3D rendering of a street lined with apartment buildings, from daytime to dusk – quote template for timber construction (CFC 214) in Switzerland

Trade CFC 214 · Finishing trades CCT-SOR · indicative profile

Quote template for timber construction (CFC 214): SIA costing, daywork rates and QR-bill deposit

Price your items per m², set your daywork rate, protect your margin and issue a quote ready to sign, with a SIX QR-bill for the deposit.

CFC 214 encompasses the cutting, treatment and erection of traditional roof structures, glued laminated timber structures, trusses, purlins and load-bearing timber elements. In Vaud, the employer contributions used are 25.8% of gross pay, plus CHF 595 of monthly expenses and only 135 productive hours out of 176 paid. The Studio builds in these reference values so that your unit prices and your daywork rate cover your real costs, before VAT of 8.1% and the deposit by QR-bill.

Studio Devis SuisseSIA & QR-bill editor · Construction companies
CHF 0 · No account
  • A4 PDF ready to sign
  • SIX QR-bill built in
  • 100% in the browser

Free manual entry · 14’045 ACIP prices & cantons in Soumissions Pro →

Costing specifics for CFC 214: Carpentry & timber structures

CFC 214 encompasses the cutting, treatment and erection of traditional roof structures, glued laminated timber structures, trusses, purlins and load-bearing timber elements. The Studio prices this trade with the finishing-trades profile, as an indicative and editable basis: check the collective agreement of your sector. The Studio’s default measurement unit is m²; the figures below are those of the Studio’s latest update, with Vaud as the starting canton.

For carpentry, the quote uses the m² for roof slopes, the m³ or the linear metre for sawn and squared timber, and the piece for connection hardware or metal connectors. Preventive treatment and complex machining are often priced per linear metre or as a lump sum according to the CAN standard item catalogue. Anchorage parts at the foot of posts, double ties and temporary lifting reinforcements must be counted separately to prevent any discrepancy at the final jointly agreed measurement.

Data sheet for item CFC 214
ItemValue in the Studio
CFC code214
TitleCarpentry & timber structures
Reference collective agreementStudio finishing-trades profile (indicative)
Default measurement unitm²
VAT applied8.1%

Items often forgotten in a quote for timber construction

Neighbouring trades

A building site involves several trades in succession, and each line of a quote carries its own CFC code: you can therefore combine several trades in a single document. Here are the other Studio codes attached to the same cost profile, with their default unit.

Other CFC codes with the same profile in the Studio
CFCTitleDefault unitPage
213Structural steelworkkgQuote CFC 213
221Joinery & windowspcQuote CFC 221
222Sheet-metal workm²Quote CFC 222
224Roofing & waterproofingm²Quote CFC 224
226Rendering & façade insulationm²Quote CFC 226
228Shutters & blindspcQuote CFC 228
271Plastering & drywallm²Quote CFC 271
272Metal construction & locksmith workpcQuote CFC 272
273Interior joinerypcQuote CFC 273
281Floor coverings (tiling, parquet)m²Quote CFC 281
282Wall coverings & wall tilingm²Quote CFC 282
285Painting & wallpaperingm²Quote CFC 285
287Final site cleaningm²Quote CFC 287

SIA 118 clauses, retention and SUVA safety

SIA standard 118 governs the measurement arrangements, the joint verification of the quantities installed and the procedure for acceptance of the carpentry work with site management. In particular, it sets the formalities for notification of defects and establishes a two-year defects notification period for reporting the anomalies found. This standard, which protects both parties, only takes effect, however, if the contract for work and services expressly declares it applicable.

SIA 118 as contractual basis

Tick box (unticked by default).

SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.

Asbestos and pollutants

Ticked by default.

Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).

Rise in material prices

Ticked by default.

Reservation for increases in material prices according to the KBOB indices in force.

Pricing method

Your choice, when printing.

Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).

Retention

On periodic interim payments and on the final account, the client may retain an amount to cover any defects in execution. The Studio lets you set a retention of 0 to 10% on each interim invoice. Depending on the clauses of the contract, the sum retained is released on the agreed date or may be replaced by a bank or insurance guarantee of an equivalent amount provided by the carpenter. In the Studio’s copilot, the retention (SIA 118) can be set to 0, 5 or 10% of the total incl. VAT, with 10% as the default; cash discount and retention reduce what you actually collect, whereas the discount and the pro-rata account reduce the quote itself.

