Costing specifics for CFC 228: Shutters & blinds
CFC 228 covers the supply and installation of hinged or sliding shutters, linked-slat blinds and solar-protection fabric blinds, as well as their motors, automatic controls and associated connections. The Studio prices this trade with the finishing-trades profile, as an indicative and editable basis: check the collective agreement of your sector. The Studio’s default measurement unit is pc; the figures below are those of the Studio’s latest update, with Vaud as the starting canton.
In this trade, the piece is the usual unit for pricing blinds, shutters, motors or automatic controls according to the CAN standard item catalogue. Certain large protections or specific fabrics are, however, measured per m², whereas adaptation guide rails or additional profiles are often assessed per linear metre. Complex cuts at reveals, mobile scaffolding components, special brackets and the final electrical connection are counted separately. To limit discrepancies in the account with site management, it is useful to validate the real as-built dimensions on site before manufacture begins.
| Item | Value in the Studio |
|---|---|
| CFC code | 228 |
| Title | Shutters & blinds |
| Reference collective agreement | Studio finishing-trades profile (indicative) |
| Default measurement unit | pc |
| VAT applied | 8.1% |
Items often forgotten in a quote for blinds and shutters
- The final electrical connections between the blind motors and the junction boxes
- Careful removal and disposal of the old shutters or asbestos-containing fabrics in accordance with the regulations
- Light scaffolding or elevating work platforms for access to the façades and to high-level blind boxes
- Wind and rain weather sensors as well as the programming of the control units
- Sealing adaptations or junction profiles against externally insulated façades
Neighbouring trades
A building site involves several trades in succession, and each line of a quote carries its own CFC code: you can therefore combine several trades in a single document. Here are the other Studio codes attached to the same cost profile, with their default unit.
| CFC | Title | Default unit | Page |
|---|---|---|---|
| 213 | Structural steelwork | kg | Quote CFC 213 |
| 214 | Carpentry & timber structures | m² | Quote CFC 214 |
| 221 | Joinery & windows | pc | Quote CFC 221 |
| 222 | Sheet-metal work | m² | Quote CFC 222 |
| 224 | Roofing & waterproofing | m² | Quote CFC 224 |
| 226 | Rendering & façade insulation | m² | Quote CFC 226 |
| 271 | Plastering & drywall | m² | Quote CFC 271 |
| 272 | Metal construction & locksmith work | pc | Quote CFC 272 |
| 273 | Interior joinery | pc | Quote CFC 273 |
| 281 | Floor coverings (tiling, parquet) | m² | Quote CFC 281 |
| 282 | Wall coverings & wall tiling | m² | Quote CFC 282 |
| 285 | Painting & wallpapering | m² | Quote CFC 285 |
| 287 | Final site cleaning | m² | Quote CFC 287 |
SIA 118 clauses, retention and SUVA safety
SIA standard 118 governs the contractual relationship between the client and the contractor, provided that your contract expressly declares it applicable. It organises the formal arrangements for acceptance of the work as soon as installation of the shutters and blinds is complete, triggering the two-year defects notification period for reporting defects. It also structures the drawing up of accounts by measurement according to the quantities actually installed, thereby avoiding late disputes from site management at the final account.
SIA 118 as contractual basis
Tick box (unticked by default).
SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.
Asbestos and pollutants
Ticked by default.
Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).
Rise in material prices
Ticked by default.
Reservation for increases in material prices according to the KBOB indices in force.
Pricing method
Your choice, when printing.
Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).
Retention
Depending on the conditions of the contract, the client may apply a retention on your interim payments and on the final account to cover proper execution of the shutters and blinds. Studio Devis Suisse lets you adjust this retention from 0 to 10%. This sum generally remains blocked until the agreed date, unless it is replaced by a bank or insurance guarantee in accordance with the initial agreements. In the Studio’s copilot, the retention (SIA 118) can be set to 0, 5 or 10% of the total incl. VAT, with 10% as the default; cash discount and retention reduce what you actually collect, whereas the discount and the pro-rata account reduce the quote itself.
Safety: what SUVA accident insurance costs
Occupational accident insurance (SUVA) is paid entirely by the employer: 3.5% of gross pay for the Finishing trades CCT-SOR profile in the Studio. For an employee earning CHF 6'050 a month, that is CHF 211.75 a month at your expense, before a single hour has been worked. This premium is part of the 25% of charges that the Studio builds into your daywork rate.
