3D rendering of a bright living area with an open kitchen – quote template for wall coverings (CFC 282) in Switzerland

Trade CFC 282 · Finishing trades CCT-SOR

Quote template for wall coverings (CFC 282): SIA costing, daywork rates and QR-bill deposit

Price your items per m², set your daywork rate, protect your margin and issue a quote ready to sign, with a SIX QR-bill for the deposit.

CFC 282 covers glazed wall tiles, wall tiling, interior plasters and decorative renders, as well as specific wall claddings for all types of rooms. In Vaud, the employer contributions used are 25.8% of gross pay, plus CHF 595 of monthly expenses and only 135 productive hours out of 176 paid. The Studio builds in these reference values so that your unit prices and your daywork rate cover your real costs, before VAT of 8.1% and the deposit by QR-bill.

Studio Devis SuisseSIA & QR-bill editor · Construction companies
CHF 0 · No account
  • A4 PDF ready to sign
  • SIX QR-bill built in
  • 100% in the browser

Free manual entry · 14’045 ACIP prices & cantons in Soumissions Pro →

Costing specifics for CFC 282: Wall coverings & wall tiling

CFC 282 covers glazed wall tiles, wall tiling, interior plasters and decorative renders, as well as specific wall claddings for all types of rooms. Reference collective agreement in the Studio: CCT-SOR (collective agreement for the finishing trades of French-speaking Switzerland). The Studio’s default measurement unit is m²; the figures below are those of the Studio’s latest update, with Vaud as the starting canton.

The developed area in m² is the usual unit of measurement for wall tiles and interior renders in accordance with the CAN standard item catalogue (NPK). The SIA rules for the sector specify how openings and voids are dealt with. Cut-outs for fittings, holes for taps, shower niches and frame claddings are often quantified by the piece or by the linear metre. Sealing profiles, corner trims and flexible sealing joints are measured by the linear metre. To avoid discrepancies in the final account, specify clearly the services that are included and those that are counted separately.

Data sheet for item CFC 282
ItemValue in the Studio
CFC code282
TitleWall coverings & wall tiling
Reference collective agreementCCT-SOR (collective agreement for the finishing trades of French-speaking Switzerland)
Default measurement unitm²
VAT applied8.1%

Items often forgotten in a quote for wall coverings

Neighbouring trades

A building site involves several trades in succession, and each line of a quote carries its own CFC code: you can therefore combine several trades in a single document. Here are the other Studio codes attached to the same cost profile, with their default unit.

Other CFC codes with the same profile in the Studio
CFCTitleDefault unitPage
213Structural steelworkkgQuote CFC 213
214Carpentry & timber structuresm²Quote CFC 214
221Joinery & windowspcQuote CFC 221
222Sheet-metal workm²Quote CFC 222
224Roofing & waterproofingm²Quote CFC 224
226Rendering & façade insulationm²Quote CFC 226
228Shutters & blindspcQuote CFC 228
271Plastering & drywallm²Quote CFC 271
272Metal construction & locksmith workpcQuote CFC 272
273Interior joinerypcQuote CFC 273
281Floor coverings (tiling, parquet)m²Quote CFC 281
285Painting & wallpaperingm²Quote CFC 285
287Final site cleaningm²Quote CFC 287

SIA 118 clauses, retention and SUVA safety

SIA standard 118 precisely governs the contractual relationship if your contract for work and services expressly declares it applicable. For wall coverings, it structures the formal acceptance of the work in the presence of site management and the client. From that stage, the notice of defects and the two-year defects notification period take effect. This standard also clarifies settlement by actual measurement, limiting disputes over the real areas and the edge finishes.

SIA 118 as contractual basis

Tick box (unticked by default).

SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.

Asbestos and pollutants

Ticked by default.

Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).

Rise in material prices

Ticked by default.

Reservation for increases in material prices according to the KBOB indices in force.

Pricing method

Your choice, when printing.

Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).

Retention

Depending on the contractual conditions, the client may apply a retention to your monthly interim payments and to the final account. Studio Devis Suisse lets you set this retention from 0 to 10%. This sum remains blocked until the agreed date or may be released earlier if you provide an equivalent bank or insurance performance guarantee, as provided for in the contract. In the Studio’s copilot, the retention (SIA 118) can be set to 0, 5 or 10% of the total incl. VAT, with 10% as the default; cash discount and retention reduce what you actually collect, whereas the discount and the pro-rata account reduce the quote itself.

