3D rendering of a bright living area with an open kitchen – quote template for metalwork (CFC 272) in Switzerland

Trade CFC 272 · Finishing trades CCT-SOR · indicative profile

Quote template for metalwork (CFC 272): SIA costing, daywork rates and QR-bill deposit

Price your items per piece, set your daywork rate, protect your margin and issue a quote ready to sign, with a SIX QR-bill for the deposit.

CFC 272 covers the fabrication and installation of metal staircases, balustrades, service doors and grilles, as well as various made-to-measure metalwork items for buildings. In Vaud, the employer contributions used are 25.8% of gross pay, plus CHF 595 of monthly expenses and only 135 productive hours out of 176 paid. The Studio builds in these reference values so that your unit prices and your daywork rate cover your real costs, before VAT of 8.1% and the deposit by QR-bill.

Studio Devis SuisseSIA & QR-bill editor · Construction companies
CHF 0 · No account
  • A4 PDF ready to sign
  • SIX QR-bill built in
  • 100% in the browser

Free manual entry · 14’045 ACIP prices & cantons in Soumissions Pro →

Costing specifics for CFC 272: Metal construction & locksmith work

CFC 272 covers the fabrication and installation of metal staircases, balustrades, service doors and grilles, as well as various made-to-measure metalwork items for buildings. The Studio prices this trade with the finishing-trades profile, as an indicative and editable basis: check the collective agreement of your sector. The Studio’s default measurement unit is pc; the figures below are those of the Studio’s latest update, with Vaud as the starting canton.

For CFC 272, the piece is the usual unit for complete assemblies such as doors or staircases. The linear metre often applies to balustrades and handrails, the square metre to sheet metal or glazing, and the kilogram to secondary structures. Measurement according to the CAN standard item catalogue (NPK) distinguishes supply, surface treatment and erection. Special anchors, templates and drilling in reinforced concrete are counted separately. Defining precisely the limits of the services in the quote avoids disputes when the final account is drawn up with site management.

Data sheet for item CFC 272
ItemValue in the Studio
CFC code272
TitleMetal construction & locksmith work
Reference collective agreementStudio finishing-trades profile (indicative)
Default measurement unitpc
VAT applied8.1%

Items often forgotten in a quote for metalwork

Neighbouring trades

A building site involves several trades in succession, and each line of a quote carries its own CFC code: you can therefore combine several trades in a single document. Here are the other Studio codes attached to the same cost profile, with their default unit.

Other CFC codes with the same profile in the Studio
CFCTitleDefault unitPage
213Structural steelworkkgQuote CFC 213
214Carpentry & timber structuresm²Quote CFC 214
221Joinery & windowspcQuote CFC 221
222Sheet-metal workm²Quote CFC 222
224Roofing & waterproofingm²Quote CFC 224
226Rendering & façade insulationm²Quote CFC 226
228Shutters & blindspcQuote CFC 228
271Plastering & drywallm²Quote CFC 271
273Interior joinerypcQuote CFC 273
281Floor coverings (tiling, parquet)m²Quote CFC 281
282Wall coverings & wall tilingm²Quote CFC 282
285Painting & wallpaperingm²Quote CFC 285
287Final site cleaningm²Quote CFC 287

SIA 118 clauses, retention and SUVA safety

SIA standard 118 governs the contractual relationship between the metalwork contractor and the client only if the contract for work and services expressly declares it applicable. It governs the formal procedure for acceptance of the work, the notice of defects and the two-year defects notification period. It also formalises the rules for joint measurement and invoicing, protecting the company against technical disputes when the final account is drawn up.

SIA 118 as contractual basis

Tick box (unticked by default).

SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.

Asbestos and pollutants

Ticked by default.

Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).

Rise in material prices

Ticked by default.

Reservation for increases in material prices according to the KBOB indices in force.

Pricing method

Your choice, when printing.

Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).

Retention

The client frequently asks for a retention on each monthly interim payment to cover any defects in execution. Our tool lets you set a retention of 0 to 10% according to the agreements reached. This retention is returned on the agreed date or replaced by an equivalent bank guarantee when the final account is drawn up, thus securing your workshop’s cash flow. In the Studio’s copilot, the retention (SIA 118) can be set to 0, 5 or 10% of the total incl. VAT, with 10% as the default; cash discount and retention reduce what you actually collect, whereas the discount and the pro-rata account reduce the quote itself.

Safety: what SUVA accident insurance costs

Occupational accident insurance (SUVA) is paid entirely by the employer: 3.5% of gross pay for the Finishing trades CCT-SOR profile in the Studio. For an employee earning CHF 6'050 a month, that is CHF 211.75 a month at your expense, before a single hour has been worked. This premium is part of the 25% of charges that the Studio builds into your daywork rate.