Daywork and profitability: the real cost of one hour of blinds and shutters
The most common trap: invoicing on the basis of the hourly wage. An employee with the “Experienced qualified tradesperson (class A)” profile earns CHF 6'050 a month, i.e. CHF 34.38 over 176 paid hours. Once charges of 25.8% (Vaud) and CHF 595 of monthly expenses (meals, travel, equipment) are added, and the result is divided by the 135 genuinely productive hours, one hour costs CHF 60.78, before overheads and margin. You pay for every hour, but you invoice only part of them.
| Step | Hours |
|---|---|
| Paid hours (176 h × 12 months) | 2'112 |
| Holidays (25 days) | −212 |
| Public holidays (9 days) | −76 |
| Sickness / accident absences (average) | −68 |
| Depot preparation, loading, travel and bad weather | −136 |
| Productive hours used by the Studio | 1'620 |
How to read this table. Start from the 2'112 paid hours and take away holidays, public holidays, absences and time spent at the depot, loading and travelling: 1'620 billable hours remain, i.e. 77% of paid time.
When to invoice on a daywork basis
Daywork applies to unforeseeable services not included in the initial quote, such as repairs to old blind boxes, adaptations on damaged masonry or tracing electrical faults. The contractor must have the daywork sheets signed by site management within the contractual time limits. Depending on the contract, travel, small ironmongery supplies and specific tools are invoiced in addition to the labour hours.
| Profile | Average gross monthly pay | Daywork rate |
|---|---|---|
| Finishing trades foreman (CCT-SOR) | 6'750 CHF | 106.00 |
| Experienced qualified tradesperson (class A) | 6'050 CHF | 96.00 |
| Recently qualified tradesperson (1st to 3rd year after diploma) | 5'500 CHF | 88.00 |
| Skilled worker / federal certificate holder (class B) | 5'300 CHF | 85.00 |
| Finishing trades assistant (class C) | 4'850 CHF | 79.00 |
How to read this table. Vaud is the reference canton (coefficient 0%). Gross monthly pay is the average wage for the profile; the daywork rate is the hourly rate to invoice, excluding VAT. In another canton, the daywork rate is multiplied by the regional coefficient: the “Experienced qualified tradesperson (class A)” profile goes from CHF 96.00/h in Vaud to CHF 107.50/h in Geneva (+12%). See the page for the canton of Geneva.
Frequently asked questions about quotes for blinds and shutters (CFC 228)
How do you estimate installation times for the shutters & blinds trade on an occupied façade?
The presence of occupants slows the work down because of the coordination of access and the protection of the interior fittings. A longer preparation time per blind or shutter should be allowed for, including the laying of dust sheets and meticulous cleaning. Mention these access constraints separately in your offer in order to justify to site management the labour time you have allowed.
Which collective labour agreement should be applied for this trade?
Shutters and solar protection often lie at the crossroads between building metalwork and the finishing trades. You should check the sector agreement or the joint agreements applicable in the canton where the work takes place. These texts define the working conditions, minimum wages and travel allowances to be respected. The tool’s finishing-trades profile can be edited to suit your exact contractual situation.
Should the programming of the radio controls be included in the unit price of the blind?
It is preferable to separate the mechanical installation of the blind from the configuration of group controls or wind-and-sun sensors. Programming requires specific skills and return visits to the site to validate operation with the other trades. Pricing this setting-up under a separate item per piece or as a lump sum avoids eating into your margin in the case of complex home-automation scenarios.
How do you manage the provision of elevating work platforms for work at height?
Access to external blinds often requires auxiliary equipment when the façade has not been scaffolded by the client. You must state in your quote whether the provision of elevating work platforms, the fuel and any municipal permits for occupying public land are included or are at the client’s expense. As a general rule, this equipment is priced separately as a lump-sum item.
From quote to site
Studio Devis Suisse is free and is enough for a one-off quote. When your quotes multiply, two tools take over where the Studio stops: the full price list to cost faster, then site tracking to check the real margin, hour after hour.
The same trade in the 26 cantons
The regional coefficient, the charges and the family allowances change from one canton to another: open the page for the canton of your site to see the daywork rate and the charges that apply there.
- Vaud (VD)
- Geneva (GE)
- Valais (VS)
- Fribourg (FR)
- Neuchâtel (NE)
- Jura (JU)
- Bern (BE)
- Zurich (ZH)
- Zug (ZG)
- Basel-Stadt (BS)
- Basel-Landschaft (BL)
- Aargau (AG)
- Solothurn (SO)
- Lucerne (LU)
- Schwyz (SZ)
- Nidwalden (NW)
- Obwalden (OW)
- Uri (UR)
- St. Gallen (SG)
- Thurgau (TG)
- Schaffhausen (SH)
- Appenzell Ausserrhoden (AR)
- Appenzell Innerrhoden (AI)
- Glarus (GL)
- Graubünden (GR)
- Ticino (TI)