Quote template for sheet-metal work (CFC 222): SIA costing, daywork rates and QR-bill deposit

Price your items per m², set your daywork rate, protect your margin and issue a quote ready to sign, with a SIX QR-bill for the deposit.

CFC 222 brings together the installation of gutters, downpipes, flashings and aprons as well as metal cladding for roofs and façades, to ensure the drainage of water and the watertightness of the junctions. In Vaud, the employer contributions used are 25.8% of gross pay, plus CHF 595 of monthly expenses and only 135 productive hours out of 176 paid. The Studio builds in these reference values so that your unit prices and your daywork rate cover your real costs, before VAT of 8.1% and the deposit by QR-bill.

Studio Devis SuisseSIA & QR-bill editor · Construction companies
CHF 0 · No account
  • A4 PDF ready to sign
  • SIX QR-bill built in
  • 100% in the browser

Free manual entry · 14’045 ACIP prices & cantons in Soumissions Pro →

Costing specifics for CFC 222: Sheet-metal work

CFC 222 brings together the installation of gutters, downpipes, flashings and aprons as well as metal cladding for roofs and façades, to ensure the drainage of water and the watertightness of the junctions. The Studio prices this trade with the finishing-trades profile, as an indicative and editable basis: check the collective agreement of your sector. The Studio’s default measurement unit is m²; the figures below are those of the Studio’s latest update, with Vaud as the starting canton.

Sheet-metal work is priced mainly per linear metre for profiles, box gutters, drip edges or downpipes, and per m² for dormer coverings or metal cladding. Certain parts prefabricated or shaped in the workshop, such as outlets, bends or stub pipes, are assessed per piece. The CAN standard item catalogue provides specific items for complex soldering and non-standard girths of sheet. To prevent any dispute at the final account, record the overlaps and the folding angles precisely and validate the layout drawings with site management before execution.

Data sheet for item CFC 222
ItemValue in the Studio
CFC code222
TitleSheet-metal work
Reference collective agreementStudio finishing-trades profile (indicative)
Default measurement unitm²
VAT applied8.1%

Items often forgotten in a quote for sheet-metal work

Neighbouring trades

A building site involves several trades in succession, and each line of a quote carries its own CFC code: you can therefore combine several trades in a single document. Here are the other Studio codes attached to the same cost profile, with their default unit.

Other CFC codes with the same profile in the Studio
CFCTitleDefault unitPage
213Structural steelworkkgQuote CFC 213
214Carpentry & timber structuresm²Quote CFC 214
221Joinery & windowspcQuote CFC 221
224Roofing & waterproofingm²Quote CFC 224
226Rendering & façade insulationm²Quote CFC 226
228Shutters & blindspcQuote CFC 228
271Plastering & drywallm²Quote CFC 271
272Metal construction & locksmith workpcQuote CFC 272
273Interior joinerypcQuote CFC 273
281Floor coverings (tiling, parquet)m²Quote CFC 281
282Wall coverings & wall tilingm²Quote CFC 282
285Painting & wallpaperingm²Quote CFC 285
287Final site cleaningm²Quote CFC 287

SIA 118 clauses, retention and SUVA safety

SIA standard 118 governs the rules for actual measurement of the completed work and sets the procedure for joint acceptance with site management. From formal acceptance, the two-year defects notification period begins to run for the client. This balanced contractual framework protects the contractor against late claims and organises the joint verification of the quantities installed, provided that your contract for work and services expressly declares it applicable.

SIA 118 as contractual basis

Tick box (unticked by default).

SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.

Asbestos and pollutants

Ticked by default.

Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).

Rise in material prices

Ticked by default.

Reservation for increases in material prices according to the KBOB indices in force.

Pricing method

Your choice, when printing.

Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).

Retention

On periodic interim payments and on the final account, the contract may stipulate a retention, which our tool lets you set from 0 to 10%. This financial retention is kept until the agreed date or may be released earlier if you provide an equivalent bank or insurance guarantee certificate, guaranteeing your work in accordance with the clauses of the contract. In the Studio’s copilot, the retention (SIA 118) can be set to 0, 5 or 10% of the total incl. VAT, with 10% as the default; cash discount and retention reduce what you actually collect, whereas the discount and the pro-rata account reduce the quote itself.

Safety: what SUVA accident insurance costs

Occupational accident insurance (SUVA) is paid entirely by the employer: 3.5% of gross pay for the Finishing trades CCT-SOR profile in the Studio. For an employee earning CHF 6'050 a month, that is CHF 211.75 a month at your expense, before a single hour has been worked. This premium is part of the 25% of charges that the Studio builds into your daywork rate.

