Costing specifics for CFC 282: Wall coverings & wall tiling
CFC 282 covers glazed wall tiles, wall tiling, interior plasters and decorative renders, as well as specific wall claddings for all types of rooms. Reference collective agreement in the Studio: CCT-SOR (collective agreement for the finishing trades of French-speaking Switzerland). The Studio’s default measurement unit is m²; the figures below are those of the Studio’s latest update, with Vaud as the starting canton.
The developed area in m² is the usual unit of measurement for wall tiles and interior renders in accordance with the CAN standard item catalogue (NPK). The SIA rules for the sector specify how openings and voids are dealt with. Cut-outs for fittings, holes for taps, shower niches and frame claddings are often quantified by the piece or by the linear metre. Sealing profiles, corner trims and flexible sealing joints are measured by the linear metre. To avoid discrepancies in the final account, specify clearly the services that are included and those that are counted separately.
| Item | Value in the Studio |
|---|---|
| CFC code | 282 |
| Title | Wall coverings & wall tiling |
| Reference collective agreement | CCT-SOR (collective agreement for the finishing trades of French-speaking Switzerland) |
| Default measurement unit | m² |
| VAT applied | 8.1% |
Items often forgotten in a quote for wall coverings
- Liquid waterproofing system under tiles and sealing tapes in shower areas
- Treatment and levelling of substrates before laying large-format wall tiles
- Corner finishing profiles, metal trims and finishes for visible edges
- Flexible junction joints in fungicidal silicone along the sanitary appliances
- Specific holes for wall fixings, pipes and concealed taps and fittings
Neighbouring trades
A building site involves several trades in succession, and each line of a quote carries its own CFC code: you can therefore combine several trades in a single document. Here are the other Studio codes attached to the same cost profile, with their default unit.
| CFC | Title | Default unit | Page |
|---|---|---|---|
| 213 | Structural steelwork | kg | Quote CFC 213 |
| 214 | Carpentry & timber structures | m² | Quote CFC 214 |
| 221 | Joinery & windows | pc | Quote CFC 221 |
| 222 | Sheet-metal work | m² | Quote CFC 222 |
| 224 | Roofing & waterproofing | m² | Quote CFC 224 |
| 226 | Rendering & façade insulation | m² | Quote CFC 226 |
| 228 | Shutters & blinds | pc | Quote CFC 228 |
| 271 | Plastering & drywall | m² | Quote CFC 271 |
| 272 | Metal construction & locksmith work | pc | Quote CFC 272 |
| 273 | Interior joinery | pc | Quote CFC 273 |
| 281 | Floor coverings (tiling, parquet) | m² | Quote CFC 281 |
| 285 | Painting & wallpapering | m² | Quote CFC 285 |
| 287 | Final site cleaning | m² | Quote CFC 287 |
SIA 118 clauses, retention and SUVA safety
SIA standard 118 precisely governs the contractual relationship if your contract for work and services expressly declares it applicable. For wall coverings, it structures the formal acceptance of the work in the presence of site management and the client. From that stage, the notice of defects and the two-year defects notification period take effect. This standard also clarifies settlement by actual measurement, limiting disputes over the real areas and the edge finishes.
SIA 118 as contractual basis
Tick box (unticked by default).
SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.
Asbestos and pollutants
Ticked by default.
Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).
Rise in material prices
Ticked by default.
Reservation for increases in material prices according to the KBOB indices in force.
Pricing method
Your choice, when printing.
Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).
Retention
Depending on the contractual conditions, the client may apply a retention to your monthly interim payments and to the final account. Studio Devis Suisse lets you set this retention from 0 to 10%. This sum remains blocked until the agreed date or may be released earlier if you provide an equivalent bank or insurance performance guarantee, as provided for in the contract. In the Studio’s copilot, the retention (SIA 118) can be set to 0, 5 or 10% of the total incl. VAT, with 10% as the default; cash discount and retention reduce what you actually collect, whereas the discount and the pro-rata account reduce the quote itself.
Safety: what SUVA accident insurance costs
Occupational accident insurance (SUVA) is paid entirely by the employer: 3.5% of gross pay for the Finishing trades CCT-SOR profile in the Studio. For an employee earning CHF 6'050 a month, that is CHF 211.75 a month at your expense, before a single hour has been worked. This premium is part of the 25% of charges that the Studio builds into your daywork rate.
