3D rendering of a street lined with apartment buildings, from daytime to dusk – quote template for roofing and waterproofing (CFC 224) in Switzerland

Trade CFC 224 · Finishing trades CCT-SOR · indicative profile

Quote template for roofing and waterproofing (CFC 224): SIA costing, daywork rates and QR-bill deposit

Price your items per m², set your daywork rate, protect your margin and issue a quote ready to sign, with a SIX QR-bill for the deposit.

CFC 224 encompasses the covering of pitched roofs in tiles or slates, bituminous or synthetic waterproofing systems for flat roofs, thermal insulation as well as upstands and perimeter junctions. In Vaud, the employer contributions used are 25.8% of gross pay, plus CHF 595 of monthly expenses and only 135 productive hours out of 176 paid. The Studio builds in these reference values so that your unit prices and your daywork rate cover your real costs, before VAT of 8.1% and the deposit by QR-bill.

Studio Devis SuisseSIA & QR-bill editor · Construction companies
CHF 0 · No account
  • A4 PDF ready to sign
  • SIX QR-bill built in
  • 100% in the browser

Free manual entry · 14’045 ACIP prices & cantons in Soumissions Pro →

Costing specifics for CFC 224: Roofing & waterproofing

CFC 224 encompasses the covering of pitched roofs in tiles or slates, bituminous or synthetic waterproofing systems for flat roofs, thermal insulation as well as upstands and perimeter junctions. The Studio prices this trade with the finishing-trades profile, as an indicative and editable basis: check the collective agreement of your sector. The Studio’s default measurement unit is m²; the figures below are those of the Studio’s latest update, with Vaud as the starting canton.

Measurement is based mainly on the m² for the main areas of roofing, insulation and multi-layer waterproofing. The lengths of ridges, verges, valleys, hips and waterproofing upstands are quantified in linear metres according to the principles of the CAN standard item catalogue. Individual items such as roof penetrations, projections, inspection chambers or rainwater outlets are counted per piece. To prevent disputes at the final account, define explicitly with site management the rules for deducting roof voids and roof openings.

Data sheet for item CFC 224
ItemValue in the Studio
CFC code224
TitleRoofing & waterproofing
Reference collective agreementStudio finishing-trades profile (indicative)
Default measurement unitm²
VAT applied8.1%

Items often forgotten in a quote for roofing and waterproofing

Neighbouring trades

A building site involves several trades in succession, and each line of a quote carries its own CFC code: you can therefore combine several trades in a single document. Here are the other Studio codes attached to the same cost profile, with their default unit.

Other CFC codes with the same profile in the Studio
CFCTitleDefault unitPage
213Structural steelworkkgQuote CFC 213
214Carpentry & timber structuresm²Quote CFC 214
221Joinery & windowspcQuote CFC 221
222Sheet-metal workm²Quote CFC 222
226Rendering & façade insulationm²Quote CFC 226
228Shutters & blindspcQuote CFC 228
271Plastering & drywallm²Quote CFC 271
272Metal construction & locksmith workpcQuote CFC 272
273Interior joinerypcQuote CFC 273
281Floor coverings (tiling, parquet)m²Quote CFC 281
282Wall coverings & wall tilingm²Quote CFC 282
285Painting & wallpaperingm²Quote CFC 285
287Final site cleaningm²Quote CFC 287

SIA 118 clauses, retention and SUVA safety

SIA standard 118 governs the contractual relationship by defining a clear procedure for joint acceptance of the work, precise settlement according to actual measurement and the handling of defect notifications. In particular, it establishes a two-year defects notification period from acceptance. This contractual balance protects the contractor against late disputes, but the standard only takes effect if your quote or the contract for work and services expressly declares it applicable between the parties.

SIA 118 as contractual basis

Tick box (unticked by default).

SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.

Asbestos and pollutants

Ticked by default.

Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).

Rise in material prices

Ticked by default.

Reservation for increases in material prices according to the KBOB indices in force.

Pricing method

Your choice, when printing.

Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).

Retention

Depending on the contractual conditions agreed with the client, a retention may be deducted from each interim payment as well as from the final account. Studio Devis Suisse lets you set this retention from 0 to 10%. This sum remains blocked during the agreed guarantee period or may be released earlier against the provision of an equivalent bank surety bond, in accordance with the agreements in the contract. In the Studio’s copilot, the retention (SIA 118) can be set to 0, 5 or 10% of the total incl. VAT, with 10% as the default; cash discount and retention reduce what you actually collect, whereas the discount and the pro-rata account reduce the quote itself.

