3D rendering of a contemporary detached house and its garden – quote template for blinds and shutters (CFC 228) in Switzerland

Trade CFC 228 · Finishing trades CCT-SOR · indicative profile

Quote template for blinds and shutters (CFC 228): SIA costing, daywork rates and QR-bill deposit

Price your items per piece, set your daywork rate, protect your margin and issue a quote ready to sign, with a SIX QR-bill for the deposit.

CFC 228 covers the supply and installation of hinged or sliding shutters, linked-slat blinds and solar-protection fabric blinds, as well as their motors, automatic controls and associated connections. In Vaud, the employer contributions used are 25.8% of gross pay, plus CHF 595 of monthly expenses and only 135 productive hours out of 176 paid. The Studio builds in these reference values so that your unit prices and your daywork rate cover your real costs, before VAT of 8.1% and the deposit by QR-bill.

Studio Devis SuisseSIA & QR-bill editor · Construction companies
CHF 0 · No account
  • A4 PDF ready to sign
  • SIX QR-bill built in
  • 100% in the browser

Free manual entry · 14’045 ACIP prices & cantons in Soumissions Pro →

Costing specifics for CFC 228: Shutters & blinds

CFC 228 covers the supply and installation of hinged or sliding shutters, linked-slat blinds and solar-protection fabric blinds, as well as their motors, automatic controls and associated connections. The Studio prices this trade with the finishing-trades profile, as an indicative and editable basis: check the collective agreement of your sector. The Studio’s default measurement unit is pc; the figures below are those of the Studio’s latest update, with Vaud as the starting canton.

In this trade, the piece is the usual unit for pricing blinds, shutters, motors or automatic controls according to the CAN standard item catalogue. Certain large protections or specific fabrics are, however, measured per m², whereas adaptation guide rails or additional profiles are often assessed per linear metre. Complex cuts at reveals, mobile scaffolding components, special brackets and the final electrical connection are counted separately. To limit discrepancies in the account with site management, it is useful to validate the real as-built dimensions on site before manufacture begins.

Data sheet for item CFC 228
ItemValue in the Studio
CFC code228
TitleShutters & blinds
Reference collective agreementStudio finishing-trades profile (indicative)
Default measurement unitpc
VAT applied8.1%

Items often forgotten in a quote for blinds and shutters

Neighbouring trades

A building site involves several trades in succession, and each line of a quote carries its own CFC code: you can therefore combine several trades in a single document. Here are the other Studio codes attached to the same cost profile, with their default unit.

Other CFC codes with the same profile in the Studio
CFCTitleDefault unitPage
213Structural steelworkkgQuote CFC 213
214Carpentry & timber structuresm²Quote CFC 214
221Joinery & windowspcQuote CFC 221
222Sheet-metal workm²Quote CFC 222
224Roofing & waterproofingm²Quote CFC 224
226Rendering & façade insulationm²Quote CFC 226
271Plastering & drywallm²Quote CFC 271
272Metal construction & locksmith workpcQuote CFC 272
273Interior joinerypcQuote CFC 273
281Floor coverings (tiling, parquet)m²Quote CFC 281
282Wall coverings & wall tilingm²Quote CFC 282
285Painting & wallpaperingm²Quote CFC 285
287Final site cleaningm²Quote CFC 287

SIA 118 clauses, retention and SUVA safety

SIA standard 118 governs the contractual relationship between the client and the contractor, provided that your contract expressly declares it applicable. It organises the formal arrangements for acceptance of the work as soon as installation of the shutters and blinds is complete, triggering the two-year defects notification period for reporting defects. It also structures the drawing up of accounts by measurement according to the quantities actually installed, thereby avoiding late disputes from site management at the final account.

SIA 118 as contractual basis

Tick box (unticked by default).

SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.

Asbestos and pollutants

Ticked by default.

Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).

Rise in material prices

Ticked by default.

Reservation for increases in material prices according to the KBOB indices in force.

Pricing method

Your choice, when printing.

Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).

Retention

Depending on the conditions of the contract, the client may apply a retention on your interim payments and on the final account to cover proper execution of the shutters and blinds. Studio Devis Suisse lets you adjust this retention from 0 to 10%. This sum generally remains blocked until the agreed date, unless it is replaced by a bank or insurance guarantee in accordance with the initial agreements. In the Studio’s copilot, the retention (SIA 118) can be set to 0, 5 or 10% of the total incl. VAT, with 10% as the default; cash discount and retention reduce what you actually collect, whereas the discount and the pro-rata account reduce the quote itself.