Daywork and profitability: the real cost of one hour of metalwork

The most common trap: invoicing on the basis of the hourly wage. An employee with the “Experienced qualified tradesperson (class A)” profile earns CHF 6'050 a month, i.e. CHF 34.38 over 176 paid hours. Once charges of 25.8% (Vaud) and CHF 595 of monthly expenses (meals, travel, equipment) are added, and the result is divided by the 135 genuinely productive hours, one hour costs CHF 60.78, before overheads and margin. You pay for every hour, but you invoice only part of them.

From paid time to productive time (per employee and per year)
StepHours
Paid hours (176 h × 12 months)2'112
Holidays (25 days)−212
Public holidays (9 days)−76
Sickness / accident absences (average)−68
Depot preparation, loading, travel and bad weather−136
Productive hours used by the Studio1'620

How to read this table. Start from the 2'112 paid hours and take away holidays, public holidays, absences and time spent at the depot, loading and travelling: 1'620 billable hours remain, i.e. 77% of paid time.

When to invoice on a daywork basis

Unforeseen work not described in the initial offer is best carried out as daywork, in particular changes to fixings decided on site or the adjustment of existing elements. Have the daywork sheets signed every day by site management. In addition to the hourly labour rate, do not forget to invoice welding consumables, specific ironmongery, workshop machines and travel, according to the contract.

Reference daywork rates in the Studio, Finishing trades CCT-SOR (Vaud, CHF/h excl. VAT)
ProfileAverage gross monthly payDaywork rate
Finishing trades foreman (CCT-SOR)6'750 CHF106.00
Experienced qualified tradesperson (class A)6'050 CHF96.00
Recently qualified tradesperson (1st to 3rd year after diploma)5'500 CHF88.00
Skilled worker / federal certificate holder (class B)5'300 CHF85.00
Finishing trades assistant (class C)4'850 CHF79.00

How to read this table. Vaud is the reference canton (coefficient 0%). Gross monthly pay is the average wage for the profile; the daywork rate is the hourly rate to invoice, excluding VAT. In another canton, the daywork rate is multiplied by the regional coefficient: the “Experienced qualified tradesperson (class A)” profile goes from CHF 96.00/h in Vaud to CHF 107.50/h in Geneva (+12%). See the page for the canton of Geneva.

Frequently asked questions about quotes for metalwork (CFC 272)

How can installation times be estimated in metal construction and locksmith work?

The installation of metalwork depends heavily on site access, on the presence of a goods lift or on the need for mobile cranes. A straight handrail fixed to accessible concrete takes considerably less time than a spiral staircase to be inserted into a narrow stairwell opening. Assess workshop hours, transport and on-site hours separately, providing enough staff to handle the parts in complete safety in accordance with the Construction Work Ordinance (OTConst).

Which collective labour agreement must be applied for this CFC?

By default, Studio Devis Suisse proposes a finishing-trades profile, as an indicative and adaptable basis. Depending on the size of your business, the actual activities of your workshop and the canton where it is established, the sector agreement or the regional joint agreements may differ. It is up to you to check with the competent joint committee exactly which collective framework governs your production and installation staff.

How should anti-corrosion finishes and powder-coated paint be priced?

Do not underestimate the cost of external treatments carried out by specialist subcontractors. Hot-dip galvanising is calculated by weight, while powder coating is generally invoiced by the square metre, or by the linear metre for profiles. Remember to include the return transport costs between your workshop and the treatment plant, as well as the touch-ups needed after cutting or welding on site.

Should technical studies and workshop drawings be invoiced separately?

For complex or load-bearing structures, the structural calculations and the working drawings require a substantial investment from the design office. Unless the specification states otherwise, it is prudent to create a separate lump-sum item for engineering and for the drawings submitted to site management for approval, before any raw material is committed in the workshop.

From quote to site

Studio Devis Suisse is free and is enough for a one-off quote. When your quotes multiply, two tools take over where the Studio stops: the full price list to cost faster, then site tracking to check the real margin, hour after hour.

The same trade in the 26 cantons

The regional coefficient, the charges and the family allowances change from one canton to another: open the page for the canton of your site to see the daywork rate and the charges that apply there.

Sources and limits. Reference values of Studio Devis Suisse (as at 23.11.2026), CN and CCT-SOR collective agreements, weighted average contribution rates. Indicative only: check the rates of your compensation fund and the collective agreement that applies to your company.