Safety: what SUVA accident insurance costs

Occupational accident insurance (SUVA) is paid entirely by the employer: 3.5% of gross pay for the Finishing trades CCT-SOR profile in the Studio. For an employee earning CHF 6'050 a month, that is CHF 211.75 a month at your expense, before a single hour has been worked. This premium is part of the 25% of charges that the Studio builds into your daywork rate.

Daywork and profitability: the real cost of one hour of roofing and waterproofing

The most common trap: invoicing on the basis of the hourly wage. An employee with the “Experienced qualified tradesperson (class A)” profile earns CHF 6'050 a month, i.e. CHF 34.38 over 176 paid hours. Once charges of 25.8% (Vaud) and CHF 595 of monthly expenses (meals, travel, equipment) are added, and the result is divided by the 135 genuinely productive hours, one hour costs CHF 60.78, before overheads and margin. You pay for every hour, but you invoice only part of them.

From paid time to productive time (per employee and per year)
StepHours
Paid hours (176 h × 12 months)2'112
Holidays (25 days)−212
Public holidays (9 days)−76
Sickness / accident absences (average)−68
Depot preparation, loading, travel and bad weather−136
Productive hours used by the Studio1'620

How to read this table. Start from the 2'112 paid hours and take away holidays, public holidays, absences and time spent at the depot, loading and travelling: 1'620 billable hours remain, i.e. 77% of paid time.

When to invoice on a daywork basis

Daywork concerns unforeseeable services that cannot be described as a lump sum, such as tracing complex leaks, urgent local repairs or the one-off renewal of a damaged substrate. It is useful to have the daywork sheets signed regularly by site management. In accordance with the agreed terms, these sheets state the actual hours worked, the specific materials used and the travel or heavy-equipment costs.

Reference daywork rates in the Studio, Finishing trades CCT-SOR (Vaud, CHF/h excl. VAT)
ProfileAverage gross monthly payDaywork rate
Finishing trades foreman (CCT-SOR)6'750 CHF106.00
Experienced qualified tradesperson (class A)6'050 CHF96.00
Recently qualified tradesperson (1st to 3rd year after diploma)5'500 CHF88.00
Skilled worker / federal certificate holder (class B)5'300 CHF85.00
Finishing trades assistant (class C)4'850 CHF79.00

How to read this table. Vaud is the reference canton (coefficient 0%). Gross monthly pay is the average wage for the profile; the daywork rate is the hourly rate to invoice, excluding VAT. In another canton, the daywork rate is multiplied by the regional coefficient: the “Experienced qualified tradesperson (class A)” profile goes from CHF 96.00/h in Vaud to CHF 107.50/h in Geneva (+12%). See the page for the canton of Geneva.

Frequently asked questions about quotes for roofing and waterproofing (CFC 224)

How do you adapt labour costs for a quote in roofing & waterproofing?

The structure of wages and charges varies according to the regions and the collective agreements. For your roofing offers, check precisely the sector agreements applicable in the canton where the work takes place with the competent joint committee. Set your hourly rates by including the unproductive hours due to bad weather as well as the access constraints specific to the site, without relying on generic finishing-trades averages.

Which safety measures should be included in the pricing of a roof?

Work at height calls for sustained attention to accident prevention. In your calculation you must allow for collective protective equipment, the anchoring of lifelines, under-roof nets and coordination with the scaffolder in accordance with the SUVA directives and the OTConst. Omitting these logistics or edge-protection items from the initial quote generates direct costs that cannot be recovered.

How should junctions with sheet-metal work carried out by a third party be handled?

Describe carefully the interface between the roofing and the sheet-metal work in the quote. State whether the supply and installation of drip edges, box gutters or junction strips form part of your services or those of another company. This clear demarcation prevents interruptions to the works and sets out unambiguously the responsibilities in the event of later infiltration along the upstands.

How do you plan temporary protection against bad weather?

When re-roofing an occupied building or installing moisture-sensitive insulation, making the roof temporarily weathertight represents a substantial amount of work. Price explicitly the daily sheeting, the installation of welded temporary vapour barriers and emergency call-outs in the event of a sudden storm. Specify in the contract the limit of these services so that prolonged weather monitoring does not weigh on your margins.

From quote to site

Studio Devis Suisse is free and is enough for a one-off quote. When your quotes multiply, two tools take over where the Studio stops: the full price list to cost faster, then site tracking to check the real margin, hour after hour.

The same trade in the 26 cantons

The regional coefficient, the charges and the family allowances change from one canton to another: open the page for the canton of your site to see the daywork rate and the charges that apply there.

Sources and limits. Reference values of Studio Devis Suisse (as at 23.11.2026), CN and CCT-SOR collective agreements, weighted average contribution rates. Indicative only: check the rates of your compensation fund and the collective agreement that applies to your company.