Swiss QR-bill Generator and Validator: payment part, PDF and QR check
Enter the account, the reference and the addresses: the tool builds the QR text, checks it rule by rule, draws the payment slip (receipt and payment part, 210 × 105 mm, Swiss cross in the centre of the code) and exports it as an A4 PDF. It also checks the text of an existing QR. Free, no account needed, and nothing leaves your browser.
Interactive tool
Move from calculation to full management
Keep your references at hand, then automate them in your quotes, bids and final statements.
Tool guide
How to create a QR-bill with this tool
1. Account, reference type and number
Enter the IBAN of your account (spaces are accepted): the tool recognises a QR-IBAN (bank identification from 30000 to 31999) and then selects the QR reference; with an ordinary IBAN, choose the creditor reference « RF » or no reference. For a reference, enter a number (that of your invoice, for example) and press « Calculate the check digit »: the tool fills in the zeros and the check digit (27 digits for a QR reference) or adds « RF » and the ISO 11649 key (creditor reference).
2. Addresses, amount, message
Your address is mandatory, in structured format: name, street, number, postcode, town and country. The debtor's is optional: if you leave it empty, the slip prints a « Payable by » field to be filled in by hand; likewise, without an amount (donation, amount chosen by the debtor), a 40 × 15 mm field is provided. The message (« Additional information ») and the coded billing information must not exceed 140 characters together. The « notice » box produces an information slip at 0.00 with the words « NOT FOR PAYMENT » in the chosen language.
3. Export: A4 PDF, SVG, QR text
The A4 PDF places the slip at the bottom of the page (210 × 105 mm, cutting lines with scissors); the top of the page carries, if you wish, your address, the recipient's and free text that does not go into the QR. The SVG file contains the slip alone, as a vector graphic. The QR text can be copied for use in other invoicing software. Always print at 100 % (« actual size »).
What the tool checks, rule by rule
The same engine (a PHP service and this page's JavaScript, which give identical results on a test corpus) applies the rules below, taken from the Swiss Implementation Guidelines for the QR-bill. An error is reported with the QR line number and the field concerned; a warning flags a tolerated or watch-worthy deviation.
| Item | Checked rule | IG chapter |
|---|---|---|
| Structure | At least 31 lines, at most 34; separator “LF” or “CR+LF” (one type only, never “CR” alone); at most 997 bytes UTF-8 (QR version 25, level M). | 4.1.4, 6.2 |
| Header | “SPC”, version “0200”, coding “1”. | 4.2.2 |
| IBAN | 21 characters without spaces, capitals, country CH or LI, exact modulo 97 check digit. | 4.2.2 |
| Addresses | Type “S” only; name 70, street 70, number 16, postcode 16, town 35 characters at most; postcode, town and country mandatory; country = ISO 3166-1 code (249 codes). | 4.2.2, 4.3.1 |
| Ultimate creditor | The 7 lines remain empty (future use). | 4.2.2 |
| Amount and currency | From 0.01 to 999999999.99, two decimals, decimal point, no leading zero; 0.00 reserved for the “do not pay” notice; CHF or EUR. | 3.5.3, 4.2.2, 4.4 |
| Reference | QRR: 27 digits, recursive modulo 10 check digit, not only zeros, with a QR-IBAN. SCOR: « RF » + 2 check digits (modulo 97-10) + 1 to 21 alphanumeric characters, with an ordinary IBAN. NON: empty reference. | 2.12, 4.2.2, 4.3.2, Annex B |
| Message and billing | 140 characters at most altogether; billing information starting with “//”; alternative procedures of at most 100 characters, two at most. | 4.2.2, 4.3.3 |
| Characters | Basic Latin, Latin-1, Latin Extended-A, Ș ș Ț ț and the euro sign (U+20AC); nothing else. | 4.1.1 |
| From version 2.4 | The QR reference (QRR) is no longer permitted in EUR (error in version 2.4, warning in 2.3); in EUR, a message accompanying a structured reference is not always transmitted (warning). | 2.10, 2.12, 4.3.3 (IG 2.4) |
Which version of the standard, read when?