Daywork and profitability: the real cost of one hour of sheet-metal work

The most common trap: invoicing on the basis of the hourly wage. An employee with the “Experienced qualified tradesperson (class A)” profile earns CHF 6'050 a month, i.e. CHF 34.38 over 176 paid hours. Once charges of 25.8% (Vaud) and CHF 595 of monthly expenses (meals, travel, equipment) are added, and the result is divided by the 135 genuinely productive hours, one hour costs CHF 60.78, before overheads and margin. You pay for every hour, but you invoice only part of them.

From paid time to productive time (per employee and per year)
StepHours
Paid hours (176 h × 12 months)2'112
Holidays (25 days)−212
Public holidays (9 days)−76
Sickness / accident absences (average)−68
Depot preparation, loading, travel and bad weather−136
Productive hours used by the Studio1'620

How to read this table. Start from the 2'112 paid hours and take away holidays, public holidays, absences and time spent at the depot, loading and travelling: 1'620 billable hours remain, i.e. 77% of paid time.

When to invoice on a daywork basis

Unforeseen work, such as urgent leak repairs, the renewal of dilapidated junctions discovered during dismantling or adaptations on non-compliant substrates, must be dealt with as daywork. Have your daywork sheets signed every day by site management to certify the hours worked. Depending on the contract, consumables, filler metals, small equipment and travel expenses are added to the hourly rate.

Reference daywork rates in the Studio, Finishing trades CCT-SOR (Vaud, CHF/h excl. VAT)
ProfileAverage gross monthly payDaywork rate
Finishing trades foreman (CCT-SOR)6'750 CHF106.00
Experienced qualified tradesperson (class A)6'050 CHF96.00
Recently qualified tradesperson (1st to 3rd year after diploma)5'500 CHF88.00
Skilled worker / federal certificate holder (class B)5'300 CHF85.00
Finishing trades assistant (class C)4'850 CHF79.00

How to read this table. Vaud is the reference canton (coefficient 0%). Gross monthly pay is the average wage for the profile; the daywork rate is the hourly rate to invoice, excluding VAT. In another canton, the daywork rate is multiplied by the regional coefficient: the “Experienced qualified tradesperson (class A)” profile goes from CHF 96.00/h in Vaud to CHF 107.50/h in Geneva (+12%). See the page for the canton of Geneva.

Frequently asked questions about quotes for sheet-metal work (CFC 222)

How do you estimate sheet offcuts precisely for a sheet-metal work site?

The commercial dimensions of coils or sheets often lead to cuts that can produce waste that cannot be reused. Each part should be broken down according to its flat girth, taking account of the clips, the hemmed folds and the interlocking joints. Allow an overall uplift on the gross supply of metal in your calculation of direct costs, particularly on roofs with irregular shapes or for complex dormer coverings.

Which safety provisions must appear in the pricing of roof work?

Sheet-metal work is frequently carried out at the roof edge. Check that the erection of façade scaffolding, roofer’s platforms or temporary guard rails is clearly assigned to your work package or covered by the structural work contractor. If the installation of temporary anchor devices or safety nets falls within your remit in order to comply with the occupational safety directives, provide for these services as separate items in the quote.

Which collective labour agreement should be applied for the team’s wages?

Studio Devis applies an indicative finishing-trades profile by default, but the real status depends on your company and its place of business. Sheet-metal work may come under a cantonal or national agreement specific to the building envelope or to building metalwork. It is essential to check the sector agreement in force with the competent joint committee in order to validate your minimum wages and charges.

How do you price insulation under box gutters to avoid condensation?

Bare metal sheet encourages thermal bridges and condensation run-off under recessed box gutters. Depending on the detail drawings, the installation of a suitable insulant, a separating felt or a structured mat under the sheet must be provided for. Price this service per linear metre or per m² with its fixing material, because the durability of the underlying timber or masonry substrate depends on it.

From quote to site

Studio Devis Suisse is free and is enough for a one-off quote. When your quotes multiply, two tools take over where the Studio stops: the full price list to cost faster, then site tracking to check the real margin, hour after hour.

The same trade in the 26 cantons

The regional coefficient, the charges and the family allowances change from one canton to another: open the page for the canton of your site to see the daywork rate and the charges that apply there.

Sources and limits. Reference values of Studio Devis Suisse (as at 23.11.2026), CN and CCT-SOR collective agreements, weighted average contribution rates. Indicative only: check the rates of your compensation fund and the collective agreement that applies to your company.