Costing specifics for CFC 271: Plastering & drywall
CFC 271 covers lightweight partitions, wall linings, demountable or fixed suspended ceilings, gypsum plaster coats and the acoustic insulation and fire protection systems. Reference collective agreement in the Studio: CCT-SOR (collective agreement for the finishing trades of French-speaking Switzerland). The Studio’s default measurement unit is m²; the figures below are those of the Studio’s latest update, with Vaud as the starting canton.
The main unit remains the m² for partitions, ceilings and smooth finishing coats. The CAN rules and the applicable SIA standards provide precise methods of measurement, in particular for deducting or keeping the openings of doors and windows. Special services such as cornices, reinforced corners or decoupling strips are counted by the linear metre. Specific openings, access hatches and complex acoustic junctions are priced by the piece. To prevent disputes over the final account, clearly define the measurement principles adopted right from the offer.
| Item | Value in the Studio |
|---|---|
| CFC code | 271 |
| Title | Plastering & drywall |
| Reference collective agreement | CCT-SOR (collective agreement for the finishing trades of French-speaking Switzerland) |
| Default measurement unit | m² |
| VAT applied | 8.1% |
Items often forgotten in a quote for plastering
- Supply and installation of fire-rated or airtight access hatches
- Specific fire-stopping of service penetrations through partitions and ceilings
- Built-in reinforcement profiles for the future support of heavy suspended loads
- Bridging of existing cracks and thorough preparation of the substrates before plastering
- Careful protection of the joinery, glazing and floors already installed by other trades
Neighbouring trades
A building site involves several trades in succession, and each line of a quote carries its own CFC code: you can therefore combine several trades in a single document. Here are the other Studio codes attached to the same cost profile, with their default unit.
| CFC | Title | Default unit | Page |
|---|---|---|---|
| 213 | Structural steelwork | kg | Quote CFC 213 |
| 214 | Carpentry & timber structures | m² | Quote CFC 214 |
| 221 | Joinery & windows | pc | Quote CFC 221 |
| 222 | Sheet-metal work | m² | Quote CFC 222 |
| 224 | Roofing & waterproofing | m² | Quote CFC 224 |
| 226 | Rendering & façade insulation | m² | Quote CFC 226 |
| 228 | Shutters & blinds | pc | Quote CFC 228 |
| 272 | Metal construction & locksmith work | pc | Quote CFC 272 |
| 273 | Interior joinery | pc | Quote CFC 273 |
| 281 | Floor coverings (tiling, parquet) | m² | Quote CFC 281 |
| 282 | Wall coverings & wall tiling | m² | Quote CFC 282 |
| 285 | Painting & wallpapering | m² | Quote CFC 285 |
| 287 | Final site cleaning | m² | Quote CFC 287 |
SIA 118 clauses, retention and SUVA safety
SIA standard 118 governs the contractual relationship between the contractor and the client, provided it is mentioned in the agreement. It specifies the formalities for the joint acceptance of partitions and ceilings, which starts the two-year defects notification period and the right to issue a notice of defects. It also secures the drawing-up of the final account according to the quantities actually executed on site, limiting disputes over joint measurements.
SIA 118 as contractual basis
Tick box (unticked by default).
SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.
Asbestos and pollutants
Ticked by default.
Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).
Rise in material prices
Ticked by default.
Reservation for increases in material prices according to the KBOB indices in force.
Pricing method
Your choice, when printing.
Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).
Retention
On monthly interim payments and on the final account, the client often applies a retention that can be set between 0 and 10% in the costing tool. This sum, intended to cover proper execution of the plastering work, remains blocked temporarily according to the contract or may be released against an equivalent bank guarantee, thus preserving your company’s cash flow. In the Studio’s copilot, the retention (SIA 118) can be set to 0, 5 or 10% of the total incl. VAT, with 10% as the default; cash discount and retention reduce what you actually collect, whereas the discount and the pro-rata account reduce the quote itself.
Safety: what SUVA accident insurance costs
Occupational accident insurance (SUVA) is paid entirely by the employer: 3.5% of gross pay for the Finishing trades CCT-SOR profile in the Studio. For an employee earning CHF 6'050 a month, that is CHF 211.75 a month at your expense, before a single hour has been worked. This premium is part of the 25% of charges that the Studio builds into your daywork rate.