Safety: what SUVA accident insurance costs

Occupational accident insurance (SUVA) is paid entirely by the employer: 3.5% of gross pay for the Finishing trades CCT-SOR profile in the Studio. For an employee earning CHF 6'050 a month, that is CHF 211.75 a month at your expense, before a single hour has been worked. This premium is part of the 25% of charges that the Studio builds into your daywork rate.

Daywork and profitability: the real cost of one hour of blinds and shutters

The most common trap: invoicing on the basis of the hourly wage. An employee with the “Experienced qualified tradesperson (class A)” profile earns CHF 6'050 a month, i.e. CHF 34.38 over 176 paid hours. Once charges of 25.8% (Vaud) and CHF 595 of monthly expenses (meals, travel, equipment) are added, and the result is divided by the 135 genuinely productive hours, one hour costs CHF 60.78, before overheads and margin. You pay for every hour, but you invoice only part of them.

From paid time to productive time (per employee and per year)
StepHours
Paid hours (176 h × 12 months)2'112
Holidays (25 days)−212
Public holidays (9 days)−76
Sickness / accident absences (average)−68
Depot preparation, loading, travel and bad weather−136
Productive hours used by the Studio1'620

How to read this table. Start from the 2'112 paid hours and take away holidays, public holidays, absences and time spent at the depot, loading and travelling: 1'620 billable hours remain, i.e. 77% of paid time.

When to invoice on a daywork basis

Daywork applies to unforeseeable services not included in the initial quote, such as repairs to old blind boxes, adaptations on damaged masonry or tracing electrical faults. The contractor must have the daywork sheets signed by site management within the contractual time limits. Depending on the contract, travel, small ironmongery supplies and specific tools are invoiced in addition to the labour hours.

Reference daywork rates in the Studio, Finishing trades CCT-SOR (Vaud, CHF/h excl. VAT)
ProfileAverage gross monthly payDaywork rate
Finishing trades foreman (CCT-SOR)6'750 CHF106.00
Experienced qualified tradesperson (class A)6'050 CHF96.00
Recently qualified tradesperson (1st to 3rd year after diploma)5'500 CHF88.00
Skilled worker / federal certificate holder (class B)5'300 CHF85.00
Finishing trades assistant (class C)4'850 CHF79.00

How to read this table. Vaud is the reference canton (coefficient 0%). Gross monthly pay is the average wage for the profile; the daywork rate is the hourly rate to invoice, excluding VAT. In another canton, the daywork rate is multiplied by the regional coefficient: the “Experienced qualified tradesperson (class A)” profile goes from CHF 96.00/h in Vaud to CHF 107.50/h in Geneva (+12%). See the page for the canton of Geneva.

Frequently asked questions about quotes for blinds and shutters (CFC 228)

How do you estimate installation times for the shutters & blinds trade on an occupied façade?

The presence of occupants slows the work down because of the coordination of access and the protection of the interior fittings. A longer preparation time per blind or shutter should be allowed for, including the laying of dust sheets and meticulous cleaning. Mention these access constraints separately in your offer in order to justify to site management the labour time you have allowed.

Which collective labour agreement should be applied for this trade?

Shutters and solar protection often lie at the crossroads between building metalwork and the finishing trades. You should check the sector agreement or the joint agreements applicable in the canton where the work takes place. These texts define the working conditions, minimum wages and travel allowances to be respected. The tool’s finishing-trades profile can be edited to suit your exact contractual situation.

Should the programming of the radio controls be included in the unit price of the blind?

It is preferable to separate the mechanical installation of the blind from the configuration of group controls or wind-and-sun sensors. Programming requires specific skills and return visits to the site to validate operation with the other trades. Pricing this setting-up under a separate item per piece or as a lump sum avoids eating into your margin in the case of complex home-automation scenarios.

How do you manage the provision of elevating work platforms for work at height?

Access to external blinds often requires auxiliary equipment when the façade has not been scaffolded by the client. You must state in your quote whether the provision of elevating work platforms, the fuel and any municipal permits for occupying public land are included or are at the client’s expense. As a general rule, this equipment is priced separately as a lump-sum item.

From quote to site

Studio Devis Suisse is free and is enough for a one-off quote. When your quotes multiply, two tools take over where the Studio stops: the full price list to cost faster, then site tracking to check the real margin, hour after hour.

The same trade in the 26 cantons

The regional coefficient, the charges and the family allowances change from one canton to another: open the page for the canton of your site to see the daywork rate and the charges that apply there.

Sources and limits. Reference values of Studio Devis Suisse (as at 23.11.2026), CN and CCT-SOR collective agreements, weighted average contribution rates. Indicative only: check the rates of your compensation fund and the collective agreement that applies to your company.