The documents were downloaded and read on 7 November 2026 on the SIX website (six-group.com); these are the only texts this page relies on.
| Document | Date of the document | Application |
|---|---|---|
| Implementation Guidelines QR-bill v2.3 (in English) | 20 November 2023 | In force since 21 November 2025 (the SIX page gives 22 November 2025 for the new requirements); valid until November 2027. |
| Implementation Guidelines QR-bill v2.4 | 24 February 2026 | Introduced with the SIC update of 13 November 2026, valid from 14 November 2026. |
| Style Guide QR-bill v1.1 | 19 December 2025 (as stated by SIX) | In force since 1 January 2026. |
| SIX data examples (archive “samples-data-schema”) | March 2021 | Prior to v2.3: 9 examples out of 18 still use the “K” address. |
Points where the sources do not agree
(1) Date of entry into force of v2.3: 21 November 2025 in the document, 22 November 2025 on the SIX page. (2) The SIX page states that « the introduction of the structured address remains planned for November 2026 », whereas v2.3 already removes type « K » and SIX's 2025 factsheets ask to issue only structured addresses from 21 November 2025, with a brief transition period for invoices already sent; the only November 2026 date we find in these factsheets is the one by which banks must have adapted standing orders and templates (13 November 2026). We could not explain the sentence on the SIX page; this page applies the text of the guidelines: « S » only. (3) Annex A of v2.3 prints, for its example no. 4, the reference RF72 0191 2301 0040 5JSH 0438, whose check key fails modulo 97; the correct key is 24, as in data example no. 17 published by SIX. The example that can be loaded into the tool uses the corrected key. (4) The Style Guide prints « NE PAS UTILISER PUR LE PAIEMENT » and « Pagabile da » for the Italian of « Payable to »: the page follows the guidelines (« POUR », « Pagabile a »).
The payment part: dimensions and layout
The receipt measures 62 × 105 mm and sits to the left of the 148 × 105 mm payment part: together 210 × 105 mm, at the bottom of the A4 page. The margins are 5 mm. The QR code measures 46 × 46 mm, in the smallest possible version (error-correction level M, never more than 997 bytes), with a 5 mm quiet zone and, at the centre, the 7 × 7 mm Swiss cross whose geometry follows SIX's official file. The titles are 11 pt bold, the headings 8 pt bold and their values 10 pt (6 and 8 pt on the receipt), in Helvetica, one of the four permitted fonts, in black. The empty fields (« Payable by » of 65 × 25 mm, amount of 40 × 15 mm, or 52 × 20 and 30 × 10 mm on the receipt) are marked with 3 mm corner marks. Text positions were taken from the 1:1 scale examples in the Style Guide, to within a few tenths of a millimetre.
The IBAN is printed in groups of 4 characters, the QR reference in groups of 5 (starting with the first 2 digits) and the RF reference in groups of 4. The amount carries the currency before it, a space as thousands separator and two decimals. For an address outside Switzerland, the country code precedes the postcode.
What is not verified
No bank and no post office counter has received these slips: never say they are « accepted by banks » before your own test. Also not verified: the existence of the bank (the official list of identifiers is not integrated), the correctness of the address, the match between the name entered and the account holder (the standard requires them to match), rendering on your printer and its paper, the QR readers of all banking software, the content of the billing information (its syntax is that of the body that defined it, for example Swico) and the alternative procedures (eBill), whose printing has not been compared with a published example. The QR of this page was re-read with an independent decoder and compared module by module with another generation library; this proves that the code reads and computes correctly, not that your bank accepts it.
Privacy, data protection and limits
Where does your data go?
Nowhere: this page sends no invoice data, does not keep it in your browser and calls no QR generation service. The code is computed by an encoder written for this page. A QR-bill contains names, addresses and an IBAN: the PDF file and the QR text are yours, and sharing them is your responsibility.