Daywork and profitability: the real cost of one hour of plastering
The most common trap: invoicing on the basis of the hourly wage. An employee with the “Experienced qualified tradesperson (class A)” profile earns CHF 6'050 a month, i.e. CHF 34.38 over 176 paid hours. Once charges of 25.8% (Vaud) and CHF 595 of monthly expenses (meals, travel, equipment) are added, and the result is divided by the 135 genuinely productive hours, one hour costs CHF 60.78, before overheads and margin. You pay for every hour, but you invoice only part of them.
| Step | Hours |
|---|---|
| Paid hours (176 h × 12 months) | 2'112 |
| Holidays (25 days) | −212 |
| Public holidays (9 days) | −76 |
| Sickness / accident absences (average) | −68 |
| Depot preparation, loading, travel and bad weather | −136 |
| Productive hours used by the Studio | 1'620 |
How to read this table. Start from the 2'112 paid hours and take away holidays, public holidays, absences and time spent at the depot, loading and travelling: 1'620 billable hours remain, i.e. 77% of paid time.
When to invoice on a daywork basis
Unforeseen interventions in plastering and drywall, such as exploratory openings, remedial work after changes by other trades or the hacking-off of deteriorated plaster, must be handled as daywork. Write up detailed daywork sheets without delay and have them signed by site management. In addition to the hourly rate agreed under the collective labour agreement, invoice the supplies consumed and any travel provided for in the contract.
| Profile | Average gross monthly pay | Daywork rate |
|---|---|---|
| Finishing trades foreman (CCT-SOR) | 6'750 CHF | 106.00 |
| Experienced qualified tradesperson (class A) | 6'050 CHF | 96.00 |
| Recently qualified tradesperson (1st to 3rd year after diploma) | 5'500 CHF | 88.00 |
| Skilled worker / federal certificate holder (class B) | 5'300 CHF | 85.00 |
| Finishing trades assistant (class C) | 4'850 CHF | 79.00 |
How to read this table. Vaud is the reference canton (coefficient 0%). Gross monthly pay is the average wage for the profile; the daywork rate is the hourly rate to invoice, excluding VAT. In another canton, the daywork rate is multiplied by the regional coefficient: the “Experienced qualified tradesperson (class A)” profile goes from CHF 96.00/h in Vaud to CHF 107.50/h in Geneva (+12%). See the page for the canton of Geneva.
Frequently asked questions about quotes for plastering (CFC 271)
How can acoustic and fire-protection criteria be built into a quote for plastering and drywall?
Check scrupulously the technical data sheets of the complete systems specified by the manufacturers. Price the exact number of boards, the thickness of the framing, the mineral wool required and the resilient strips around the perimeter. A change in board thickness or the omission of a fire-stopping sealant greatly alters the installation time and the cost of materials. Expressly mention the certificate of conformity concerned in the wording of your item.
Which method should be used to measure door openings in lightweight partitions?
Refer to the conventions of the standard item catalogue or to the special clauses of the tender. According to these guidelines, small door openings are generally not deducted from the total area, because of the reinforced framing work and the perimeter cuts required. If the contract provides for the deduction of openings, it is useful to price the forming of reveals and the opening profiles by the linear metre.
Which scaffolding or height constraints should be allowed for with suspended ceilings?
Working at great height tends to slow the output of the fitters and may require specific means of access such as mobile scaffold towers or lifting platforms. Check the height under the slab on the section drawings. Beyond the usual storey heights, it is wise to provide a separate item for the access equipment, according to the contract and the safety rules in force.
Who is responsible for removing waste and board offcuts from the site?
Plaster requires a separate recycling or landfill route, which generates significant skip costs. The offer is best made to state whether removal of the offcuts to the skip is the plasterer’s responsibility or whether the containers and their transport remain at the client’s expense, according to the applicable rules.
From quote to site
Studio Devis Suisse is free and is enough for a one-off quote. When your quotes multiply, two tools take over where the Studio stops: the full price list to cost faster, then site tracking to check the real margin, hour after hour.
The same trade in the 26 cantons
The regional coefficient, the charges and the family allowances change from one canton to another: open the page for the canton of your site to see the daywork rate and the charges that apply there.
- Vaud (VD)
- Geneva (GE)
- Valais (VS)
- Fribourg (FR)
- Neuchâtel (NE)
- Jura (JU)
- Bern (BE)
- Zurich (ZH)
- Zug (ZG)
- Basel-Stadt (BS)
- Basel-Landschaft (BL)
- Aargau (AG)
- Solothurn (SO)
- Lucerne (LU)
- Schwyz (SZ)
- Nidwalden (NW)
- Obwalden (OW)
- Uri (UR)
- St. Gallen (SG)
- Thurgau (TG)
- Schaffhausen (SH)
- Appenzell Ausserrhoden (AR)
- Appenzell Innerrhoden (AI)
- Glarus (GL)
- Graubünden (GR)
- Ticino (TI)