Safety: what SUVA accident insurance costs

Occupational accident insurance (SUVA) is paid entirely by the employer: 3.5% of gross pay for the Finishing trades CCT-SOR profile in the Studio. For an employee earning CHF 6'050 a month, that is CHF 211.75 a month at your expense, before a single hour has been worked. This premium is part of the 25% of charges that the Studio builds into your daywork rate.

Daywork and profitability: the real cost of one hour of wall coverings

The most common trap: invoicing on the basis of the hourly wage. An employee with the “Experienced qualified tradesperson (class A)” profile earns CHF 6'050 a month, i.e. CHF 34.38 over 176 paid hours. Once charges of 25.8% (Vaud) and CHF 595 of monthly expenses (meals, travel, equipment) are added, and the result is divided by the 135 genuinely productive hours, one hour costs CHF 60.78, before overheads and margin. You pay for every hour, but you invoice only part of them.

From paid time to productive time (per employee and per year)
StepHours
Paid hours (176 h × 12 months)2'112
Holidays (25 days)−212
Public holidays (9 days)−76
Sickness / accident absences (average)−68
Depot preparation, loading, travel and bad weather−136
Productive hours used by the Studio1'620

How to read this table. Start from the 2'112 paid hours and take away holidays, public holidays, absences and time spent at the depot, loading and travelling: 1'620 billable hours remain, i.e. 77% of paid time.

When to invoice on a daywork basis

Daywork applies to unforeseeable tasks not covered by the unit prices, such as the occasional repair of a deteriorated substrate or delicate removals. It is strongly advisable to have your daywork sheets signed by site management within the agreed deadlines. Depending on the contract concluded, the supplies consumed, the special binders and the travel costs are invoiced on top of the agreed hours.

Reference daywork rates in the Studio, Finishing trades CCT-SOR (Vaud, CHF/h excl. VAT)
ProfileAverage gross monthly payDaywork rate
Finishing trades foreman (CCT-SOR)6'750 CHF106.00
Experienced qualified tradesperson (class A)6'050 CHF96.00
Recently qualified tradesperson (1st to 3rd year after diploma)5'500 CHF88.00
Skilled worker / federal certificate holder (class B)5'300 CHF85.00
Finishing trades assistant (class C)4'850 CHF79.00

How to read this table. Vaud is the reference canton (coefficient 0%). Gross monthly pay is the average wage for the profile; the daywork rate is the hourly rate to invoice, excluding VAT. In another canton, the daywork rate is multiplied by the regional coefficient: the “Experienced qualified tradesperson (class A)” profile goes from CHF 96.00/h in Vaud to CHF 107.50/h in Geneva (+12%). See the page for the canton of Geneva.

Frequently asked questions about quotes for wall coverings (CFC 282)

How can material losses be estimated for wall coverings & wall tiling?

The actual layout determines the waste rate, which depends on the size of the tiles, the complexity of the corners and the alignments required by the sanitary appliances. For large-format wall tiles or a staggered lay, the cuts generate more waste than a classic straight lay. Build this surplus into your supply orders and your price analyses, otherwise you risk running short of tiles from the same batch at the end of the site.

Should wall waterproofing under tiles be priced separately?

In wet rooms, the application of waterproofing under tiles with corner reinforcements is a technical service distinct from the laying of wall tiles. A separate item should be created in your quote, in m², or by the linear metre for the sealing tapes. This clarity protects your margin and avoids any misunderstanding with site management as to the scope included in the price of the covering.

Which collective agreement governs the laying of wall tiles in French-speaking Switzerland?

Companies active in this sector generally come under the CCT-SOR for the finishing trades of French-speaking Switzerland, or under the extended cantonal agreements depending on the location of the site. These texts govern the minimum wages, the travel allowances and the working conditions of tilers. It is necessary to check the applicable agreement with the competent joint committee in order to calculate your real hourly costs correctly.

How should differences in the flatness of the substrate be approached at tender stage?

The tolerances of the structural work often do not match the precision required by rectified wall tiles. State in the remarks of your quote that your prices assume a substrate that complies with the usual flatness standards. Provide an item in the schedule for possible wall levelling or a levelling coat, invoiceable after a joint inspection with site management before your work begins.

From quote to site

Studio Devis Suisse is free and is enough for a one-off quote. When your quotes multiply, two tools take over where the Studio stops: the full price list to cost faster, then site tracking to check the real margin, hour after hour.

The same trade in the 26 cantons

The regional coefficient, the charges and the family allowances change from one canton to another: open the page for the canton of your site to see the daywork rate and the charges that apply there.

Sources and limits. Reference values of Studio Devis Suisse (as at 23.11.2026), CN and CCT-SOR collective agreements, weighted average contribution rates. Indicative only: check the rates of your compensation fund and the collective agreement that applies to your company.