Daywork and profitability: the real cost of one hour of wall coverings
The most common trap: invoicing on the basis of the hourly wage. An employee with the “Experienced qualified tradesperson (class A)” profile earns CHF 6'050 a month, i.e. CHF 34.38 over 176 paid hours. Once charges of 25.8% (Vaud) and CHF 595 of monthly expenses (meals, travel, equipment) are added, and the result is divided by the 135 genuinely productive hours, one hour costs CHF 60.78, before overheads and margin. You pay for every hour, but you invoice only part of them.
| Step | Hours |
|---|---|
| Paid hours (176 h × 12 months) | 2'112 |
| Holidays (25 days) | −212 |
| Public holidays (9 days) | −76 |
| Sickness / accident absences (average) | −68 |
| Depot preparation, loading, travel and bad weather | −136 |
| Productive hours used by the Studio | 1'620 |
How to read this table. Start from the 2'112 paid hours and take away holidays, public holidays, absences and time spent at the depot, loading and travelling: 1'620 billable hours remain, i.e. 77% of paid time.
When to invoice on a daywork basis
Daywork applies to unforeseeable tasks not covered by the unit prices, such as the occasional repair of a deteriorated substrate or delicate removals. It is strongly advisable to have your daywork sheets signed by site management within the agreed deadlines. Depending on the contract concluded, the supplies consumed, the special binders and the travel costs are invoiced on top of the agreed hours.
| Profile | Average gross monthly pay | Daywork rate |
|---|---|---|
| Finishing trades foreman (CCT-SOR) | 6'750 CHF | 106.00 |
| Experienced qualified tradesperson (class A) | 6'050 CHF | 96.00 |
| Recently qualified tradesperson (1st to 3rd year after diploma) | 5'500 CHF | 88.00 |
| Skilled worker / federal certificate holder (class B) | 5'300 CHF | 85.00 |
| Finishing trades assistant (class C) | 4'850 CHF | 79.00 |
How to read this table. Vaud is the reference canton (coefficient 0%). Gross monthly pay is the average wage for the profile; the daywork rate is the hourly rate to invoice, excluding VAT. In another canton, the daywork rate is multiplied by the regional coefficient: the “Experienced qualified tradesperson (class A)” profile goes from CHF 96.00/h in Vaud to CHF 107.50/h in Geneva (+12%). See the page for the canton of Geneva.
Frequently asked questions about quotes for wall coverings (CFC 282)
How can material losses be estimated for wall coverings & wall tiling?
The actual layout determines the waste rate, which depends on the size of the tiles, the complexity of the corners and the alignments required by the sanitary appliances. For large-format wall tiles or a staggered lay, the cuts generate more waste than a classic straight lay. Build this surplus into your supply orders and your price analyses, otherwise you risk running short of tiles from the same batch at the end of the site.
Should wall waterproofing under tiles be priced separately?
In wet rooms, the application of waterproofing under tiles with corner reinforcements is a technical service distinct from the laying of wall tiles. A separate item should be created in your quote, in m², or by the linear metre for the sealing tapes. This clarity protects your margin and avoids any misunderstanding with site management as to the scope included in the price of the covering.
Which collective agreement governs the laying of wall tiles in French-speaking Switzerland?
Companies active in this sector generally come under the CCT-SOR for the finishing trades of French-speaking Switzerland, or under the extended cantonal agreements depending on the location of the site. These texts govern the minimum wages, the travel allowances and the working conditions of tilers. It is necessary to check the applicable agreement with the competent joint committee in order to calculate your real hourly costs correctly.
How should differences in the flatness of the substrate be approached at tender stage?
The tolerances of the structural work often do not match the precision required by rectified wall tiles. State in the remarks of your quote that your prices assume a substrate that complies with the usual flatness standards. Provide an item in the schedule for possible wall levelling or a levelling coat, invoiceable after a joint inspection with site management before your work begins.
From quote to site
Studio Devis Suisse is free and is enough for a one-off quote. When your quotes multiply, two tools take over where the Studio stops: the full price list to cost faster, then site tracking to check the real margin, hour after hour.
The same trade in the 26 cantons
The regional coefficient, the charges and the family allowances change from one canton to another: open the page for the canton of your site to see the daywork rate and the charges that apply there.
- Vaud (VD)
- Geneva (GE)
- Valais (VS)
- Fribourg (FR)
- Neuchâtel (NE)
- Jura (JU)
- Bern (BE)
- Zurich (ZH)
- Zug (ZG)
- Basel-Stadt (BS)
- Basel-Landschaft (BL)
- Aargau (AG)
- Solothurn (SO)
- Lucerne (LU)
- Schwyz (SZ)
- Nidwalden (NW)
- Obwalden (OW)
- Uri (UR)
- St. Gallen (SG)
- Thurgau (TG)
- Schaffhausen (SH)
- Appenzell Ausserrhoden (AR)
- Appenzell Innerrhoden (AI)
- Glarus (GL)
- Graubünden (GR)
- Ticino (TI)