What the tool does not do
It does not read a QR image (paste the text read by your banking app), does not handle sending by e-mail or invoice numbering, does not produce a complete invoice (TVA, detail lines) and only prints the standard fonts: letters outside French, German and Italian may lose their accents on paper. It replaces neither your invoicing software nor your bank's advice. To cost a job before invoicing it, see Art Construction's Soumission software and the ACIP (Art Construction Indice de Prix) index; tool 3.3 on change orders helps calculate a supplement before invoicing it.
Frequently asked questions about the QR-bill (FAQ)
1. Is the data of my invoice sent to Art Construction?
No. The form, the QR code calculation, the preview and the PDF and SVG files are produced in your browser: no route of the site receives an IBAN, address, amount or message, and the page writes nothing to your browser (no cookie, no local storage). A slip contains personal data (names, addresses, IBAN): share only what is necessary (Federal Act on Data Protection, LPD).
2. Will my bank accept this payment part?
We do not know: the slip produced here has not been tried at a bank or at a post office counter. The content of the QR is checked against the rules of the SIX guidelines (see the list below) and the drawing follows the Style Guide's dimensions, but only a real test proves it. Before sending invoices in bulk, print one, pay it in e-banking with a small amount and check that all data (IBAN, reference, amount, addresses) are picked up correctly. SIX also offers a validation portal on its « tools » page; we did not use it for this page.
3. Which version of the standard is applied?
The « Swiss Implementation Guidelines for the QR-bill » (IG) version 2.3, valid since 21 November 2025 (the SIX page gives 22 November 2025 for the new requirements) and until November 2027, and version 2.4, valid from 14 November 2026. Both were read on 7 November 2026 on six-group.com, together with Style Guide 1.1 (in force since 1 January 2026). Version 2.4 brings no technical change for billing in CHF; in EUR, only IBAN + creditor reference or IBAN without reference remain possible. Choose the version in the form: by default, the one in force on your device's date.
4. Why is my “combined” address (type K) rejected?
Because version 2.3 of the standard abolished address type « K »: only the structured address « S » (name, street, number, postcode, town, country separate) is accepted in the QR. SIX's 2025 factsheets leave only a short transition period for invoices already issued with « K »; a new QR-bill must use « S ». The 18 data examples published by SIX in 2021 still mix both types: the 9 in « S » are recognised as valid by this page, the 9 in « K » are rejected for this reason.
5. What is the difference between IBAN and QR-IBAN, QR reference and RF reference?
A QR-IBAN is a Swiss or Liechtenstein IBAN whose positions 5 to 9 (bank identification) are between 30000 and 31999: it is used only with a 27-digit QR reference whose last digit is a check digit (recursive modulo 10). An ordinary IBAN is used with a creditor reference « RF » (ISO 11649, 5 to 25 characters, modulo 97 key) or without a reference. The « Calculate the check digit » button completes your invoice number. From version 2.4, the QR reference is no longer accepted in EUR.
6. Can I print the PDF on ordinary paper?
To pay in e-banking or with your bank's app, the PDF is enough. For a payment at the counter or by paper order, the standard requires a 210 × 105 mm slip on perforated white paper of 80 to 100 g/m², printed at exact scale (« actual size »), with a perforation between the invoice and the slip and between the receipt and the payment part. A slip that does not respect the dimensions may be refused or charged additional fees (IG, chapter 3.8).
7. Why do some letters lose their accent in the PDF?
The PDF uses the standard Helvetica font (one of the four permitted fonts), which does not contain all the letters the standard tolerates in the QR (Latin Extended-A: č, ł, ő...). These letters are printed without accents; the page points them out to you, and the QR keeps the exact text. The letters of French, German and Italian are all drawn.
8. Can the Swiss cross be used freely?
The standard specifies that SIX Interbank Clearing holds the rights to the image of the white cross at the centre of the QR and that any deviation from the guidelines infringes its rights. The cross on this page follows the geometry of the official file published by SIX (7 × 7 mm): use it as the guidelines provide, for genuine compliant QR-bills, and not for other purposes.
