3D rendering of a living room in beige tones, with finished walls and ceilings – quote template for painting (CFC 285) in Switzerland

Trade CFC 285 · Finishing trades CCT-SOR

Quote template for painting (CFC 285): SIA costing, daywork rates and QR-bill deposit

Price your items per m², set your daywork rate, protect your margin and issue a quote ready to sign, with a SIX QR-bill for the deposit.

CFC 285 encompasses the preparation of substrates, the application of primer coats, the painting of walls and ceilings and the careful hanging of wall coverings and wallpapers. In Vaud, the employer contributions used are 25.8% of gross pay, plus CHF 595 of monthly expenses and only 135 productive hours out of 176 paid. The Studio builds in these reference values so that your unit prices and your daywork rate cover your real costs, before VAT of 8.1% and the deposit by QR-bill.

Studio Devis SuisseSIA & QR-bill editor · Construction companies
CHF 0 · No account
  • A4 PDF ready to sign
  • SIX QR-bill built in
  • 100% in the browser

Free manual entry · 14’045 ACIP prices & cantons in Soumissions Pro →

Costing specifics for CFC 285: Painting & wallpapering

CFC 285 encompasses the preparation of substrates, the application of primer coats, the painting of walls and ceilings and the careful hanging of wall coverings and wallpapers. Reference collective agreement in the Studio: CCT-SOR (collective agreement for the finishing trades of French-speaking Switzerland). The Studio’s default measurement unit is m²; the figures below are those of the Studio’s latest update, with Vaud as the starting canton.

The square metre is the usual unit for standard paintwork and wall coverings in accordance with the CAN standard item catalogue (NPK). Skirting boards, mouldings or cornices are often measured by the linear metre, while reveals, radiators or metalwork items are counted by the piece or as a lump sum. The professional rules lay down precise principles for measuring openings as solid for door and window openings. To avoid discrepancies in the final account, specify in your tender the level of finish required, the method of calculation adopted and the detailed nature of the existing substrates.

Data sheet for item CFC 285
ItemValue in the Studio
CFC code285
TitlePainting & wallpapering
Reference collective agreementCCT-SOR (collective agreement for the finishing trades of French-speaking Switzerland)
Default measurement unitm²
VAT applied8.1%

Items often forgotten in a quote for painting

Neighbouring trades

A building site involves several trades in succession, and each line of a quote carries its own CFC code: you can therefore combine several trades in a single document. Here are the other Studio codes attached to the same cost profile, with their default unit.

Other CFC codes with the same profile in the Studio
CFCTitleDefault unitPage
213Structural steelworkkgQuote CFC 213
214Carpentry & timber structuresm²Quote CFC 214
221Joinery & windowspcQuote CFC 221
222Sheet-metal workm²Quote CFC 222
224Roofing & waterproofingm²Quote CFC 224
226Rendering & façade insulationm²Quote CFC 226
228Shutters & blindspcQuote CFC 228
271Plastering & drywallm²Quote CFC 271
272Metal construction & locksmith workpcQuote CFC 272
273Interior joinerypcQuote CFC 273
281Floor coverings (tiling, parquet)m²Quote CFC 281
282Wall coverings & wall tilingm²Quote CFC 282
287Final site cleaningm²Quote CFC 287

SIA 118 clauses, retention and SUVA safety

SIA standard 118 governs the contractual relationship between the painter and the client when it is declared applicable in the contract. It clarifies the formal procedure for acceptance of the work, the notice of defects and the two-year defects notification period. This standard also helps to secure settlement by actual measurement against the initial quote, which prevents disputes over the areas actually executed and provides a framework for managing the variations requested by site management.

SIA 118 as contractual basis

Tick box (unticked by default).

SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.

Asbestos and pollutants

Ticked by default.

Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).

Rise in material prices

Ticked by default.

Reservation for increases in material prices according to the KBOB indices in force.

Pricing method

Your choice, when printing.

Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).

Retention

According to the conditions of the contract for work and services, a retention may be agreed on each interim payment until the final account. Studio Devis Suisse lets you set this rate from 0 to 10% according to the criteria laid down in the tender. The sum withheld serves as a performance guarantee, and is then released at the agreed term or replaced by a bank or insurance guarantee, according to the agreements reached with site management. In the Studio’s copilot, the retention (SIA 118) can be set to 0, 5 or 10% of the total incl. VAT, with 10% as the default; cash discount and retention reduce what you actually collect, whereas the discount and the pro-rata account reduce the quote itself.