Safety: what SUVA accident insurance costs

Occupational accident insurance (SUVA) is paid entirely by the employer: 3.5% of gross pay for the Finishing trades CCT-SOR profile in the Studio. For an employee earning CHF 6'050 a month, that is CHF 211.75 a month at your expense, before a single hour has been worked. This premium is part of the 25% of charges that the Studio builds into your daywork rate.

Daywork and profitability: the real cost of one hour of timber construction

The most common trap: invoicing on the basis of the hourly wage. An employee with the “Experienced qualified tradesperson (class A)” profile earns CHF 6'050 a month, i.e. CHF 34.38 over 176 paid hours. Once charges of 25.8% (Vaud) and CHF 595 of monthly expenses (meals, travel, equipment) are added, and the result is divided by the 135 genuinely productive hours, one hour costs CHF 60.78, before overheads and margin. You pay for every hour, but you invoice only part of them.

From paid time to productive time (per employee and per year)
StepHours
Paid hours (176 h × 12 months)2'112
Holidays (25 days)−212
Public holidays (9 days)−76
Sickness / accident absences (average)−68
Depot preparation, loading, travel and bad weather−136
Productive hours used by the Studio1'620

How to read this table. Start from the 2'112 paid hours and take away holidays, public holidays, absences and time spent at the depot, loading and travelling: 1'620 billable hours remain, i.e. 77% of paid time.

When to invoice on a daywork basis

Unforeseen propping work, adaptation cuts on an existing roof structure or strengthening that cannot be priced in advance are dealt with as daywork. The contractor must draw up detailed daywork sheets and have them countersigned regularly by site management. In addition to the labour hours, transport, the use of lifting machines and small site supplies are added to the invoice in accordance with the contract concluded.

Reference daywork rates in the Studio, Finishing trades CCT-SOR (Vaud, CHF/h excl. VAT)
ProfileAverage gross monthly payDaywork rate
Finishing trades foreman (CCT-SOR)6'750 CHF106.00
Experienced qualified tradesperson (class A)6'050 CHF96.00
Recently qualified tradesperson (1st to 3rd year after diploma)5'500 CHF88.00
Skilled worker / federal certificate holder (class B)5'300 CHF85.00
Finishing trades assistant (class C)4'850 CHF79.00

How to read this table. Vaud is the reference canton (coefficient 0%). Gross monthly pay is the average wage for the profile; the daywork rate is the hourly rate to invoice, excluding VAT. In another canton, the daywork rate is multiplied by the regional coefficient: the “Experienced qualified tradesperson (class A)” profile goes from CHF 96.00/h in Vaud to CHF 107.50/h in Geneva (+12%). See the page for the canton of Geneva.

Frequently asked questions about quotes for timber construction (CFC 214)

How do I choose the base unit for my quote for carpentry and timber structures?

Although the Studio offers the m² by default for measuring roof surfaces or floors, solid elements such as glued laminated beams are generally priced per m³ or per linear metre. The important thing is to break your offer down according to the chapters of the CAN catalogue, separating supply and cutting in the workshop from the on-site erection phase, while including the specific hardware per piece.

Which collective labour agreement should be applied for my team’s wages?

The Studio applies an editable finishing-trades profile as an indication. However, timber structures and carpentry may come under specific cantonal or French-speaking Swiss sector agreements depending on the exact activities of your company. You should check the pay scales in force with the competent joint committee in order to enter your labour costs accurately in your quote template.

How do you price concealed connection hardware and rods?

Made-to-measure metal parts represent a significant cost that must not be diluted in the price of timber per cubic metre. It is advisable to create a separate quote line, either by weight in kilograms for ordinary steel, or per piece for certified connectors. It is useful to state whether the machining of notches in the workshop is included in the cutting item or in the erection.

What arrangements should be made for bad weather during the erection phase?

Engineered timber and prefabricated panels do not tolerate prolonged exposure to standing water. Your offer must state whether temporary protection, daily sheeting and the removal of water from floors are the responsibility of the carpenter or of site management. If these protective measures are at your expense, price them clearly as a lump sum for securing the works in order to protect your liability.

From quote to site

Studio Devis Suisse is free and is enough for a one-off quote. When your quotes multiply, two tools take over where the Studio stops: the full price list to cost faster, then site tracking to check the real margin, hour after hour.

The same trade in the 26 cantons

The regional coefficient, the charges and the family allowances change from one canton to another: open the page for the canton of your site to see the daywork rate and the charges that apply there.

Sources and limits. Reference values of Studio Devis Suisse (as at 23.11.2026), CN and CCT-SOR collective agreements, weighted average contribution rates. Indicative only: check the rates of your compensation fund and the collective agreement that applies to your company.