6'050 a month, i.e. CHF 34.38 over 176 paid hours. Once charges of 25.8% (Vaud) and CHF 595 of monthly expenses (meals, travel, equipment) are added, and the result is divided by the 135 genuinely productive hours, one hour costs CHF 60.78, before overheads and margin. You pay for every hour, but you invoice only part of them.

From paid time to productive time (per employee and per year)
StepHours
Paid hours (176 h × 12 months)2'112
Holidays (25 days)−212
Public holidays (9 days)−76
Sickness / accident absences (average)−68
Depot preparation, loading, travel and bad weather−136
Productive hours used by the Studio1'620

How to read this table. Start from the 2'112 paid hours and take away holidays, public holidays, absences and time spent at the depot, loading and travelling: 1'620 billable hours remain, i.e. 77% of paid time.

When to invoice on a daywork basis

Daywork applies to unforeseeable work not covered by the unit prices, such as repairing damaged rebates, unforeseen packing or adjusting existing joinery. To make payment easier, it is useful to draw up daywork sheets regularly, detailing the fitters’ hours, travel and specific supplies, and then to have them signed promptly by site management, in accordance with the contract for work and services.

Reference daywork rates in the Studio, Finishing trades CCT-SOR (Vaud, CHF/h excl. VAT)
ProfileAverage gross monthly payDaywork rate
Finishing trades foreman (CCT-SOR)6'750 CHF106.00
Experienced qualified tradesperson (class A)6'050 CHF96.00
Recently qualified tradesperson (1st to 3rd year after diploma)5'500 CHF88.00
Skilled worker / federal certificate holder (class B)5'300 CHF85.00
Finishing trades assistant (class C)4'850 CHF79.00

How to read this table. Vaud is the reference canton (coefficient 0%). Gross monthly pay is the average wage for the profile; the daywork rate is the hourly rate to invoice, excluding VAT. In another canton, the daywork rate is multiplied by the regional coefficient: the “Experienced qualified tradesperson (class A)” profile goes from CHF 96.00/h in Vaud to CHF 107.50/h in Geneva (+12%). See the page for the canton of Geneva.

Frequently asked questions about quotes for windows and joinery (CFC 221)

How do you draw up a precise offer for the joinery and windows trade in renovation?

In renovation, it is advisable to check the condition of the reveals, the nature of the masonry and the anchoring possibilities. Price separately the removal, the disposal of the old frames and the making good of the sealing. Provide detailed items per linear metre for compensation profiles, insulation junctions and flashings. State clearly in the quote that any making good of reveals or unforeseen adaptation of the structural work will be covered by a daywork sheet validated by site management.

Which access and lifting costs should be included for installing large sliding units?

The weight of triple glazing can often require specific handling equipment. Check whether the access to the building, the capacity of the lifts or the width of the stairwells allow manual carrying. If a mobile crane, a lorry-mounted crane or a suction lifting beam is required, include this equipment as a separate item or as a lump sum, including any permits for parking on public land issued by the municipality.

Who is responsible for the insulation and sealing between the window and the wall?

The limit of the service varies according to the descriptions in the quote. As a general rule, the joiner installs the window and makes the airtight and watertight joint around the frame. The work of connecting the external wall insulation or the render frequently falls to the plasterer or the façade contractor. Define this interface precisely in your tender so that you do not supply membranes or heavy sealants free of charge.

How do you pass on the cost of dealing with the old glazing when it is replaced?

Disposing of the old glazed elements and profiles requires selective sorting at a collection centre or approved landfill, which gives rise to charges by weight or by volume. Do not hide these costs in the labour for dismantling. Create a specific item for transport, unloading and recycling fees. This transparency allows the client to understand the service and protects your margin where volumes are large.

From quote to site

Studio Devis Suisse is free and is enough for a one-off quote. When your quotes multiply, two tools take over where the Studio stops: the full price list to cost faster, then site tracking to check the real margin, hour after hour.

The same trade in the 26 cantons

The regional coefficient, the charges and the family allowances change from one canton to another: open the page for the canton of your site to see the daywork rate and the charges that apply there.

Sources and limits. Reference values of Studio Devis Suisse (as at 23.11.2026), CN and CCT-SOR collective agreements, weighted average contribution rates. Indicative only: check the rates of your compensation fund and the collective agreement that applies to your company.