3D rendering of a living room in beige tones, with finished walls and ceilings – quote template for floor coverings (CFC 281) in Switzerland

Trade CFC 281 · Finishing trades CCT-SOR

Quote template for floor coverings (CFC 281): SIA costing, daywork rates and QR-bill deposit

Price your items per m², set your daywork rate, protect your margin and issue a quote ready to sign, with a SIX QR-bill for the deposit.

CFC 281 covers the laying of interior floor coverings, including tiling, parquet, resilient floors, levelling screeds and waterproofing under tiles, as well as the associated skirting boards and transition profiles. In Vaud, the employer contributions used are 25.8% of gross pay, plus CHF 595 of monthly expenses and only 135 productive hours out of 176 paid. The Studio builds in these reference values so that your unit prices and your daywork rate cover your real costs, before VAT of 8.1% and the deposit by QR-bill.

Studio Devis SuisseSIA & QR-bill editor · Construction companies
CHF 0 · No account
  • A4 PDF ready to sign
  • SIX QR-bill built in
  • 100% in the browser

Free manual entry · 14’045 ACIP prices & cantons in Soumissions Pro →

Costing specifics for CFC 281: Floor coverings (tiling, parquet)

CFC 281 covers the laying of interior floor coverings, including tiling, parquet, resilient floors, levelling screeds and waterproofing under tiles, as well as the associated skirting boards and transition profiles. Reference collective agreement in the Studio: CCT-SOR (collective agreement for the finishing trades of French-speaking Switzerland). The Studio’s default measurement unit is m²; the figures below are those of the Studio’s latest update, with Vaud as the starting canton.

For floor coverings, the net area is priced mainly in m², while skirting boards, edge profiles and expansion joints are measured in linear metres. Door thresholds, complex cuts or special junctions are priced by the piece or as a lump sum. Levelling or the correction of flatness may require an estimate by the bag or by the m². To avoid disputes over the final account, apply rigorously the rules for deducting openings defined by the CAN standard item catalogue (NPK) and record the actual areas on approved laying plans.

Data sheet for item CFC 281
ItemValue in the Studio
CFC code281
TitleFloor coverings (tiling, parquet)
Reference collective agreementCCT-SOR (collective agreement for the finishing trades of French-speaking Switzerland)
Default measurement unitm²
VAT applied8.1%

Items often forgotten in a quote for floor coverings

Neighbouring trades

A building site involves several trades in succession, and each line of a quote carries its own CFC code: you can therefore combine several trades in a single document. Here are the other Studio codes attached to the same cost profile, with their default unit.

Other CFC codes with the same profile in the Studio
CFCTitleDefault unitPage
213Structural steelworkkgQuote CFC 213
214Carpentry & timber structuresm²Quote CFC 214
221Joinery & windowspcQuote CFC 221
222Sheet-metal workm²Quote CFC 222
224Roofing & waterproofingm²Quote CFC 224
226Rendering & façade insulationm²Quote CFC 226
228Shutters & blindspcQuote CFC 228
271Plastering & drywallm²Quote CFC 271
272Metal construction & locksmith workpcQuote CFC 272
273Interior joinerypcQuote CFC 273
282Wall coverings & wall tilingm²Quote CFC 282
285Painting & wallpaperingm²Quote CFC 285
287Final site cleaningm²Quote CFC 287

SIA 118 clauses, retention and SUVA safety

SIA standard 118 precisely governs the contractual relationship between the client and the contractor for the laying of floors, provided your contract expressly declares it applicable. It defines the process for acceptance of the work, the formal reporting through the notice of defects and the application of the two-year defects notification period. Where payment is based on actual measurement, it guarantees a transparent and fair method of calculation for drawing up the accounts.

SIA 118 as contractual basis

Tick box (unticked by default).

SIA standard 118 “General Conditions for Construction Work” forms part of the contract, in addition to the Swiss Code of Obligations.

Asbestos and pollutants

Ticked by default.

Reservation in the event of asbestos or other pollutants not detected before the work (OTConst).

Rise in material prices

Ticked by default.

Reservation for increases in material prices according to the KBOB indices in force.

Pricing method

Your choice, when printing.

Unit prices, settlement according to actual measurement (Art. 374 CO) — or fixed lump-sum price (Art. 373 CO).

Retention

According to the conditions agreed in the contract for work and services, the client may apply a retention to the successive interim payments and to the final account, which our tool lets you set from 0 to 10%. This blocked sum may be released at the agreed term or replaced by an equivalent bank guarantee, ensuring proper execution of the floor finishes without unduly penalising your operating cash flow. In the Studio’s copilot, the retention (SIA 118) can be set to 0, 5 or 10% of the total incl. VAT, with 10% as the default; cash discount and retention reduce what you actually collect, whereas the discount and the pro-rata account reduce the quote itself.