Safety: what SUVA accident insurance costs

Occupational accident insurance (SUVA) is paid entirely by the employer: 3.5% of gross pay for the Finishing trades CCT-SOR profile in the Studio. For an employee earning CHF 6'050 a month, that is CHF 211.75 a month at your expense, before a single hour has been worked. This premium is part of the 25% of charges that the Studio builds into your daywork rate.

Daywork and profitability: the real cost of one hour of painting

The most common trap: invoicing on the basis of the hourly wage. An employee with the “Experienced qualified tradesperson (class A)” profile earns CHF 6'050 a month, i.e. CHF 34.38 over 176 paid hours. Once charges of 25.8% (Vaud) and CHF 595 of monthly expenses (meals, travel, equipment) are added, and the result is divided by the 135 genuinely productive hours, one hour costs CHF 60.78, before overheads and margin. You pay for every hour, but you invoice only part of them.

From paid time to productive time (per employee and per year)
StepHours
Paid hours (176 h × 12 months)2'112
Holidays (25 days)−212
Public holidays (9 days)−76
Sickness / accident absences (average)−68
Depot preparation, loading, travel and bad weather−136
Productive hours used by the Studio1'620

How to read this table. Start from the 2'112 paid hours and take away holidays, public holidays, absences and time spent at the depot, loading and travelling: 1'620 billable hours remain, i.e. 77% of paid time.

When to invoice on a daywork basis

Unforeseeable interventions, such as local plaster repairs following the work of other trades or the stripping of old, poorly adhering coats, are sensibly handled as daywork. The contractor must have daily or weekly daywork sheets signed by site management. According to the terms of the contract, specific supplies, the use of special machines and travel allowances are added to the labour hours invoiced.

Reference daywork rates in the Studio, Finishing trades CCT-SOR (Vaud, CHF/h excl. VAT)
ProfileAverage gross monthly payDaywork rate
Finishing trades foreman (CCT-SOR)6'750 CHF106.00
Experienced qualified tradesperson (class A)6'050 CHF96.00
Recently qualified tradesperson (1st to 3rd year after diploma)5'500 CHF88.00
Skilled worker / federal certificate holder (class B)5'300 CHF85.00
Finishing trades assistant (class C)4'850 CHF79.00

How to read this table. Vaud is the reference canton (coefficient 0%). Gross monthly pay is the average wage for the profile; the daywork rate is the hourly rate to invoice, excluding VAT. In another canton, the daywork rate is multiplied by the regional coefficient: the “Experienced qualified tradesperson (class A)” profile goes from CHF 96.00/h in Vaud to CHF 107.50/h in Geneva (+12%). See the page for the canton of Geneva.

Frequently asked questions about quotes for painting (CFC 285)

How can preparation times be estimated for a painting & wallpapering quote in a renovation?

In a renovation, examine the porosity, flatness and adhesion of the substrates before drawing up the offer. Stripping wallpaper, sanding flaking paint or filling cracks often take more hours than applying the final coat. Itemise these preparatory services separately, by the square metre or as a lump sum, so that the client understands the value of this preliminary work, which is essential to the durability of the job.

How should the installation of scaffolding or very tall ladders be handled in the offer?

Working under high ceilings or in stairwells often requires specific means of access, to be provided for according to the contract and the safety rules in force. Provide a separate item in your quote for the erection, hire period and dismantling of the mobile scaffold tower or the platform, rather than burying this cost in the price per square metre of the paintwork.

Which method should be adopted for deducting openings in walls and partitions?

Refer explicitly to the rules of the CAN standard item catalogue and to the practices of the sector mentioned in the specification. In general, small door or window openings are not deducted up to a certain unit area, which compensates for the careful work of cutting in and the cuts at the reveals. Stating these calculation rules clearly in your special conditions prevents any dispute when the final joint measurement is drawn up.

How should reservations about climatic conditions on site be worded?

The application of mineral or acrylic paints requires precise ranges of ambient temperature and substrate moisture to guarantee correct curing. State in the offer that the premises must be heated, watertight and ventilated by the client. If these conditions are lacking in winter, execution must be suspended or be the subject of invoiceable drying measures in agreement with site management.

From quote to site

Studio Devis Suisse is free and is enough for a one-off quote. When your quotes multiply, two tools take over where the Studio stops: the full price list to cost faster, then site tracking to check the real margin, hour after hour.

The same trade in the 26 cantons

The regional coefficient, the charges and the family allowances change from one canton to another: open the page for the canton of your site to see the daywork rate and the charges that apply there.

Sources and limits. Reference values of Studio Devis Suisse (as at 23.11.2026), CN and CCT-SOR collective agreements, weighted average contribution rates. Indicative only: check the rates of your compensation fund and the collective agreement that applies to your company.