Safety: what SUVA accident insurance costs

Occupational accident insurance (SUVA) is paid entirely by the employer: 3.5% of gross pay for the Finishing trades CCT-SOR profile in the Studio. For an employee earning CHF 6'050 a month, that is CHF 211.75 a month at your expense, before a single hour has been worked. This premium is part of the 25% of charges that the Studio builds into your daywork rate.

Daywork and profitability: the real cost of one hour of floor coverings

The most common trap: invoicing on the basis of the hourly wage. An employee with the “Experienced qualified tradesperson (class A)” profile earns CHF 6'050 a month, i.e. CHF 34.38 over 176 paid hours. Once charges of 25.8% (Vaud) and CHF 595 of monthly expenses (meals, travel, equipment) are added, and the result is divided by the 135 genuinely productive hours, one hour costs CHF 60.78, before overheads and margin. You pay for every hour, but you invoice only part of them.

From paid time to productive time (per employee and per year)
StepHours
Paid hours (176 h × 12 months)2'112
Holidays (25 days)−212
Public holidays (9 days)−76
Sickness / accident absences (average)−68
Depot preparation, loading, travel and bad weather−136
Productive hours used by the Studio1'620

How to read this table. Start from the 2'112 paid hours and take away holidays, public holidays, absences and time spent at the depot, loading and travelling: 1'620 billable hours remain, i.e. 77% of paid time.

When to invoice on a daywork basis

Unforeseeable work, such as hacking off an old adhesive containing asbestos, the unplanned re-profiling of a deteriorated substrate or occasional remedial work after other trades have passed through, must be handled as daywork. It is useful to draw up daywork sheets detailing the hours worked, countersigned by site management. According to the contractual agreements, the supply of special mortars and adhesives and the travel costs are invoiced on top.

Reference daywork rates in the Studio, Finishing trades CCT-SOR (Vaud, CHF/h excl. VAT)
ProfileAverage gross monthly payDaywork rate
Finishing trades foreman (CCT-SOR)6'750 CHF106.00
Experienced qualified tradesperson (class A)6'050 CHF96.00
Recently qualified tradesperson (1st to 3rd year after diploma)5'500 CHF88.00
Skilled worker / federal certificate holder (class B)5'300 CHF85.00
Finishing trades assistant (class C)4'850 CHF79.00

How to read this table. Vaud is the reference canton (coefficient 0%). Gross monthly pay is the average wage for the profile; the daywork rate is the hourly rate to invoice, excluding VAT. In another canton, the daywork rate is multiplied by the regional coefficient: the “Experienced qualified tradesperson (class A)” profile goes from CHF 96.00/h in Vaud to CHF 107.50/h in Geneva (+12%). See the page for the canton of Geneva.

Frequently asked questions about quotes for floor coverings (CFC 281)

How can cutting waste be estimated for a quote for floor coverings (tiling, parquet)?

The percentage of over-consumption varies according to the layout and the format chosen. A classic straight lay on a regular surface generates few offcuts, whereas a diagonal lay, a herringbone lay or the use of large-format tiles in partitioned rooms requires an appreciable increase in the area purchased. It is often recommended to include a reserve for the client’s stock, to cover any future replacements.

Should substrate preparation be included in the price per m² of the floor covering?

It is preferable to separate clearly the laying of the covering from preparatory operations such as sanding the screed, applying a primer or self-levelling. This distinction protects your margin if the actual condition of the slab proves not to comply with the usual tolerances when you arrive on site, making it possible to adjust the quantities without any dispute with site management.

Which collective agreement applies to tiling and parquet-laying staff in French-speaking Switzerland?

Companies active in the laying of floor coverings in French-speaking Switzerland are generally subject to the provisions of the CCT-SOR (collective agreement for the finishing trades of French-speaking Switzerland). You must check carefully the wage classifications, the travel allowances and the social contributions set by the competent joint committee in order to calculate a compliant hourly rate when drawing up your offers.

How should waterproofing under tiles in bathrooms be priced in accordance with good practice?

Waterproofing under tiles is not just a simple liquid coat. The quote must quantify the vertical and horizontal area treated in m², but also provide in linear metres for the corner reinforcement tapes, the sealing collars for pipe penetrations and the watertight junctions to floor channels or floor drains. Provide for this item under a separate CAN article to reflect its real technical value.

From quote to site

Studio Devis Suisse is free and is enough for a one-off quote. When your quotes multiply, two tools take over where the Studio stops: the full price list to cost faster, then site tracking to check the real margin, hour after hour.

The same trade in the 26 cantons

The regional coefficient, the charges and the family allowances change from one canton to another: open the page for the canton of your site to see the daywork rate and the charges that apply there.

Sources and limits. Reference values of Studio Devis Suisse (as at 23.11.2026), CN and CCT-SOR collective agreements, weighted average contribution rates. Indicative only: check the rates of your compensation fund and the collective agreement that applies to your company.